Unit Learning Outcomes:

LO1 Formulate a project that will provide a solution to an identified problem
LO2 Manage a project within agreed timescales and specification, documenting the process throughout
LO3 Evaluate potential project management solutions
LO4 Produce a project report and deliver a presentation of the final project Outcomes

Assignment Brief and Guidance:

Assignment Brief

You are working as an assistant in a design office. A developer in your local area has contacted your company looking for advice as to what would be a suitable project to meet the needs of the local community but also be a profitable investment. The developer is considering a number of different sites in the area. Research your local area and report back to the developer three possible solutions and select one which is your main recommendation.

The developer is keen to ensure that the report covers "Managing Risk in Modern Construction". It is important to highlight throughout the report the specific TOPIC which is selected below.

(Pearson Unit 1 Set Theme 2019-2020) Managing Risk in Modern Construction

Select one Topic (for the class)
1. Minimising risk through design and specification
2. Material selection and risk
3. Mitigating error and risk
4. Managing risk in site operations (Refer to Pearson-set theme and topic release document)

Tasks

Establish your aims and objectives for the project. Outline objectives and timeframes based on the scenario set by your tutor.

Produce an appropriate project management plan that includes relevant actions to meet objectives and timeframes.

Conduct research to generate knowledge which will form the basis for analysis of the scenario posed in the brief.

Analyse your findings and draw conclusions to form the basis for recommendations. Present and produce your project in an appropriate manner for the intended audience. Communicate your recommendations in an appropriate manner for the intended audience. Complete a performance review that addresses the following:

The success of the project and its effectiveness in addressing the issues identified in the Pearson-set theme and topic.
Your own performance.

Verified Expert

In this project, the focus is on the risk management of site while construction is taking place. Risk management is a critical part of construction sites as it ensures safety of construction workers, since a manufacturing site can be perilous. Sites have number of machinery which can be difficult to handle and only professionals should operate it.

Reference no: EM132371914

Questions Cloud

Implement the r-tree by using the existing libraries : ITEC874 - Big Data Technologies - Macquarie University - You can implement the R-tree by using the existing libraries provided in the programming language
Prepare the business combination valuation entries : Corporate Accounting Assignment - Prepare the business combination valuation entries and pre-acquisition entry at acquisition date
Give characteristics of isoquant : Give characteristics of isoquant (16) Using Harvard refencing system
What are the key business processes for gracious industries : HI5019 Strategic Information Systems for Business and Enterprise-Holmes Institute-Australia-What are the key business processes for Gracious Industries?
Produce an appropriate project management plan : Establish your aims and objectives for the project. Outline objectives and timeframes based on the scenario set by your tutor - Produce an appropriate project
Analyse different strategic management tools : BMGT7009-Leadership in Business-Toi Ohomai Institute of Technology-New Zealand-How can these strategic management tools help the leaders at Pohutu make better.
Investigate construction material performance properties : N5E03 Science and Materals - BTEC (RQF) - Discuss the environmental and sustainability factors which impact on and influence the material choices
Explain how real GDP measures performance of the economy : Production output performance analysis - Define and explain how real GDP measures performance of the economy. Provide an overview of the chosen economy
Calculate Schedule Variance : CST 617 - Project Cost & Schedule Control Assignment, Geneva Business School, Lincoln University of Business and Management, UAE. Calculate Schedule Variance

Reviews

len2371914

9/17/2019 2:31:51 AM

LO3 Evaluate potential project management solutions PS Explore project management strategies to determine suitability for a given project. P6 Justify the selection of your preferred solution, making reference to your initial project specification. M3 Compare the outcomes of your initial planned resources, timescales and costs against actual outcomes. LO3 LO4 D2 Appraise your own performance in managing the project; draw conclusions and make recommendations that would further improve your performance in the future. LO4 Produce a project report and deliver a presentation of the final project outcomes P7 Produce a written report identifying each stage of the project. P8 Utilise appropriate forms of referencing and citation in the preparation of a written report. P9 Prepare a presentation of your final project outcomes, utilising industry standard software. M4 Present your final project outcomes and recommendations to a selected audience.

len2371914

9/17/2019 2:31:34 AM

LO2 Manage a project within agreed timescales and specification, documenting the process throughout P3 Identify potential resources, costs and timescales. P4 Describe a range of appropriate techniques for generating realistic potential solutions. M2 Prepare and update a project management plan, using standard systems of time and resource tracking.

len2371914

9/17/2019 2:31:25 AM

Pass Merit LO1 Formulate a project that will provide a solution to an identified problem P1 Select an appropriate construction-based project, giving reasons for your choice. P2 Identify the main components of a project specification. M1 Explain why the project specification is of fundamental importance to a successful project outcome. Distinction LO1 LO2 D1 Evaluate the relationship between project identification, feasibility and project planning, with consideration of the impact of project scope on time and resources.

Write a Review

Civil Engineering Questions & Answers

  What type of drilling and sampling equipment would recommend

A one-story, 50-m wide X 90-m long manufacturing building is to be built on a site underlain by medium dense to dense silty sand with occasional gravel. This soil probably has better than-average engineering properties and average uniformity.

  How to draw the expected water table profile along the line

Compute the water table profile drawn in part B. Provide a detailed description of your methodology, and limit your solution to include only 4 image wells. Plot the profile, and provide drawdown amounts at X = -400 m, -200 m, -100 m, 100 m, 200 m,..

  How did dmitri mendeleev come up with the periodic table

How did Dmitri Mendeleev come up with the periodic table?

  What is the minimum chain length for the application

A motorcycle sprocket on the rear wheel has a diameter of 24 cm, and trhe driver sprocket has a diameter of 4.0 cm. The driver sprocket shaft and rear axle are 60 cm apart. What is the minimum chain length for the application.

  A package in the shape of a rectangular box can be mailed

a package in the shape of a rectangular box can be mailed bynbspthe us postal service if the sum of its length and

  Determine the value of w at which elastic instability

All the members of the symmetrical rigid frame shown in Figure S11.2 are of uniform section. Determine the value of W at which elastic instability of the frame occurs in its own plane.

  Determine true coefficient of discharge in the weir equation

A rectangular channel carries a discharge of 2.00 m3/sec per meter of channel width over a weir crest that is 1.4 m in height. The energy grade line upstream of the weir measure 2.7 m above the channel bottom

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Determine the maximum vertical force per foot

Determine the maximum vertical force per foot that can be applied to the wall if the tensile strength is assumed to be equal to zero

  Calculate whether the process is capable or not

calculate whether the process is capable or not.

  Derive the approximate closed form viscoelastic solution

Derive the approximate closed form viscoelastic solution for a strike-slip fault appropriate for times short compared to the material relaxation time, equation

  How much energy in horsepower is lost by the water while

A pipeline 1200 ft long and 8 in. in diameter has at its inlet point 75ft of available hydraulic energy with respect to the reference level. The velocity in the pipe is 5 fps: the pressure at its end is 12psi.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd