Provide the overall material of project design

Assignment Help Other Engineering
Reference no: EM131454954

General Instructions:

1. The final project design & implementation report should be submitted to candidate's supervisor for review well in advance as per the instruction given by supervisor.

2. The final project design & implementation report should be hard bound (One Copy: A copy for External Examiner review) and it should be submitted at least two (working) days before the final presentation.

3. The color of front cover binding for the project design & implementation report should be BLUE, for all the project design and implementation students.

4. The front cover of the report should be in printed form along-with the MEC logo. The required print spacing on front cover page is as follows.

Top: 1.0 inches, Left: 1.5 inches, Right: 1.0 inches, Bottom: 1.0 inches.

5. Only one side of the page should be printed. The other side should be left blank.

6. The font used should be TIMES NEW ROMAN, 18 Points for chapter number and chapter title, 16 points for sections, 14 points for subsections and 12 Points for the running text with 1.5 line spacing between two consecutive lines. Footnotes shall be single spaced typing.

7. Use "Justification" alignment for the running text or body of the text.

8. Use "Center Justification" for chapter headings.

9. Use "Left Justification for Section Heading / sub-section headings"

10. The page number should be in footer at middle.

11. The students are also required to provide the overall material of project design & implementation report on CD (Total 3 CD; 2 CD should contain project presentation, project report and program if any, 1 CD should contain project report and project presentation only without complete program) to the concerned project supervisor.

Only the project design & implementation reports according to the above format will be considered and graded. The details about the structure of project design & implementation report are enclosed.

1. INTRODUCTION

The ECU in Today's generation is the key for the sale of automobiles. The automobiles industry has shown a drastic increase in sales all these are due to the advancement in the Technology. The project proposes a LIN based protocol control for the electronic system in the Car. This chapter gives a brief introduction about the project objectives Firstly describing background, objectives, aim, limitations and overview of the project report.

1.1 Project Back Ground:

To get some structure of all the hardware in a vehicle today some of ECU's (Electronic Control Unit) exists that handles the control of different capacities and connect with each other over some sort of on-board system. Each ECU in the vehicle is associated with various segments e.g. valves, sensors, actuators and servomotors from which it gathers data and to which it sends charges. Today the quantity of ECU's and especially the wiring in vehicles are at a level where one needs to take the expense and space required into genuine thought while including new usefulness and planning new models. Not only the expense and space for wiring is turning into an issue in present day vehicles additionally the expanding size of the model program that the new usefulness empowers. Distinctive models require diverse wiring at generation time and troubles emerge when the quantity of adaptations to be taken care of turns out to be too vast. The expense of adaptability turns out to be high.

1.2 Project objectives:

- The Speed of the vehicle can be varied for different speeds.

- Alarm Indication when Vehicle is in reverse gear and also when any obstruction behind.

- Temperature, GPS position and location Indication in the cluster.

1.3 Project overview
This Project contains of entire six units .The first unit gives the introduction about the scheme .The second unit gives the literature review of the scheme ,in the sense it gives how the improvement happened from previous methods .The third unit gives the how the project works and develop i,e in the methodology .The fourth unit gives the budget and Gantt chart of the scheme .The fifth unit the components of hardware and software is used to design the scheme and explains about the basic block diagram of the project .Finally the sixth section gives the conclusion and appendix of the project.

1.4 Project limitations:

- The System contains GPS which provides only the Co-ordinates and not the exact name of the location. .
- The system doesn't have a redundant for the Power supply failure
- The fuel Level Indication is Digital shows High and low as Values
- The System doesn't have the ABS to sensors to Locking of the wheel.
- The Mechanical Enclosure Issue is not been addressed.

Attachment:- REPORT FORMAT.rar

Verified Expert

There were 2 files. There was a file for rules. I have applied the rules to edit the given report file. The rules were related to font size, style, alignment, pattern etc. The format given has been applied to the pdf given.

Reference no: EM131454954

Questions Cloud

Scm network design is critical to their success : At Zara, a good SCM network design is critical to their success. Name and give examples of three things Zara did to make their supply chain successful.
What is salary range and average income for people working : What is the salary range and average income for people working in that field? What level of education is required to work in that career field?
Compute the sample correlation coefficient for the data : he Dow Jones Industrial Average (DJIA)and the Standard & Poor's 500 Index (S&P 500) are both used to measure the performance of the stock market.
Choose an influential civil rights figure : Prepare an outline communicating that figure's relevance in today's modern era. Why and how is this figure important today?
Provide the overall material of project design : Design & implementation report should be submitted to candidate's supervisor for review well in advance as per the instruction given by supervisor.
Develop a monthly cash budget for james confectioners : Develop a monthly cash budget for James Confectioners for the upcoming year. Prepare Poll Auto Parts' cash budget for January and February.
Compute the weighted mean : Compute the sample mean of the four data values without weighting. Note the difference in the results provided by the two computations.
Discuss the civil rights leader from the mid-20th century : The style of project is a multimedia presentation with both audio and video components; however, the medium is up to you.
Compute the sample mean : Compute the sample mean. Compute the sample variance and sample standard deviation.

Reviews

inf1454954

4/22/2017 5:59:13 AM

Please let the expert realize that he/she has made a stunning showing with regards to and cleared every one of the errands with putting an extraordinary measure of time in this work, I value his/her exertion and if in future i run over any hard ventures or assignments i would love to return here and request offer assistance.

inf1454954

4/22/2017 5:56:23 AM

Let us know your full requirement? Do you want editing pdf file only? sand for me the blue link for payment The PDF is the main file for the first semester , we have to update it like the guide lines in the word files The PDF file should be edited via the word guide lines I have edited the pdf file according to the rules in word file. And converted that pdf file to word file.

len1454954

4/8/2017 2:06:58 AM

The Schedule made in order to achieve in the functionality was on time and the Overall system Performance is better. The entire requirement Generated is studied in detail and analysis is made before proceeding. The software tools are used to achieve the Objective

len1454954

4/8/2017 2:06:51 AM

The Logical error can be determined by simulation. The simulated system is implemented on the breadboard and connections are made to test the exactness of the system This Project is of good help people in order to control the car automatically. The smart System developed is being tested in the real environment. This Project is of great importance in the field of Car manufacturing The LIN protocol serves as good platform for Development of ECU which reduces the Manufacturing cost .Which leads to the growth of the automobile industry. The Materials referred are cited in this Project report.

len1454954

4/8/2017 2:06:43 AM

dear sir i wont this assignment to do as edit the PDF fill as the word file some chapters still didn't write - The Project Objective is to Design and Develop an ECU unit in a car. The person driving the car has to know the current temperature, The Fuel level, in order that the person can manage to fill fuel and Plan his Trip all of these indications are displayed in the LCD. The unit has a Switch based gear changing to control the Speed and Reverse Gear Control. The obstruction detection when the car in reverse gear, The Roof Top opening and closing is simulated using Proteus Software.

Write a Review

Other Engineering Questions & Answers

  Milestone two guidelines and rubric overview

Business law impacts our everyday lives, both personally and professionally. Businesses enter contracts, manufacture goods, s ell services and products, and engage in employment and labor practices - activities that must all adhere to certain laws..

  The following system of non-linear equations

1. In an Excel worksheet titled "Solver", solve the following system of non-linear equations using the Solver and find u, v, and t. Eqn

  Calculate the volumetric flow rate

Calculate the volumetric flow rate and the mass flow rate and determine the average flow velocity of the air and the air quantity flowing

  Extend the parts list spreadsheet constructed

Note that the cost analysis spreadsheet will be finalized and updated after the circuit or system is built and tested. Thus, it is expected that minor adjustments will be made to the component values initially chosen in order to achieve the desire..

  Which elements are in series

Consider the circuit shown in Figure. Which elements are in series? Which elements are in parallel? Apply Ohm s and Kirchhoff s laws to solve for Vx.

  Write a paper about sampling and data collection plan

Write a paper about Sampling and Data Collection Plan. Using the scenario and two variables your learning team developed for the Business Research Project assignment

  Compute the critical edge load

Compute the critical edge load NxCR for a plate simply supported around the boundary, with length a = 2 m (along x), width b = 1 m, t = 1 cm.

  Estimate of building cost of the structural works

Estimate of building cost of the Structural Works for the Carbon Revolution Building - You are members of the Capital Projects Team of Facility Services Department

  Corresponding velocity of the center

A uniform sphere of radius r is placed at corner A and is given a slight clockwise motion. Assuming that the corner is sharp and becomes slightly embedded in the sphere, so that the coefficient of static friction at A is very large, determine

  Draw a truth table for a 4-bit clz circuit

Some arithmetic logic unit's implement a count leading zeros (CLZ) function that takes an unsigned 2n-bit number as input, and outputs the number of consecutive 0's from the MSB until the first 1. Draw a truth table for a 4-bit CLZ circuit

  Calculate the corresponding delay-power product

A particular logic gate has tPLH and tPHL of 30 ns and 50 ns, respectively, and dissipates 1 mW with output low and 0.6 mW with output high. Calculate the corresponding delay-power product (under the assumption of a 50% duty-cycle signal and negle..

  Enmin 5120 tunnelling and mine development a continuous

a continuous miner has the following specifications ltbrgtcutter drum width 3.2m ltbrgtdrum diameter across the picks

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd