ENGIN 5515 Tunneling and Mine Development Design Project

Select one deposit from below three deposits.

Deposit 1
A massive porphyry style deposit located at high altitude in West Papua. Average grade of the deposit is 0.5g/t Au and 0.8% Cu. The deposit has a UCS of 200MPa and is highly fractured; country rock is similar in nature. The deposit has a large foot print area 200m by 400m and is located 300m from surface and open at depth.

Deposit 2
A seam like deposit of gypsum, ranging in thickness from 2.5 to 3.5 m. the total area of the deposit is 10km2. It outcrops at surface at the northern end of the mine lease and dips in a southerly direction at 3°. The floor strata is a mudstone and the roof consists of a well consolidated sandstone.

Deposit 3
A coal seam 2.5 m thick, located 1000m underground. Dip is about 2°. The mining lease is located in mixed rural and urban area. The coal is underlain by a reasonably competent mudstone and overlain by a series of typical coal measures strata. Underlying and overlying the seam are a number of very thin < 20cm thick coal seams within 200m of the seam to be mined.

You are required to do a major underground mine development plan and the initial (first) underground development design, specifically as follows.

1. Of the mining methods you proposed for this deposit, decide a most adequate mining method and further propose an adequate annual production rate. (Key points to address in this part, (1) if the mining method is optimal and (2) if the production rate is adequate.)

2. Propose a mine development plan for the deposit. (Key points to address in this part, (1) if the plan is rational and (2) if the production rate can be facilitated.)

3. Select and Design one of the major underground developments to access the orebody (Key points to address in this part, (1) if the design is rational and (2) if it can facilitate the production rate required.). This part should include:
- Specify the development selected,
- Design its cross section to meet the production rate,
- Verify the cross section to meet the ventilation requirement,
- Excavation strategies and designs (including rock breakage, ventilation, mucking, drainage control and ground support designs), and
- Any other salient points.

Attachment:- Tunneling and Mine Development Design Project.rar

Reference no: EM133024706

Questions Cloud

What is the difference between a tactic and strategy : What is the difference between a tactic and strategy?
Personality positively affects decision-making style : Conflict and cooperation are opportunities for learning and Personality positively affects decision-making style.
Who are the stakeholders of carnival cruise lines : Who are the stakeholders of carnival cruise lines? How is each group of stakeholders affected by such crisis as the Triumph and Cost Concordia?
Why is it helpful to follow a project management methodology : Why is it helpful to follow a project management methodology? Explain and share at least one pro and one con about Six Sigma, Agile, and Lean project management
Propose a mine development plan for the deposit : Propose a mine development plan for the deposit. (Key points to address in this part, (1) if the plan is rational and (2) if the production rate
What is consumer health informatics : What is consumer health informatics and why is it different from clinical informatics?
Achieve product differentiation : Describe the ways in which database technologies could be used by a toy manufacturer to achieve product differentiation. (Your answer should have case scenario)
What is business analysis : What is business analysis? Write a sentence or two describing what it is and give an example of some tasks.
Leadership vision and portfolio : What kind of leader you wantto be-the style and the communication Styles and Compare and Contrast Leadership Styles, Communication and Influence

Reviews

len3024706

11/6/2021 5:37:57 AM

Option 1 as a block cave mine. Can only be attempted by someone with knoweledge of modern mining techniques. No accountants trying to do mining please. Tried with someone else, but they failed to grasp whats required. A mine plan, including development, production rate etc.

Write a Review

Other Engineering Questions & Answers

  How many address and data lines are there in the chip

How many address and data lines are there in the chip - How many chips are needed to construct a 16K x 16 RAM?

  Control and loop structures in python

Choose two loop structures and explain which you think is most convenient and why. Also, choose two control structures such as if else blocks and case statements and explain which you think is the most convenient and why.

  Determine the design of the cut

Determine the design of the cut, including burden and spacing for each element of the cut - burden and spacing of the easer, perimeter and lifer holes

  Discuss the implementation of cia

Do you believe that unexpected behavior in a computer program necessarily a vulnerability? Why or why not?Discuss the implementation of CIA

  Design a circuit that monitors chemical level in given tank

Design a circuit that monitors the chemical level in each tank and indicates when the level in any two of the tanks drops below the specified point.

  Determine the gain k so that phase margin is sixty degrees

Determine the gain K so that the phase margin is 60 degrees when T = 0.2. Plot the phase margin versus the time delay T for K as in part (a).

  Plant or waste water treatment plant

Construction Technology 4 (MHK202862) - Evaluate the degree of implementation of sustainable building concepts used in the planning, design and maintenance of this unit.

  Use a subroutine to find the sum of the array elements

Write a program to use a subroutine to find the sum of the array elements. For simplicity, assume that the sum of the data values is less than $FF

  Derive an expression for the transfer function

For the high pass filter design - Derive an expression for the transfer function showing all steps. Determine the 3 dB cut off frequency in terms of R and C

  Determine if restrictions on elastic constants are satisfied

The following data has been obtained experimentally for a composite based on an unidirectional carbon-epoxy prepreg (MR50 carbon fiber at 63% by volume in LTM25 epoxy). Determine if the restrictions on elastic constants are satisfied.

  Describe the system you propose to model with a harmonic

carefully describe the system you propose to model with a harmonic oscillator equation. State the dependent variable and describe the rest position, the restoring force, and the damping. Address the three items above in the form of a short essay. In ..

  Design and simulate a data acquisition system

Measurement, Data Acquisition and Signal Processing Project - Design and simulate a data acquisition system. Literature review of selected interfacing standard

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd