Provide details on plans to monitor and control project

Assignment Help Other Engineering
Reference no: EM132309916

Engineering Management Assignment Project - Group Report & Presentation

Group Report - Altona Sports Pavilion Development

Project Briefing - General Manager at the Council is considering awarding your team to a new project in Altona North. The General Manager has invited you to submit a report describing some key items relating to how you would manage the construction activities. Your report needs to include at least the requirements below.

Part (1) Report -

(A) Project Monitoring and Control

Please provide details on your plans to monitor and control the project. Provide examples of reports you plan to use ie. Weekly Reports.

(B) Project Quality

Provide an example Quality Control Checklist on one of the key elements that your company will use to control quality.

(C) Project Safety

Provide examples from your Project File on each of the items below:

  • Co-ordination Plan
  • Site Induction
  • Example of a SWMS
  • Incident Report Template

(D) Project Schedule

This schedule needs to incorporate all stages of the project including preliminaries and site setup. Schedule needs to identify:

  • Critical Path
  • Allocate Equipment/Plant
  • Allocation of Staff. Including, Site labour, Sub-Contractors, Site foreman, Site Supervisor, Project Manager
  • Allocation of Materials, Sundries
  • Cost estimates on each task

PART (2) Report Presentation -

Presentation Requirements: As the proposed Project Manager for the Construction of the development, the Council has now requested a presentation by the Project Team highlighting your Project Schedule.

Note: Reports are required to be submitted directly before Presentation. Presenters are reminded that this is required to be a professionally conducted Presentation. Presenters simply reading content will not be seen favourably. Time constraints will be enforced.

Verified Expert

Civil engineering management is the core theme of discussion in the current project. Diverse aspects of the engineering management task viz.,monitoring, control, safety, quality, etc are designed. There is extensive discussion on the CPM. SWMS, Quality checks, etc. A report and ppt are presented for the current Altona sports pavillion project.

Reference no: EM132309916

Questions Cloud

How can you convey positive messages about yourself : How can you convey positive messages about yourself both in your professional communication and your e-Portfolio?
Identify funding sources for the program : This assignment is the initial draft of a work plan designed to increase use of best practices in a public health organization. Creating a well-designed.
Developed capacity to be a life long student of leadership : Demonstrate research skills - Manage own time and processes effectively by prioritising competing demands to achieve personal goals (Manage self)
How do employers and employer associations : How do Employers and Employer Associations exert control over pay and reward in Australia in 2019?
Provide details on plans to monitor and control project : BET207 Engineering Management Assignment Project - Group Report & Presentation, Melbourne Polytechnic, Australia. Provide details on plans to monitor project
What is the ramification or concept of culture : What is the ramification or concept of culture and its influence on humanity? Also, need examples.
Explain how the early theories were developed : Explain how these early theories were developed, and why there is concern related to race, gender, socioeconomic status, and other areas of diversity.
Research an approved disease of respiratory cardiovascular : Bio205Microbiology Yavapai College USA Research an approved disease of respiratory cardiovascular. Identify the structures that the disease effects.
Give 10 examples of the subgenres of science fiction : Give 10 Examples of the subgenres of Science Fiction and identify stories and authors that represent the 10 genres.

Reviews

len2309916

5/22/2019 1:49:16 AM

Assessment Weight - 30% of total mark. Instructions: Please carefully read all documents. Any queries should be raised with the Teacher during class time. All submissions are required to follow the procedures & polices set out for MP Higher Education Students. The Project will be Assessed in 2 equal Parts: Note: Research will be required to complete this project. Please ensure to reference the relevant source.

len2309916

5/22/2019 1:49:10 AM

Assessment items submitted after the due date without an approved extension and / or special consideration will be penalised 5% per day off the mark awarded for a total of ten (10) working days. If the item is submitted after this time or not submitted, the item will not be marked and a fail grade awarded. Higher Education Assessment Policy P/HE/D/3/040 Section 9. Submission of Assessment. If there is any doubt as to the authenticity of any piece of my assessment then I can be orally examined. Assignments without cover sheets will not be marked. Penalties apply for late submission of assessment and that this could result in a fail grade being awarded.

Write a Review

Other Engineering Questions & Answers

  Determine a maximum safe speed

Determine a maximum safe speed (assuming current design standards) to the nearest 5 mi/h.

  Solve a spreadsheet model for the problem

Mathematically formulate a linear programming model for the problem and formulate and solve a spreadsheet model for the problem.

  What is the power being dissipated in the device

A power transistor is specified to have a maximum junction temperature of 150C. When the device is operated at this junction temperature with a heat sink, the case temperature is found to be 97°C. The case is attached to the heat sink with a bond ..

  Show that zero-point energy of a simple harmonic oscillator

Show that the zero-point energy of a simple harmonic oscillator does not contribute to its entropy or heat capacity, but does contribute to its energy

  Adopt a condensing power plant

Adopt a condensing power plant with a feedwater tank (MV) with the wiring diagram and information - High-pressure turbines are isentropic efficiency of 0.88.

  The text op amps for everyone fourth edition

Read Chapters 1-2 in the text Op Amps for Everyone Fourth Edition For the configuration below:

  Draw a gate diagram for the circuit implementing

Simplify the product of sums to give the expression with the fewest literals. Show your work. Draw a gate diagram for the circuit implementing F, based on your simplified expression

  With space between each two numbers into the terminal

Write a program to search the elements of an array ‘dist' to pick all the elements that are divisible by 5. Print out those elements 5 per line with space between each two numbers into the terminal. The elements of the array are 2-byte long.

  What is the design speed of the curve

If the high point is at station 110 + 75.5, what is the design speed of the curve?

  Gis study for a place called brookley field

GIS study for a place called Brookley Field, Mobile, Alabama ( Go Google maps).

  Compute the bias current of each transistor

Compute the bias current of each transistor (M1-14) and the bias voltage of each node (V1-V10). Your answers should be in terms of M and N, Assume Vin+ = Vin = Vincm

  Find the shapes of input and output voltage in circuit

Find the shapes of input and output voltage in circuit - determine the length 1 and length 2 of transmission lines T1 and T2 to make the Input impedance (INPUT) equal to 50 ohms

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd