Provide a pavement design solution

Assignment Help Civil Engineering
Reference no: EM131394910

Drainage Design

Assignment

The main access to a large rural farming community in a developing country is provided by an engineered earth road. However this is often subjected to flooding and impassability which prevents access during several months of the year, making the community vulnerable and isolated. Costs of significant agricultural production in the area are also correspondingly affected. As a result the government is set to upgrade the road to an all season road.

Your organisation has been invited to undertake studies to determine a suitable drainage scheme for the new road.

Available Data

The information provided to you is of low quality, and so will need to state clearly any assumptions you make.

1. The existing road is an engineered earth road

2. The new all season road is expected to carry 1.5 million standard axles over its design life (10 years).

3. Possible horizontal alignments are shown on logographical maps (Figure 1 and Figure 2). Select one of these or provide justification for an alternative.

4. The horizontal curve is 1500 metres in radius with a 3% crossfall

5. Topographic maps (of low quality) shown in Figure 1 and Figure 2

6. The nature of the surface soils is silty clay with light natural vegetation covering. Any imported material will be sandy clay. Subgrade CBR's are 12% and 18% respectively un-soaked and 4% and 8% soaked.

7. The road surface is to receive a thin bituminous surface overlying a base and sub-base, characteristics of which are to be recommended by this study.

8. The sealed pavement width is 7.4 metres plus two 1.8 metre unsealed shoulders which comprise of crushed stone.

9. Run off and stream flow is as follows:

- Run off from the verge - calculate using the shown catchment areas
- Run off from the road - calculate using 'i' of 75 mm/hr for 1 in 5 year and 95 mm/hr for 1 in 10.
- Stream flow at chainage 240 metres - 8 m3/sec (1 in 10 yr flow)

- Stream flow at chainage 390 metres - 23 m3/sec (1 in 10 yr flow)
- 5 m3/sec dry season flow.

10. When determining the coefficients of run off for the various surfaces you need to bear in mind that although future land use for the catchment area are undecided, housing development in the vicinity of the new alignment should be considered.

2388_Figure2.jpg

Figure 1: Proposed Alignment

 

878_Figure1.jpg

Design Steps

Design Steps

i) Choose a vertical alignment for your horizontal alignment so that it contains some cutting and some fill sections tying into the existing grades at the ends of the project (given in some cases). A flood crossing is to be considered for the crossing at 390 metres.

ii) Provide a pavement design solution. You may use an analytical design approach or utilize (with appropriate justification) existing empirically founded catalogue methods.

iii) Establish typical cross sections of the road for cuts, fills and culvert/flood crossings. Indicate cross falls, side slopes, back slopes and any necessary drain facilities. The position and direction of the longitudinal drainage can be shown schematically on a plan for run off determination. Off road catchments for local drainage are to be calculated. The initial designs can be changed or modified later after more detailed design. Assume that the slopes will be resistant to slip but not necessarily surface erosion.

iv) Design hydraulic drainage treatments which have the capacity to cater for each of these discharges. Apart from a piped system for the village and the culvert or flood crossing, you have options in the type of drainage facility that can be provided, e.g. open or closed side drains, kerbed or un-kerbed paved carriageway.

v) Velocity of flow and rainfall impact may also be an important design parameter. Make appropriate checks. Protection works may be needed, e.g. at the outlet to the culvert.

Reference no: EM131394910

Questions Cloud

How should jessica prepare for the trial : What is metadata? What type of information might the plaintiff's attorney be looking for by seeking metadata associated with the electronic portions of the health records? How should Jessica prepare for the trial
Discuss three software applications that you have utilized : Discuss three software applications that you have utilized in a K-12, higher education or business setting. Determine the purpose for the software being used for this setting.
Identify and define the law in regards to discrimination : Identify and define the law in regards to discrimination and protections under Title VII of the Civil Rights Act of 1964. Determine which identified class, protected by Title VII
Employment law - discipline waitresses for body issues : Lou, the owner of a nightclub, wants to discipline two of his waitresses for gaining weight and therefore no longer fitting the mold of the other "svelte and statuesque" runway models who work there
Provide a pavement design solution : Provide a pavement design solution. You may use an analytical design approach or utilize (with appropriate justification) existing empirically founded catalogue methods.
What about their target consumers and customers : Do you like their service design? Why or why not? What about their target consumers and customers? Please listen to this podcast then think about business model from product/service design and supply chain perspective.
Sketch the 1-ft contour lines on an appropriate grid : The data given in Figure 9-36 were taken in the order shown in parentheses during a grid-method leveling survey. The numbers along the lines of sight, next to the parentheses, are the rod readings. Place the data in standard field book form. Sketc..
Define the term expository passage and illustration : Define the following terms:- expository passage - illustration- argument from example- explanation- explanandum- explanans- conditional statement- antecedent- consequent.
Research on the national health information infrastructure : Perform research on the National Health Information Infrastructure (NHII), Joint Commission, ARRA, and your state's QIO (Quality Integrity Organization). Find information in relation to interoperability, meaningful use and the HITECH Act

Reviews

len1394910

2/15/2017 7:16:34 AM

This is my assignment in civil engineering (drainage assignment ) and I am providing you with lecture notes, I can provide you with these lecture notes that will help you to solve my assignment.

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd