Reference no: EM133500580
Assignment: Software Design and Development Paper
In this assignment, you will provide further details about the enterprise application outlined in the project proposal of assignment. More specifically, you are required to submit a progress report covering the following items:
1. Detailed user stories: Break down the high-level user requirements into detailed user stories. User stories should be simple, concise and clear. Each user story should capture a specific functionality and keep focus on the user. The format of the user story should be as follows: "As a [type of user], I [want to do], [so that.]"
2. Wireframes of all user interfaces: Provide wireframes of all user interfaces. Wireframes can be hand drawn or created using drawing software. Alternatively you can create mockup screens and take screenshots of those.
3. Major data structures: Provide UML diagrams for the classes and entity-relationships (ER) that form the basis of your enterprise application's data structure.
4. Database schema: Show the database entities (tables), their attributes and relationships in the database.
5. Software architecture illustrating all components: Specify the software architecture (e.g., frontend-backend-database, model-view-controller), and draw a diagram illustrating all components of the software architecture, and data flow between those components.
6. Platforms/languages/tools/frameworks
7. Specify on what platforms you will develop your enterprise application frontend and backend, and on what platform you will create your database. List the programming languages and tools you will use to develop the app. Mention the frameworks you will use to develop the frontend and backend.
8. Platform examples: frontend - JavaScript, Java, backend - Java EE 8, Jakarta EE 8, database - MySQL, PostgreSQL, Mongo DB, or Derby
9. Language examples: Java, JavaScript.
10. Tool examples: Apache NetBeans, SceneBuilder, Apache Tom EE 8.0.0
11. Framework examples: JavaFX, Java Server Faces, Jakarta Faces
12. Note: You can use only platforms that were covered in your major or minor units. For example, you are not allowed to use PHP for your project.
13. Test plan (should include user acceptance test): Specify what tests will be performed, e.g. unit test, integration test, functional test, user acceptance test. Also specify the test cases for the user acceptance test.
14. Project tracking tool: You must use a project tracking tool (e.g., Jira) to track the progress of your software development project. You can choose any project tracking tool you wish. Specify the name of the project tracking tool that you are going to use.