PURPOSE OF ASSIGNMENT

The purpose of this assignment is to:

- Demonstrate your ability to critically examine impacts of project management (P M gt ) practice/methodologies and techniques on modern, complex projects in the Architecture, Engineering and Construction (AEC) industry

- Evaluate PMgt practice/methodologies and various PMgt techniques, and recommend feasible techniques applicable to complex construction projects

ASSUMPTION:

The following assumption applies to this assignment; 1

You are required to assume that you have been appointed the Project Manager [PMgr] in charge of a project team working on construction of a shed at 94 Western Beach Road in Geelong, Victoria 3220, [94WBR-shed project]. The scope of this project includes some minor demolition works in the backyard and construction of a large shed on the property. Design documentation (standard 2D and the BIM model) and basic project information are provided in the unit's CloudDeakin site [94WBR-shed project folder].

The unit academic team (your client) assumes that in your professional career, you have been involved in numerous projects, and the projects were successfully delivered; ei., to expectations of all stakeholders, to client's specified quality, within specified environmental constraints of the project including meeting safety standards and efficient use of resources, etc. The unit academic team (your client) also assumes that you are continuously reflecting on your professional career and document lessons learnt from your past projects and as such apply them together with your relevant expertise/attributes in planning of the 94WBR-shed project.

ASSIGNMENT TASK

Based on the above assumptions your task is to develop a project management PLAN for the 94WBR-shed project in Geelong, which must:

1. Provide very brief definition of the 94WBR-shed project

2. Provide detailed scope/deliverables of 94WBR-shed project

3. Propose project management practice/methodology for effective management of the 94WBR-shed project in Geelong (what style of management/ what project manager are you going to be on this particular project)

4. Propose appropriate project management techniques/tools that you want your team to use on this project. The tools need to address all ten (10) core PMBOK areas and be justified.

5. Show briefly how scope, risk, communication and procurement will be managed

6. Show in details management of integration, stakeholders, HR, safety, quality, time and cost of the 94WBR-shed project in Geelong

FORMAT OF ASSIGNMENT

- Format of the submission is professional project management PLAN. The plan is to be submitted as a single Microsoft Project 2016 .mpp file with notes only.

- Suggested word count of the plan including notes is 2,500 words.

Project definition and scope

Brief description of the 94WBR-

shed project and its scope/deliverables for the construction phases are perfectly demonstrated in the plan, which in turn enables decision making regarding appropriate PMgt practice and techniques for the 94WBR-shed project in Geelong.

Project management practice

Project management practice/methodology for effective management of the 94WBR-shed project in Geelong is perfectly demonstrated in the plan. The proposed practice connects perfectly project's (1) scope/deliverable with (2) available resources and (3) proposed PMgt techniques/tools.

Video recording of introduction to the plan and project management practice statement by the student (hypothetical Project Manager) is be submitted via the video functionality.

Project management techniques/tools

Proposed project management techniques/tools for each PMBOK area (up to 10 tools) that could be used by your PMgt Team in managing construction phases of the 94WBR- shed project in Geelong are perfectly communicated in the plan. The techniques are the perfect reflection of the basic project parameters, resources and adopted PMgt practice. The techniques would allow successful managem ent of project resources.

Practical management; 'brief' description of how scope + risk + communicatio n + procurement are to be managed Brief description of how scope, risk, communication and procurement of the 94WBR-shed project in Geelong during its construction phase are to be managed is perfectly explained in the plan and linked with basic project parameters Practical management; 'detailed' description of how integration + stakeholders + HR + safety + quality + time + cost are to be managed

Quite detailed description of how stakeholders, HR, quality, time, cost, safety and integration on 94WBR-shed project in Geelong during its construction phase are to be managed is perfectly explained in the plan and linked with basic project parameters.

Attachment:- template.rar

Reference no: EM131993638

Questions Cloud

What is the internal rate of return and net present value : what is the net present value of this investment, assuming 10% discount rate is appropriate? What is the internal rate of return of this $80 million investment
Coupon corporate bond that has fifteen year left to maturity : Assume that you are interested in a 4.50 percent coupon corporate bond that has fifteen years left to maturity.
Countries has not adopted the euro : Which of the following countries has not adopted the euro?
How much would be your total yield if the bond was sold : Bond with face value $1000, maturity 15 years coupon rate 5.5% per year payable semi-annually aand YTM 7% currently bond sells for $900.
Propose appropriate project management techniques : SRM752 - Deakin University - Project management PLAN - Propose appropriate project management techniques/tools that you want
What are expected profits based on expectations : Your business plan for your proposed start-up firm envisions first-year revenues of $90,000, fixed costs of $36,000, and variable costs equal to one-third
Discuss in what stages of the investor life cycle : Discuss in what stages of the Investor Life Cycle each of these stocks would be most appropriate and why.
Find a linear model for these data using age : (a) Find a linear model for these data using age (x) to predict systolic blood pressure (y)
What is the present value of the bond : 17-year U.S. Treasury bond with a face value of $1,000 pays a coupon of 6.00% (3.000% of face value every six months). The reported yield to maturity is 4.8%

Reviews

len1993638

5/23/2018 6:10:15 AM

Quite detailed description of how stakeholders, HR, quality, time, cost, safety and integration on 94WBR-shed project in Geelong during its construction phase are to be managed is quite well explained in the plan and linked with basic project parameters Quite detailed description of how stakeholders, HR, quality, time, cost, safety and integration on 94WBR-shed project in Geelong during its construction phase are to be managed is just explained in the plan and linked with basic project parameters Quite detailed description of how stakeholders, HR, quality, time, cost, safety and integration on 94WBR-shed project in Geelong during its construction phase are to be managed is NOT explained in the plan neither linked with basic project parameters (15 - 17.49 points) (12.5 - 14.99 points) (0 12.49 points)

len1993638

5/23/2018 6:10:09 AM

Practical management; 'detailed' description of how integration + stakeholders + HR + safety + quality + time + cost are to be managed Quite detailed description of how stakeholders, HR, quality, time, cost, safety and integration on 94WBR-shed project in Geelong during its construction phase are to be managed is perfectly explained in the plan and linked with basic project parameters (20 - 25) points Quite detailed description of how stakeholders, HR, quality, time, cost, safety and integration on 94WBR-shed project in Geelong during its construction phase are to be managed is very well explained in the plan and linked with basic project parameters (17.5 - 19.99 points)

len1993638

5/23/2018 6:10:03 AM

Brief description of how scope, risk, communication and procurement of the 94WBR-shed project in Geelong during its construction phase are to be managed is quite well explained in the plan and linked with basic project parameters Brief description of how scope, risk, communication and procurement of the 94WBR-shed project in Geelong during its construction phase are to be managed is just explained in the plan and linked with basic project parameters Brief description of how scope, risk, communication and procurement of the 94WBR-shed project in Geelong during its construction phase are to be managed is NOT explained in the plan neither linked with basic project parameters (9-10.499 points) (7.5-8.99 points) (0-7.499 points)

len1993638

5/23/2018 6:09:56 AM

Practical management; 'brief' description of how scope + risk + communicatio n + procurement are to be managed Brief description of how scope, risk, communication and procurement of the 94WBR-shed project in Geelong during its construction phase are to be managed is perfectly explained in the plan and linked with basic project parameters Brief description of how scope, risk, communication and procurement of the 94WBR-shed project in Geelong during its construction phase are to be managed is very well explained in the plan and linked with basic project parameters (12-15 points) (10.5-11.99 points)

len1993638

5/23/2018 6:09:50 AM

The document does NOT proposed project management techniques/tools for each PMBOK area (up to 10 tools) that could be used by your PMgt Team in managing construction phases of the 39AA project in Geelong. Or, the proposed techniques do NOT reflect basic parameters of the project, its resources and adopted PMgt practice. The techniques would NOT allow satisfactory management of project resources. (0-19.99 points)

len1993638

5/23/2018 6:09:42 AM

Proposed project management techniques/tools for each PMBOK area (up to 10 tools) that could be used by your PMgt Team in managing construction phases of the 94WBR-shed project in Geelong are quite well communicated in the plan. The techniques are a meaningful reflection of the basic project parameters, resources and adopted PMgt practice. The techniques would allow successful managemen t of project resources. Proposed project management techniques/tools for each PMBOK area (up to 10 tools) that could be used by your PMgt Team in managing demolition and construction phases of the 94WBR-shed project in Geelong communicated in the plan pose some doubts regarding meaningful reflection of the basic project parameters, resources and adopted PMgt practice. Some other techniques might not be more effective in satisfactory management of project resources. (24-27.99 points) (20-23.99 points)

len1993638

5/23/2018 6:09:29 AM

PMgt techniques/too ls Proposed project management techniques/tools for each PMBOK area (up to 10 tools) that could be used by your PMgt Team in managing construction phases of the 94WBR- shed project in Geelong are perfectly communicated in the plan. The techniques are the perfect reflection of the basic project parameters, resources and adopted PMgt practice. The techniques would allow successful managem ent of project resources. (32-40 points) Proposed project management techniques/tools for each PMBOK area (up to 10 tools)that could be used by your PMgt Team in managing construction phases of the 94WBR-shed project in Geelong are very well communicated in the plan. The techniques are almost perfect reflection of the basic project parameters, resources and adopted PMgt practice. The techniques would allow successful managem ent of project resources. (28-31.99 points)

len1993638

5/23/2018 6:09:21 AM

Project management practice/methodology for effective management of the 94WBR-shed project in Geelong is NOT evidenced in the plan, neither meaningfully connects project's (1) scope/deliverable with (2) available resources and (3) proposed PMgt techniques/tools. Video recording of introduction to the plan and project management practice statement by the student (hypothetical Project Manager) is NOT submitted via the DROPBOX video functionality. NO statement of practice is provided in the PMP. (0-4.99 points)

len1993638

5/23/2018 6:09:14 AM

Project management practice/methodology for effective management of the 94WBR-shed project in Geelong is quite well demonstrated in the plan. However, the proposed practice evidences some limitations in relation to necessary connection between project's (1) scope/deliverable with (2) available resources and (3) proposed PMgt techniques/tools. Video recording of introduction to the plan and project management practice statement by the student (hypothetical Project Manager) is be submitted via the DROPBOX video functionality. Project management practice/methodology for effective management of the 94WBR-shed project in Geelong communicated in the plan does NOT fully reflect necessary connection between project's (1) scope/deliverable with (2) available resources and (3) proposed PMgt techniques/tools. Video recording of introduction to the plan and project management practice statement by the student (hypothetical Project Manager) is be submitted via the DROPBOX video functionality. (6-6.99 points) (5-5.99 points)

len1993638

5/23/2018 6:09:04 AM

PMgt practice Project management practice/methodology for effective management of the 94WBR-shed project in Geelong is perfectly demonstrated in the plan. The proposed practice connects perfectly project's (1) scope/deliverable with (2) available resources and (3) proposed PMgt techniques/tools. Video recording of introduction to the plan and project management practice statement by the student (hypothetical Project Manager) is be submitted via the DROPBOX video functionality. (8-10 points) Project management practice/methodology for effective management of the 94WBR-shed project in Geelong is very well demonstrated in the plan. The proposed practice connects very well project's (1) scope/deliverable with (2) available resources and (3) proposed PMgt techniques/tools. Video recording of introduction to the plan and project management practice statement by the student (hypothetical Project Manager) is be submitted via the DROPBOX video functionality. (7-7.99 points)

len1993638

5/23/2018 6:08:57 AM

Brief description of the 94WBR-shed project and its scope/deliverab les for the construction phase, which are communicated is the plan reflect only basic project parameters. These elements of the plan will NOT fully support decision making regarding appropriate PMgt practice and techniques for the 94WBR-shed project in Geelong Brief description of the 94WBR-shed project and its scope/deliverab les for the construction phase, which are communicated is the plan do NOT reflect basic parameters of the 94WBR-shed project. These content of the plan will NOT enable decision making regarding appropriate PMgt practice and techniques for the 94WBR-shed project in Geelong (5-5.99 points) (0-4.99 points)

len1993638

5/23/2018 6:08:41 AM

Project definition and scope Brief description of the 94WBR- shed project and its scope/deliverables for the construction phases are perfectly demonstrated in the plan, which in turn enables decision making regarding appropriate PMgt practice and techniques for the 94WBR-shed project in Geelong (8-10 points) Brief description of the 94WBR-shed project and its scope/deliverables for the construction phase, which are communicated is the plan reflect very well basic project parameters. These elements of the plan will enable decision making regarding appropriate PMgt practice and techniques for the 94WBR-shed project in Geelong (7-7.99 points) Brief description of the 94WBR-shed project and its scope/deliverab les for the construction phase, which are communicated is the plan reflect quite well basic project parameters. These elements of the plan will enable decision making regarding appropriate PMgt practice and techniques for the 94WBR-shed project in Geelong (6-6.99 points)

Write a Review

Project Management Questions & Answers

  Create a project schedule and align resources

Create a project schedule and align resources, Analyze project schedule and resource allocation

  Managerial roles and gap analysis

Write a report on Managerial Roles and Gap Analysis

  Questionaire on project management

Questionaire on Project Management

  Describe the market growth rate for product

Describe the market growth rate for product and service.

  Prepare a work plan and project schedule - gantt chart

Design an online system for the human resources department to manage available job positions.

  Project risk management approach

How does a project risk management approach pro-vide an early warning signal for impending problems or issues

  Black-scholes options pricing model

Calculate the payoff and the profits for investments

  Describe the features or characteristics of product

Describe the features or characteristics of your product or service.

  Write paper on inventory management system

Write paper on Inventory Management System.

  Analysis of the overall project risk

Analysis of the overall project risk

  Investment and performance analysis

Evaluate the usefulness of ROCE

  Distribution strategy and project management

Distribution strategy and project management

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd