Engineers are often tasked with determining the cost of manufacturing a product. Such cost modeling can be extremely detailed and extensive. You will perform a cost model analysis using an Excel Spreadsheet provided to you on BlackBoard. The spreadsheet contains all of the key costs for equipment, materials, labor, and facilities. There are 3 major process steps, and there are 3 different pieces of equipment (different vendors) available for you to use at each step. Each piece of equipment has a different cost, throughput, yield, support requirement, and space requirement. You will determine the set of equipment and the number of equipment sets to use for manufacturing. You must determine within reason the number of sets to use. For example, you might have 3 pieces of one type of equipment but not hundreds. Do not mix equipment from different vendors for the same process step, but you can certainly mix vendors for the different steps. The important factor is cost.

(1) Build your cost model but calculate labor, equipment depreciation, material, and facility costs separately. Then provide a total cost summary. You must choose the number of parts to fabricate (per year or per week). More parts results in lower depreciation costs for the facility but also requires more equipment.

(2) Use a 5 year depreciation for the equipment and 40 year for the facility

(3) Model the factory for Four shifts of 12 hrs/day and 7 days per week. Assume ONLY 20 hrs/day of actual operation for production but include labor costs for 24 hrs/day. The other 4 hrs is set aside for maintenance and down time.

(4) After creating your model to calculate the total cost, including yield, model the case by choosing the appropriate equipment sets for your factory. This process will be iterative. Find the lowest cost for each case.

(5) Note that if equipment requires 0.5 operators and if you only have one piece of equipment, you must round up to a full person.

(6) Include fringe costs for labor as given at 30%. Include "Other Factory" labor costs as provided. These costs represent administrative, accounting, management, safety, shipping, and janitorial services.

(7) Now create a summary of costs in your spreadsheet showing total labor, equipment, facility, material, and overhead costs. Use a Pie chart to show breakdown of costs by area: labor, equipment depreciation, materials, etc. Include net yield calculations.

(8) Write a short, professional quality, 5-6 page report summarizing your factory operation. The report MUST include an Executive Summary and an Introduction. Provide a summary table of equipment sets and tool costs along with labor requirements (# of people per area). Pie chart of the cost breakdown is required. Provide the final cost (table form) of the model. Provide a brief analysis of the approach that you took to minimize costs and analyze your results. What were the biggest cost factors and why?

 

Reference no: EM13737309

Questions Cloud

What ethical issues involved in marketing to children : What are the ethical issues involved in marketing to children in this manner
What precisely did the civil right movement gain : What precisely did the Civil Right Movement gain? What objectives did it fail to achieve? How were the approaches of Martin Luther King Jr, and Malcom X to Civil Rights different? How were they the same?
What is the highest expense for business materials : What is the highest expense for business materials? How can managers monitor and keep this cost as low as possible? Explain.
Fdi flows will be on national and regional economies : Step back from all this and tell me what you think the long-term consequences of the incoming and outgoing FDI flows will be on national and regional economies, and also on the political construct of many of the nations we trade with. For example,..
Provide a total cost summary : Build your cost model but calculate labor, equipment depreciation, material, and facility costs separately. Then provide a total cost summary.
Defining the project scope : Review the project case. Determine the scope of the District 4 Production Warehouse Move project from the information provided in the case. Using the Project Scope Checklist, prepare a scope document for review and approval by the project sponsor ..
Write an essay on statue of an offering bearer : The analysis of Statue of an Offering Bearer should begin with an introduction of the artwork that includes the title, date, medium (material from which it is made), and the museum in which it is located.
Project team and stakeholder management : As the project manager for the District 4 Warehouse Move project, you will need to determine who your stakeholders and project team members are for this project.
What is the highest expense for business operations : What is the highest expense for business operations? How can managers monitor and keep this cost as low as possible? Explain.

Reviews

Write a Review

Microeconomics Questions & Answers

  The free rider problem

Question: Explain why the free rider problem makes it difficult for perfectly competitive markets to provide the Pareto efficient level of a public good.

  Failure of the super committee is good thing for economy

Some commentators have argued that the failure of the “Super committee” is good thing for the economy?  Do you agree?

  Case study analysis about optimum resource allocation

Case study analysis about optimum resource allocation: -  Why might you suspect (even without evidence) that the economy might not be able to produce all the schools and clinics the Ministers want? What constraints are there on an economy's productio..

  Fixed cost and vairiable cost

Questions:  :   Which of the following are likely to be fixed costs and which variable costs for a chocolate factory over the course of a month?  Explain your choice.

  Problem - total cost, average cost, marginal cost

Problem - Total Cost, Average Cost, Marginal Cost: -  Complete the following table of costs for a firm.  (Note: enter the figures in the  MC   column  between  outputs of  0 and 1, 1 and 2, 2 and 3, etc.)

  Oligopoly and demand curve problem

Problem based on Oligopoly and demand curve,  Draw and explain the demand curve facing each firm, and given this demand curve, does this mean that firms in the jeans industry do or do not compete against one another?

  Impact of external costs on resource allocation

Explain the impact of external costs and external benefits on resource allocation;  Why are public goods not produced in sufficient quantities by private markets?  Which of the following are examples of public goods (or services)? Delete the incorrec..

  Shifts in demand and movements along the demand curve

Describe the differences between shifts in demand and movements along the demand curve. What are the main factors which can shift the demand curve? Explain why they cause the demand curve to shift. Use examples and draw graphs to support your discuss..

  Article review question

Article Review Question: Read the following excerpts from the article "Fruit, veg costs surge' by Todd, Dagwell, published in the Herald on January 25th 2011 and answer questions below:

  Long-term growth, international trade & globalization

Long-term Growth, International Trade & Globalization:- This question deals with concepts such as long-term growth, international trade and globalization. Questions related to trade deficit, trade surplus, gains from trade, an international trade sce..

  European monetary union (emu) in crisis

"Does the economic bailout of Spain and Greece spell the beginning of the end for the European Monetary Union (EMU)?"

  Development game “settlers of catan”

Read the rules of the game, the overview and the almanac for the Development Game "Settlers of Catan"

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd