Provide the instructor with a resource plan for your project

Assignment Help Project Management
Reference no: EM131599496

Assignment

In this section of your project you will break down your project tasks into the knowledge areas studied in this and previous units and provide the following:

• A budget with cost breakdowns (You may prefer to use the templates for Budget Plan provided)

Excel Budget Plan Template

• A schedule to include any critical paths that might exist and/or any dependencies between specific tasks. (You may prefer to use the templates for Project Schedule provided)

Excel Project Schedule Template

• Provide the instructor with a resource plan for your project. (You may use the templates for Resource Plan provided)

Excel Resource Plan Template

• In a paper that is a minimum of 3 pages long, based on your calculations found using the provided templates, what is the total budget for this project? According to this analysis, identify clearly and concisely at least three areas where you see potential cost savings.

• For each of these areas of opportunity using your understanding of the project, explain a potential change in plan to reduce costs in the project. When making recommendations for cost reductions how can you ensure these cost reductions are in the best interest of the company, i.e. you aren't sacrificing quality in order to cut costs.

• Your submission should follow the essentials of APA (i.e., cover page, double-spaced, 12 pt. font, reference section at the end, in-text citations, etc.).

Would you like information about how to format in APA?

• Papers should be spell-checked and submitted to Grammarly prior to submitting your paper to the drop box.

o *Grammarly instructions can be accessed

Grammarly handout

Grammarly Student User Guide.

Reference no: EM131599496

Questions Cloud

How do you interpret beta : In a regression problem someone wants to study the effect of fuel additive on mpg of midsize cars in highway driving.
Quartiles and the interquartile range : The following data give the speeds of 13 cars (in mph) measured by radar, traveling on I-84.
What are the tools and ways that project managers monitor : What are the tools and ways that project managers monitor and control projects? What are good methods of monitoring?
Find the summary statistics : The following table gives the scores obtained by the students in a midterm test (X) and the final (Y). We want to see how well the final score
Provide the instructor with a resource plan for your project : Provide the instructor with a resource plan for your project. (You may use the templates for Resource Plan provided).
Prepare a flexible budget performance report : Prepare a flexible budget performance report showing any variances between budgeted and actual results. List fixed and variable expenses separately
Customer survey asked about agreement : One variable is the customer survey asked about agreement that SPSS products are a good value (gdvalue).
Write a paper about the relation between sexism and sport : Write a paper about the relation between sexism and sport. Only allowed to use academic sources (books and journal articles). Consult 4 academic sources.
Racetracks consists of selecting the? first : The trifecta at most racetracks consists of selecting the? first-, second-, and? third-place finishers in a particular race in their proper order.

Reviews

Write a Review

Project Management Questions & Answers

  Create a project schedule and align resources

Create a project schedule and align resources, Analyze project schedule and resource allocation

  Managerial roles and gap analysis

Write a report on Managerial Roles and Gap Analysis

  Questionaire on project management

Questionaire on Project Management

  Describe the market growth rate for product

Describe the market growth rate for product and service.

  Prepare a work plan and project schedule - gantt chart

Design an online system for the human resources department to manage available job positions.

  Project risk management approach

How does a project risk management approach pro-vide an early warning signal for impending problems or issues

  Black-scholes options pricing model

Calculate the payoff and the profits for investments

  Describe the features or characteristics of product

Describe the features or characteristics of your product or service.

  Write paper on inventory management system

Write paper on Inventory Management System.

  Analysis of the overall project risk

Analysis of the overall project risk

  Investment and performance analysis

Evaluate the usefulness of ROCE

  Distribution strategy and project management

Distribution strategy and project management

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd