Frito-Lay, the multi-billion-dollar subsidiary of food and beverage giant PepsiCo, maintains 36 plants in the U.S. and Canada. These facilities produce dozen of snacks, including the wellknown Lay's, Fritos, Cheetos, Doritos, Ruffles, and Tostitos brands, each of which sells over $1 billion per year. Frito-Lay plants produce in the high-volume, low-variety process model common to commercial baked goods, steel, glass, and beer industries.
In this environment, preventive maintenance of equipment takes a major role by avoiding costly downtime. Tom Rao, vice president for Florida operations, estimates that each 1% of downtime has a negative annual profit impact of $200,000. He is proud of the 11 2, unscheduled downtime his plant is able to reach-well below the 2% that is considered the "world-class" benchmark. This excellent performance is possible because the maintenance department takes an active role in setting the parameters for preventive maintenance. This is done with weekly input to the production schedule. Maintenance policy impacts energy use as well. The Florida plant's technical manager, Jim Wentzel, states, "By reducing production interruptions, we create an opportunity to bring energy and utility use under control. Equipment maintenance and a solid production schedule are keys to utility efficiency. With every production interruption, there is substantial waste."
As a part of its total productive maintenance (TPM) program, * Frito-Lay empowers employees with what it calls the "Run Right" system. Run Right teaches employees to "identify and do." This means each shift is responsible for identifying problems and making the necessary corrections, when possible.
This is accomplished through (1) a "power walk" at the beginning of the shift to ensure that equipment and process settings are performing to standard, (2) mid-shift and post-shift reviews of standards and performance, and (3) posting of any issues on a large whiteboard in the shift office.
Items remain on the whiteboard until corrected, which is seldom more than a shift or two. With good manpower scheduling and tight labor control to hold down variable costs, making time for training is challenging. But supervisors, including the plant manager, are available to fill in on the production line when that is necessary to free an employee for training. The 30 maintenance personnel hired to cover 24>7 operations at the Florida plant all come with multi-craft skills (e.g., welding, electrical, plumbing). "Multi-craft maintenance personnel are harder to find and cost more," says Wentzel, "but they more than pay for themselves."
Discussion Questions **
1. What might be done to help take Frito-Lay to the next level of outstanding maintenance? Consider factors such as sophisticated software.
2. What are the advantages and disadvantages of giving more responsibility for machine maintenance to the operator?
3. Discuss the pros and cons of hiring multi-craft maintenance personnel.
Modify the social networking features
: Based on what you learned in this chapter, write about 200 words in which you describe current developments in social networking that Lego will need to understand as it decides whether to continue, remove, or modify the social networking features ..
|
Poweruser role versus a user assigned specific roles
: Think about system access differences that you would expect between a user assigned a POWERUSER role versus a user assigned a specific roles such as an AP CLERK. Which one would only have access to certain functions in Purchasing (entering P.O.)?
|
What are the consequences of the strongest idea
: How do the ideas in your report connect to what we have discussed in classes, or to what scholars have written in their treatment of your topic and what new ideas have you added to the conversation? What ideas do you critique?
|
Subnet address of host
: A host on the network has an IPv4 address of 172.26.84.236 with a subnet mask of 255.255.255.240. What is the subnet address of this host and how many hosts could this network have?
|
Pros and cons of hiring multi craft maintenance personnel
: What might be done to help take Frito-Lay to the next level of outstanding maintenance? Consider factors such as sophisticated software.
|
Determine the magnitude of the force p
: A 4-mm-diameter steel wire, 3.2 m long, carries an axial tensile load P. Find the maximum safe value of P if the allowable normal stress is 280 MPa and the elongation of the wire is limited to 4 mm. Use E = 200 GPa.
|
Identify and discuss 2 treatment modalities for mr. potts
: Identify and discuss 2 treatment modalities for Mr. Potts that you believe would be appropriate and useful for his recovery. State why you believe the 2 treatment modalities that you have chosen would be effective for Mr. Potts.
|
Separate the input function from the math function
: First, separate the input function from the math function, placing the input function into a class with a main method, and the math function into a the class MyMath.
|
Prepare statement of revenues and expenditures
: Capital Projects Transactions. In 2017, Riverside began work on an outdoor amphitheater and concession stand at the city's park. It is to be financed by a $3,500,000 bond issue and supplemented by a $500,000 General Fund transfer. Prepare a balance s..
|