Project: Construction of Carbon Revolution Building 2

1. BACKGROUND

Introduction

You are members of the Capital Projects Team of Facility Services Department at Deakin University who are assigned to undertake work encompassing a high level estimate of building cost of the Structural Works for the Carbon Revolution Building 2, located in the Waurn Ponds campus of Deakin University. 

2. THE DESIGN BRIEF & SCOPE

The work for this project is to be advertised for tender in the near future. To date, some of the design drawings have been completed. For this stage, a high level cost estimate is required for the owner estimate of the cost of the project. The following scope of work has been assigned for the high level project cost estimate. 

-  The site location is as indicated (Appendix A)

-  The design drawings are provided (Appendix B) 

-  Additional drawings may be released during the design progress

-  The cost estimate is only for foundation and structure of the building

-  The Bill of Quantities is to be completed (Appendix C)

-  The cost of work is to be estimated based on published construction rates (e.g.

Rawlinsons Construction Handbook, Cordell Building Cost Guide, Aust. Institute of Quantity Surveyors, etc.)

-  Any assumptions, notes or disclaimers regarding your cost estimate should be documented in your Assessment 1 report submission and in your Journal Diary

You may insert additional rows under 'D. MISCELLANEOUS' section for other costs you can identify from the drawings, as well as providing some brief details on each of these additional items. 

3. CONDUCT OF WORK

The Deakin University rules and regulations apply to this work.

4. SITE INSPECTIONS

At this stage, site inspections are not required. Employees may use satellite image to acquaint themselves with the site where any work is to be undertaken. Refer to Appendix A.

5. EXTENT OF WORK

A. The overall works to be undertaken includes:

-  Undertaking high-level (rough) estimate of works quantity based on provided design drawings of the project 

-  Undertaking research on the unit rates (unit price) to conduct construction works for the project

-  Provision of completed Bill of Quantities with prices 

-  Clearly specifying the source of data and additional information about justification as required, conditions, inclusions or limitation of the rates

B. This Assessment should be submitted as a group report.

C. A table indicating group members' contribution to the works should be submitted with the report. 

D. Only 1 report per group is to be submitted via CloudDeakin.

E. Groups will be allocated in Week 1 Seminars or via CloudDeakin for off-campus students.

Attachment:- Assignment.rar

Reference no: EM131144062

Questions Cloud

Determine the equivalent viscous-damping coefficient : If the mass is driven harmonically by a 90-N force at 25 Hz, determine the equivalent viscous-damping coefficient if the coefficient of friction is 0.1.
Identify at least three possible use cases and actors : Identify at least three possible use cases and actors. Create a use case diagram that shows how service requests are handled.
Calculate the amplitude of the harmonic force applied : When excited harmonically at 5 Hz, the steady-state displacement of the mass is 5 cm. Calculate the amplitude of the harmonic force applied.
Find the simple linear regression model and complete anova : Find the simple linear regression model, and interpret the meaning of the slope  in the setting of this problem.Complete the ANOVA Table
Project - construction of carbon revolution building : Project: Construction of Carbon Revolution Building. You are members of the Capital Projects Team of Facility Services Department at Deakin University who are assigned to undertake work encompassing a high level estimate of building cost of the Str..
Compute operating income for rim and tip : Compute operating income for RIM and TIP, separately, and the total operating income for both.- If the results in part 1 for TIP are typical, why do you believe RIM decided to sell off its interest in TIP?
What conditions for the population and the study design : What conditions for the population and the study design are required by the procedure you used in (a)? Which of these conditions are important for the validity of the procedure in this case?
At the end of gordman department store fiscal year : At the end of Gordman Department Store's fiscal year on December 31, 2010, these accounts appeared in its adjusted trial balance.
What professionals work within that mode : What professionals work within that mode? What does this mode offer in terms of care? What are the expected outcomes?

Reviews

Write a Review

Civil Engineering Questions & Answers

  What is the total head 5m below the river bed

Consider again the scenario above. Assume the water is static. Assume a datum at the water surface. a) What is the total head 5.0m below the river bed b) What is the pore water pressure at that level

  Find the direction and magnitude of the equivalent force

Find the direction and magnitude of the equivalent force at the section a-a. Find the direction and magnitude of the bending moment at the section a-a

  Determine the rotational speed of the rollers

The distance from the center of the plate to the point of contact between the plate and the roller is 12 cm. The radius of the roller is 0.5 cm. Assuming no slip between the wheels and the plate, determine the rotational speed of the rollers.

  Determine the magnitude of the reactive force pin o exerts

The pendulum consists of a 10-kg uniform rod and a 15-kg sphere. If the pendulum is subjected to a torque of M= 50 N*m, and has an angular velocity of 3 rad/sec when theta= 45 degrees, determine the magnitude of the reactive force pin O exerts on the..

  What is the drawdown halfway between well a and well b

Two pumping wells, A and B, are 100m apart. They each completely penetrate a homogeneous, confined aquifer, and pump at exactly the same rate, 5m^3/day. Prior to pumping

  What is the concentration of cod in the effluent

The maximum specific growth rate of the organisms driving this reaction is 5.0 days -1 and the growth rate is 0.54 day-1. The activated sludge tank has a volume of 40 m3 and the flow rate into it is 400 m3/day.

  Determine the boundary work done during this process

A piston-cylinder device initially contains 0.07 m3 of nitrogen gas at 130 kPa and 120°C. The nitrogen is now expanded poly-tropically to a state of 100 kPa and 100°C

  Determine the stations and elevations of the bvc and evc

A +2 percent grade on an arterial highway intersects with a -1 percent grade at station (535 + 24.24) at an elevation of 300 ft. if the design speed of the highway is 65 mi/h,

  What is the delfection due to self weight at the end of the

A 13 foot long C10x25 beam is supported as a cantilever beam where x=0 on the left end. It is subject to no externally applied loads.

  Compute the flexural strerangth if the load is fracture

A three point bending test is performed on a glss specimen having a rectangular cross section of hight d =6 mm and width b = 12 mm the distance between support points is 45mm.

  Minimizing the tension tab

What should TAC , TAB and the acute angle ? between TAB and the vertical to minimize the tension TAB ? Take o and W = 1,000 N. Hint: Consider various possible force triangles and decide on inspection how to minimize TAB.

  Tangential component of the acceleration of the sled

Knowing that the coefficient of kinetic friction between a sled and the run is 0.10 and that the speed of the sled is 25 ft/s at B, determine the tangential component of the acceleration of the sled a) just before it reaches B, b) just after it pa..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd