PURPOSE OF ASSIGNMENT

The purpose of this assignment is to:

- Demonstrate your ability to critically examine impacts of project management (P M gt ) practice/methodologies and techniques on modern, complex projects in the Architecture, Engineering and Construction (AEC) industry

- Evaluate PMgt practice/methodologies and various PMgt techniques, and recommend feasible techniques applicable to complex construction projects

ASSUMPTION:

The following assumption applies to this assignment; 1

You are required to assume that you have been appointed the Project Manager [PMgr] in charge of a project team working on construction of a shed at 94 Western Beach Road in Geelong, Victoria 3220, [94WBR-shed project]. The scope of this project includes some minor demolition works in the backyard and construction of a large shed on the property. Design documentation (standard 2D and the BIM model) and basic project information are provided in the unit's CloudDeakin site [94WBR-shed project folder].

The unit academic team (your client) assumes that in your professional career, you have been involved in numerous projects, and the projects were successfully delivered; ei., to expectations of all stakeholders, to client's specified quality, within specified environmental constraints of the project including meeting safety standards and efficient use of resources, etc. The unit academic team (your client) also assumes that you are continuously reflecting on your professional career and document lessons learnt from your past projects and as such apply them together with your relevant expertise/attributes in planning of the 94WBR-shed project.

ASSIGNMENT TASK

Based on the above assumptions your task is to develop a project management PLAN for the 94WBR-shed project in Geelong, which must:

1. Provide very brief definition of the 94WBR-shed project

2. Provide detailed scope/deliverables of 94WBR-shed project

3. Propose project management practice/methodology for effective management of the 94WBR-shed project in Geelong (what style of management/ what project manager are you going to be on this particular project)

4. Propose appropriate project management techniques/tools that you want your team to use on this project. The tools need to address all ten (10) core PMBOK areas and be justified.

5. Show briefly how scope, risk, communication and procurement will be managed

6. Show in details management of integration, stakeholders, HR, safety, quality, time and cost of the 94WBR-shed project in Geelong

FORMAT OF ASSIGNMENT

- Format of the submission is professional project management PLAN. The plan is to be submitted as a single Microsoft Project 2016 .mpp file with notes only.

- Suggested word count of the plan including notes is 2,500 words.

Verified Expert

This is a project management plan paper and is focused on examining the impacts of management (PMgt) practice/methodology as well as the techniques on modern complex projects in the Architecture, engineering and the construction industry. This paper presents an evaluation of project management practice as well as the various techniques of project management. It also recommends feasible techniques that are applicable to complex construction projects. This paper defines and presents a detailed scope of 94WBR-Shed project and also makes a proposal regarding project management methodologies for effective management of 94WBR-Shed project. This paper also presents details of management integration, HR, stakeholders, quality, time as well as cost of the 94WBR-Shed project in Geelong.

Reference no: EM131997462

Questions Cloud

What is the expected dollar profit for a writer of a naked : A stock is trading at $54. You believe there is a 50% chance the price of the stock will increase by 15% over the next 3 months.
Calculate the balance in retained earnings : Stockholders' Equity section of a balance sheet - Calculate the balance in Retained earnings at June 30, 2010. Use a T-account to show your calculations
Providing the means to enact such a goal : How does the federal government force the states to enact national policy goals without providing the means to enact such a goal?
What should the price of the stock be in one years time : Using the information from question 1, what should the price of the stock be in one year's time ?
Propose project management practice : SRM752 Advanced Project Management - Deakin University - Project management PLAN - Show briefly how scope, risk, communication and procurement will be managed
How do these concurrent powers affect citizens : Is it redundant for states to have some of the same powers as the federal government, or does the American public benefit?
What is socialization : Public Opinion How is it formed? What is socialization? What are the major groups that form our opinions? Where do we get our opinions?
What are thoughts on voter turnout : Does a single vote matter? Why bother voting? Is there anything to be done to increase voter turnout? Should we work to increase voter turnout?
What is the impact of her capital gains and losses : If Serenity is single and has taxable income from other sources of $75,000, what is the impact of her capital gains and losses on her income tax liability

Reviews

len1997462

5/26/2018 7:08:57 AM

Quite detailed description of how stakeholders, HR, quality, time, cost, safety and integration on 94WBR-shed project in Geelong during its construction phase are to be managed is very well explained in the plan and linked with basic project parameters Quite detailed description of how stakeholders, HR, quality, time, cost, safety and integration on 94WBR-shed project in Geelong during its construction phase are to be managed is quite well explained in the plan and linked with basic project parameters (17.5 - 19.99 points) (15 - 17.49 points) Quite detailed description of how stakeholders, HR, quality, time, cost, safety and integration on 94WBR-shed project in Geelong during its construction phase are to be managed is just explained in the plan and linked with basic project parameters Quite detailed description of how stakeholders, HR, quality, time, cost, safety and integration on 94WBR-shed project in Geelong during its construction phase are to be managed is NOT explained in the plan neither linked with basic project parameters (12.5 - 14.99 points) (0 12.49 points)

len1997462

5/26/2018 7:08:49 AM

Practical management; 'detailed' description of how integration + stakeholders + HR + safety + quality + time + cost are to be managed Quite detailed description of how stakeholders, HR, quality, time, cost, safety and integration on 94WBR-shed project in Geelong during its construction phase are to be managed is perfectly explained in the plan and linked with basic project parameters (20 - 25) points

len1997462

5/26/2018 7:08:44 AM

Brief description of how scope, risk, communication and procurement of the 94WBR-shed project in Geelong during its construction phase are to be managed is just explained in the plan and linked with basic project parameters Brief description of how scope, risk, communication and procurement of the 94WBR-shed project in Geelong during its construction phase are to be managed is NOT explained in the plan neither linked with basic project parameters (7.5-8.99 points) (0-7.499 points)

len1997462

5/26/2018 7:08:39 AM

Brief description of how scope, risk, communication and procurement of the 94WBR-shed project in Geelong during its construction phase are to be managed is very well explained in the plan and linked with basic project parameters Brief description of how scope, risk, communication and procurement of the 94WBR-shed project in Geelong during its construction phase are to be managed is quite well explained in the plan and linked with basic project parameters (10.5-11.99 points) (9-10.499 points)

len1997462

5/26/2018 7:08:33 AM

Practical management; 'brief' description of how scope + risk + communicatio n + procurement are to be managed Brief description of how scope, risk, communication and procurement of the 94WBR-shed project in Geelong during its construction phase are to be managed is perfectly explained in the plan and linked with basic project parameters (12-15 points)

len1997462

5/26/2018 7:08:27 AM

Proposed project management techniques/tools for each PMBOK area (up to 10 tools) that could be used by your PMgt Team in managing demolition and construction phases of the 94WBR-shed project in Geelong communicated in the plan pose some doubts regarding meaningful reflection of the basic project parameters, resources and adopted PMgt practice. Some other techniques might not be more effective in satisfactory management of project resources. The document does NOT proposed project management techniques/tools for each PMBOK area (up to 10 tools) that could be used by your PMgt Team in managing construction phases of the 39AA project in Geelong. Or, the proposed techniques do NOT reflect basic parameters of the project, its resources and adopted PMgt practice. The techniques would NOT allow satisfactory management of project resources. (20-23.99 points) (0-19.99 points)

len1997462

5/26/2018 7:08:18 AM

Proposed project management techniques/tools for each PMBOK area (up to 10 tools)that could be used by your PMgt Team in managing construction phases of the 94WBR-shed project in Geelong are very well communicated in the plan. The techniques are almost perfect reflection of the basic project parameters, resources and adopted PMgt practice. The techniques would allow successful managem ent of project resources. (28-31.99 points) Proposed project management techniques/tools for each PMBOK area (up to 10 tools) that could be used by your PMgt Team in managing construction phases of the 94WBR-shed project in Geelong are quite well communicated in the plan. The techniques are a meaningful reflection of the basic project parameters, resources and adopted PMgt practice. The techniques would allow successful managemen t of project resources. (24-27.99 points)

len1997462

5/26/2018 7:08:12 AM

PMgt techniques/too ls Proposed project management techniques/tools for each PMBOK area (up to 10 tools) that could be used by your PMgt Team in managing construction phases of the 94WBR- shed project in Geelong are perfectly communicated in the plan. The techniques are the perfect reflection of the basic project parameters, resources and adopted PMgt practice. The techniques would allow successful managem ent of project resources. (32-40 points)

len1997462

5/26/2018 7:08:06 AM

Project management practice/methodology for effective management of the 94WBR-shed project in Geelong is NOT evidenced in the plan, neither meaningfully connects project's (1) scope/deliverable with (2) available resources and (3) proposed PMgt techniques/tools. Video recording of introduction to the plan and project management practice statement by the student (hypothetical Project Manager) is NOT submitted via the DROPBOX video functionality. NO statement of practice is provided in the PMP. (0-4.99 points)

len1997462

5/26/2018 7:07:59 AM

Project management practice/methodology for effective management of the 94WBR-shed project in Geelong is quite well demonstrated in the plan. However, the proposed practice evidences some limitations in relation to necessary connection between project's (1) scope/deliverable with (2) available resources and (3) proposed PMgt techniques/tools. Video recording of introduction to the plan and project management practice statement by the student (hypothetical Project Manager) is be submitted via the DROPBOX video functionality. Project management practice/methodology for effective management of the 94WBR-shed project in Geelong communicated in the plan does NOT fully reflect necessary connection between project's (1) scope/deliverable with (2) available resources and (3) proposed PMgt techniques/tools. Video recording of introduction to the plan and project management practice statement by the student (hypothetical Project Manager) is be submitted via the DROPBOX video functionality. (6-6.99 points) (5-5.99 points)

len1997462

5/26/2018 7:07:47 AM

PMgt practice Project management practice/methodology for effective management of the 94WBR-shed project in Geelong is perfectly demonstrated in the plan. The proposed practice connects perfectly project's (1) scope/deliverable with (2) available resources and (3) proposed PMgt techniques/tools. Video recording of introduction to the plan and project management practice statement by the student (hypothetical Project Manager) is be submitted via the DROPBOX video functionality. (8-10 points) Project management practice/methodology for effective management of the 94WBR-shed project in Geelong is very well demonstrated in the plan. The proposed practice connects very well project's (1) scope/deliverable with (2) available resources and (3) proposed PMgt techniques/tools. Video recording of introduction to the plan and project management practice statement by the student (hypothetical Project Manager) is be submitted via the DROPBOX video functionality. (7-7.99 points)

len1997462

5/26/2018 7:07:40 AM

Brief description of the 94WBR-shed project and its scope/deliverab les for the construction phase, which are communicated is the plan reflect only basic project parameters. These elements of the plan will NOT fully support decision making regarding appropriate PMgt practice and techniques for the 94WBR-shed project in Geelong Brief description of the 94WBR-shed project and its scope/deliverab les for the construction phase, which are communicated is the plan do NOT reflect basic parameters of the 94WBR-shed project. These content of the plan will NOT enable decision making regarding appropriate PMgt practice and techniques for the 94WBR-shed project in Geelong (5-5.99 points) (0-4.99 points)

len1997462

5/26/2018 7:07:35 AM

Project definition and scope Brief description of the 94WBR- shed project and its scope/deliverables for the construction phases are perfectly demonstrated in the plan, which in turn enables decision making regarding appropriate PMgt practice and techniques for the 94WBR-shed project in Geelong (8-10 points) Brief description of the 94WBR-shed project and its scope/deliverables for the construction phase, which are communicated is the plan reflect very well basic project parameters. These elements of the plan will enable decision making regarding appropriate PMgt practice and techniques for the 94WBR-shed project in Geelong (7-7.99 points) Brief description of the 94WBR-shed project and its scope/deliverab les for the construction phase, which are communicated is the plan reflect quite well basic project parameters. These elements of the plan will enable decision making regarding appropriate PMgt practice and techniques for the 94WBR-shed project in Geelong (6-6.99 points)

Write a Review

Project Management Questions & Answers

  What traits do you think leaders need to possess

In other words, what traits do you think leaders need to possess during these unstable times compared to leaders in a very stable environment?

  Develop an estimated duration for each activity

Develop an estimated duration for each activity - Determine the critical path and identify the activities that make up the critical path.

  Evaluate technical performanceconsider a situation in which

evaluate technical performanceconsider a situation in which the project manager a generalist is asked to provide an

  Estimates critical to effective project management

Why are accurate estimates critical to effective project management? How does the culture of an organization influence the quality of estimates?

  Briefly describe the dilemma

Briefly describe the dilemma.

  Find the power spectral density of x

Find the power spectral density of X(t) in terms of the probability density function of the frequency F.- What happens to this power spectral density when the randomized frequency F assumes a constant value?

  Who will prevail in given situation and why

Perfection counterclaimed against Hodges for his failure to deliver the additional two hundred tons. Who will prevail? Why?

  Examine the development of the four-phase model

Examine the development of the team in terms of the four-phase model. Does this model describe how the team evolved

  What cost contingency reserves might be needed

As a result, you are quantifying the project's risk exposure and determining what cost and schedule contingency reserves might be needed. You performed a schedule risk analysis using Monte Carlo analysis.

  How many units of petroleum will be produced

If the company uses 1,250 units of labor and 1,700 units of capital, how many units of petroleum will be produced?

  Explain the pros and cons of this marketing idea

Explain the pros and cons of this marketing idea proposed by the company from the both a financial and nonfinancial perspective.

  Explain bundle of sticks idea as it relates to real property

Explain the bundle-of-sticks idea as it relates to real property.- Explain the five possessory interests in land.- Explain the bundle-of-sticks idea as it relates to intellectual property.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd