N5E06 Construction Information (Drawing, Detailing, Specification) - Higher Nationals Diploma

Construction Information (Drawing, Detailing, Specification)

P1 Explain the use of construction information in the context of a project.

P2 Describe the different types of construction information and their uses.

P3 Develop a set of general arrangement drawings, selected details and door/window schedules.

P4 Produce an outline bill of quantities.

P5 Relate a set of construction drawings to a specification.

P6 Evaluate construction drawings and details to identify ‘clashes'.

P7 Assess the types of information produced by different participants in a construction project.

P8 Examine the relationship between different bodies of information and how they work in conjunction.

M1 Compare different types of construction information to identify their suitability in specific contexts.

M2 Compose a schedule of works.

M3 Critique a body of construction information, identifying errors and discrepancies.

M4 Compare the roles of CAD and BIM in the collaborative production of construction information.

D1 Justify the use of specific types of construction information in support of a given project.

D2 Propose corrections to construction drawings and specifications using industry standard forms of notation.

Learning Outcome 1 : Evaluate different types of construction information in the context of diverse project types.

Learning Outcome 2: Develop construction drawings, details, schedules and specifications in support of a given construction project.

Learning Outcome 3: Interpret different types of construction information in order to explain a construction project.

Learning Outcome 4: Assess ways in which construction professionals collaborate in the production of construction information.

Assignment Brief

Scenario
You have recently been employed as a civil engineering technician. Your employer, a medium-sized general contractor, has been commissioned to design and build a small building in a local industrial park. The design team within the company has prepared a set of outline design drawings, which provide general information about the proposed building, site and form.

You are tasked with the responsibility of preparing the construction information package that will allow the construction team to build the project. The package of information required includes the following:
• Site Location Plan
• Site plan
• Floor plan
• Elevations
• Section/Details
• Door and window schedules
• Outline bill of quantities
• Schedule of works

Accompanying the construction information package, your employer wishes to understand your reasons for the drawings, specification and schedules that you have produced.
The submission is comprised of two parts:
1. Construction Infrmation; to include:
a) Site Location Plan (1:1250)
b) Site plan (1:500 or 1:1000)
c) Floor plan (1:50 or 1:100)
d) Elevations (1:50 or 1:100)
e) Section (1:20)
f) Detail(s) (1:5)
g) Door and window schedules
h) Outline bill of quantities
i) Schedule of works

All drawings are to be on a minimum sheet size of A3. They should include a title block, showing project information and be numbered using an industry standard.

Drawings should be produced using an industry standard CAD software package. BIM software may be used but is not required.

2. A written report - this should be a justification of your decisions for producing specific information for the project and compare the choices you have made with other potential information types.

LO 3: Interpret different types of construction information in order to explain a construction project.
LO 4: Assess ways in which construction professionals collaborate in the production of construction information.

Scenario
One of your colleagues, in a medium-sized general contracting firm, has produced a set of construction information documents for a small industrial building. Before issuing this information to the construction team, your employer has asked that you review the information to ensure that it is fit-for-purpose. In particular, your employer asks you to:

• coordinate the drawings with the schedules, specifications and bill of quantities
• identify any information clashes
• highlight areas where there may be missing, or incorrect information provided.

You are then tasked with making corrections to the construction information, ensuring that copies of the originals and your recommended changes are recorded.

Finally, you are asked to prepare a short report on the construction information package that you have reviewed. You will discuss your findings with the original author of this work, as part of both of your continuing professional development.

The submission is comprised of two parts:

1. Construction Information Review; to include:
a. ‘Redlined' construction drawings (highlighting errors or inaccuracies)
b. ‘Marked-up' specifications and schedules (highlighting errors or inaccuracies)
c. Corrected versions of all documentation, with suitable revisions recorded.

2. Feedback Report - Produce a report explaining the design team roles (such as Architect, Landscape Architect, Quantity Surveyor, Civil Engineer, Building Services Engineer etc), how they work with each other and assessing the types of information produced by each. The report should also highlight and compare the impact of CAD and BIM in the collaborative process of producing construction information.

Learning Outcome 3 - Interpret different types of construction information in order to explain a construction project
001: Site Location Plan
Additional Info: Developers owns neighbouring site currently highlighted in green
• Site location should be highlighted by a red outline (not red shade)
• Neighbouring site owned by developer should be highlighted by blue outline (not green shade)
• Scale should be 1:1250
• Remove "proposed site" text

002: Proposed Ground Floor Plan
• Door to living room should be 400mm clear of bottom of stairs
• Stair case numbered incorrectly
• No level access indicated to house (ramp preferable to front entrance)
• Cavity closer details inconsistent
• Study room dim line not snapped to correct place
• No cavity close detail to window at rear of kitchen/ dining/ family
• Incorrect cavity detail at rear left corner of kitchen/ dining/ family
• Kitchen spelt incorrectly
• Overall dimension to south elevation incorrect
• Beams in kitchen area not dashed as required
• Lounge text size not consistent with other room labels
• Incorrect dimensions to lounge area (225mm beside fireplace should be 2225mm)
• Scale to a non uniform size (should be either 1:50/ 1:100)
• Step to patio at rear should be 400mm min from door
• All Storm and foul sewer lines should be dashed
003: Proposed First Floor Plan
• Door to Bedroom 3 should be 400mm clear of bottom of stairs
• Block wall to bathroom extended through to wrong leaf
• Bedroom 3 label used twice
• Wall to dressing room overhangs internal leave
• Additional stair to staircase needs removed
• Side dimension not snapped to outer wall
• Incorrect dimension to front bedroom 3 (width dim)
• Sink to bathroom sitting into wall
• Scale shown as NTS (should be either 1:50/ 1:100
004: Proposed Second Floor Plan
• Spelling mistake to "Second floor plan"
• Dimension to bedroom 5 incorrect
• Scale to a non uniform size (should be either 1:50/ 1:100)
• Clash of shower and toilet to bathroom
• Bathroom not labelled
• Wall cutting through external wall

005: Proposed North and East Elevations
• Window to East Elevation width is incorrect (1571mm)
• No chimney indicated to east elevation
• Incorrect dimension to bottom left window on north elevation
• Hatch pattern missing to north elevation
• Steps indicated to north elevation- should be a ramp access
• "East Elevation" spelt incorrectly
• Not printed to an appropriate scale
006: Proposed South and West Elevations
• Not printed to an appropriate scale
• West elevation is handed
• Porch area missing from west elevation
• Door swings missing from French doors- south elevation
• Middle Velux missing from south elevation
• SFL line type incorrect
• Elevations labelled incorrectly
007: Proposed Section
• Incorrect floor to ceiling height indicated ground floor (1760mm)
• Rooms not labelled along section
• No of risers incorrect on ground floor descriptor
• Going length does not meet regulations
• Wall to upper floor not attached to ceiling level
• Not printed to an appropriate scale
008: Proposed Detail 1
• DPC missing from detail
• DPM missing from detail
• Insulation missing from wall
• Hatch missing off foundation
009: Proposed Detail 2
• Missing label for keystone lintel
• Insulation missing from wall above lintel and jamb detail
• Brickwork hatch pattern missing
• Not to an appropriate scale
Construction Specification
• Foundation- wall thickness should be 300mm

Reference no: EM133177346

Questions Cloud

Prepare all necessary journal entries for kingbird : Corporation leased equipment to Kingbird, Inc. on January 1, 2020. Prepare all necessary journal entries for Kingbird in 2020
Management and organizational behavior : EY provides global services in four main areas: assurance, tax, transactions and advisory. It helps clients retain the confidence of investors, manage their ris
Prepare the entry to record bad debt expense : Assume Wilton prepares an aging schedule that estimates total uncollectible accounts at $24,600. Prepare the entry to record bad debt expense
Define the term transferable skill : Define the term transferable skill. Make a list of your transferable skills.
Production of construction information : Describe the different types of construction information and their uses and Evaluate construction drawings and details to identify clashes
What would be the value of the shareholder portfolio : If the P/E ratio stayed the same under the share repurchase alternative, what would be the share value? What would be the value of the shareholder's portfolio
Protect the rights of contractual employees : 1. If you employ the services of job contractor that fails to pay the wages of his employees, will you, as the job owner, equally liable? Yes or No? Discuss why
Compute the altman z-score value for mesoblast : Using financial statement data of 2018 and 2019, compute the Altman Z-score value for Mesoblast for 2018 and 2019
Developing relationship with funders : Developing a relationship with Funders in the course text, search the internet to find three possible funders for your proposal.

Reviews

Write a Review

Other Subject Questions & Answers

  Cross-cultural opportunities and conflicts in canada

Short Paper on Cross-cultural Opportunities and Conflicts in Canada.

  Sociology theory questions

Sociology are very fundamental in nature. Role strain and role constraint speak about the duties and responsibilities of the roles of people in society or in a group. A short theory about Darwin and Moths is also answered.

  A book review on unfaithful angels

This review will help the reader understand the social work profession through different concepts giving the glimpse of why the social work profession might have drifted away from its original purpose of serving the poor.

  Disorder paper: schizophrenia

Schizophrenia does not really have just one single cause. It is a possibility that this disorder could be inherited but not all doctors are sure.

  Individual assignment: two models handout and rubric

Individual Assignment : Two Models Handout and Rubric,    This paper will allow you to understand and evaluate two vastly different organizational models and to effectively communicate their differences.

  Developing strategic intent for toyota

The following report includes the description about the organization, its strategies, industry analysis in which it operates and its position in the industry.

  Gasoline powered passenger vehicles

In this study, we examine how gasoline price volatility and income of the consumers impacts consumer's demand for gasoline.

  An aspect of poverty in canada

Economics thesis undergrad 4th year paper to write. it should be about 22 pages in length, literature review, economic analysis and then data or cost benefit analysis.

  Ngn customer satisfaction qos indicator for 3g services

The paper aims to highlight the global trends in countries and regions where 3G has already been introduced and propose an implementation plan to the telecom operators of developing countries.

  Prepare a power point presentation

Prepare the power point presentation for the case: Santa Fe Independent School District

  Information literacy is important in this environment

Information literacy is critically important in this contemporary environment

  Associative property of multiplication

Write a definition for associative property of multiplication.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd