Products under the traditional costing system

Assignment Help Database Management System
Reference no: EM13646463

Werger Manufacturing Corporation has a traditional costing system in which it applies manufacturing overhead to its products using a predetermined overhead rate based on direct labor-hours (DLHs). The company has two products, W82R and L48S, about which it has provided the following data:

 

 

W82R

L48S

 

Direct materials per unit................

$11.50

$62.90

 

Direct labor per unit......................

$2.00

$13.00

 

Direct labor-hours per unit............

0.20

1.30

 

Annual production........................

45,000

10,000

The company's estimated total manufacturing overhead for the year is $1,521,960 and the company's estimated total direct labor-hours for the year is 22,000.

The company is considering using a variation of activity-based costing to determine its unit product costs for external reports. Data for this proposed activity-based costing system appear below:

 

Activities and Activity Measures

Estimated Overhead Cost

 

Supporting direct labor (DLHs)...........

$   352,000

 

Setting up machines (setups)...............

201,960

 

Parts administration (part types)..........

     968,000

 

Total.....................................................

$1,521,960

 

Activities

W82R

L48S

Total

 

Supporting direct labor......

9,000

13,000

22,000

 

Setting up machines...........

814

374

1,188

 

Parts administration...........

924

1,012

1,936

Required:

a. Determine the unit product cost of each of the company's two products under the traditional costing system.

b. Determine the unit product cost of each of the company's two products under activity-based costing system.

Reference no: EM13646463

Questions Cloud

State how many moles of boron tribromide are present : How many moles of boron tribromide, BBr_3, are present in a sample that contains 6.02 moles of bromine atoms
Torri manufacturing corporation -determine unit product cost : Determine the unit product cost of each of the company's two products under the traditional costing system
Evaluate the speed of the bucket : A bucket of mass 1.60 kg is whirled ina vertical circle of radius 1.40 m. Atthe lowest point of its motion the tension in the rope supporting the bucket is 25.0 N. Find the speed of the bucket
State what is the mass of gold ring : The two rings are heated to 66.1 C and dropped into a 15.0 mL of water at 20.5 C. When equilibrium is reached, the temperature of the water is 22.5 C. What is the mass of gold ring. (Assume a density of 0.998 g/mL for water.)
Products under the traditional costing system : Determine the unit product cost of each of the company's two products under the traditional costing system
Compute what impulse was delivered by the player : a 0.40kg soccer ball approaches a player horizontally with avelocity of 20m/s to the north. what impulse was delivered by the player
Find the velocity of the object at the end of this interval : A 1.7kg object is at rest. A3N force to the right acts on theobject during a time interval of 1.5s. find the velocity of the object at the end of this interval
Explain the freezing point of a solution with glucose : What is the freezing point of a solution that contains 10.0 g of glucose (C6H12O6) in 100 g of H2O. Kf for water is 1.86oC/m
Compute what is the specific gravity of this other fluid : A bottle has a mass of 35.00 g whenempty and 98.49 g when filled withwater. When filled with another fluid, the mass is 88.70 g. What is the specific gravity of this other fluid

Reviews

Write a Review

Database Management System Questions & Answers

  Knowledge and data warehousing

Design a dimensional model for analysing Purchases for Adventure Works Cycles and implement it as cubes using SQL Server Analysis Services. The AdventureWorks OLTP sample database is the data source for you BI analysis.

  Design a database schema

Design a Database schema

  Entity-relationship diagram

Create an entity-relationship diagram and design accompanying table layout using sound relational modeling practices and concepts.

  Implement a database of courses and students for a school

Implement a database of courses and students for a school.

  Prepare the e-r diagram for the movie database

Energy in the home, personal energy use and home energy efficiency and Efficient use of ‘waste' heat and renewable heat sources

  Design relation schemas for the entire database

Design relation schemas for the entire database.

  Prepare the relational schema for database

Prepare the relational schema for database

  Data modeling and normalization

Data Modeling and Normalization

  Use cases perform a requirements analysis for the case study

Use Cases Perform a requirements analysis for the Case Study

  Knowledge and data warehousing

Knowledge and Data Warehousing

  Stack and queue data structure

Identify and explain the differences between a stack and a queue data structure

  Practice on topic of normalization

Practice on topic of Normalization

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd