Produce a circuit design that can control speed of conveyor

Assignment Help Engineering Mathematics
Reference no: EM131439745

Electronic Engineering Assignment

Please see attached assignment tasks 4, 5, 6 and 7 need corrections done.

Task 1

The Maintenance Manager has asked you to review the planned maintenance (PM) procedure for 2 pieces of equipment in the factory. The 1st piece of equipment is a 50m conveyor used to transport product in a cleanroom between process steps. The conveyor also contains a number of elevators protected by guarding. The 2nd piece of equipment is a mixing tank agitator driven by an induction motor controlled by an inverter. The tank is made of stainless steel and contains acidic chemicals when in use.

As part of the review you will need, for each apparatus, to explain and identify the hazards that exist when a planned maintenance (PM) is being carried out. These are risks posed to anyone in the area, not just the Technicians carrying out the PM. In particular focus on electrical hazards

Task 2

From the information in task 1 you must also specifically list the control measures required to eliminate or manage the risks to the Maintenance Technicians and others. In particular give a detailed range of control measures to prevent/reduce the risk of electric hazards

Task 3

A quality and safety audit is to be carried out on all the maintenance procedures in the factory. The Maintenance manager has asked you with reference to at least 4 pieces of safety legislation, regulations or standards,andhow these might apply to the PM activities described in task 1

Task 4

From the audit you have been asked to draw a start/stop/retain relay control circuit that could be used for the safe and emergency operation of a 3-phase drilling machine and lathe in the workshop that must include 2 emergency stop positions.Alsoexplain how the circuit would operate and what types of commercial relays/contactors could you select.

Task 5

The production manager also wants your help in deciding the best type of motor system for controlling the speed of a new automatic conveyor line. He has asked you to explain with the aid of diagrams and research evidence, the operational features system for an AC drive system with variable speed control.

Task 6

As an alternative to the AC system in task 5, you have also been asked to produce a circuit design that can control the speed and direction of the conveyor using aDC motor drive system. With reference to circuit layout drawings and research sources, explain how it operates.

Task 7

A new robot cell has been installed to operate along with the conveyor system above. You have been asked to:

a) Describe with the aid of diagrams, the operation of a safety relay system used on a robot cell. (400 words)
b) Explain how this system addresses the hazards and control measuresby also referencing relevant legislation, regulations or standards. (400 words)

Task 8

To ensure that the conveyor system is safe and complies with legislation, compare the construction and operation of two different types of stop/start/retain relay control circuits for suitable for either the AC or DC system in task 5 or 6.

For example you may compare an electro-magnetic relay system with an electronic logic system. Include appropriate drawings, parts, truth tables and their advantages/disadvantages in your explanation.

Attachment:- Assignment_Correctiins_Needed.rar

Reference no: EM131439745

Questions Cloud

Elements that affect strategy formulation : The elements that affect strategy formulation are the same whether a company is domestic or international. Do you agree or disagree with this statement? Why? Support your argument with examples.
Describe the challenges that program planners face : Describe the challenges that program planners face when trying to promote the idea of personal responsibility with regard to health behavior while also trying to avoid placing the blame on individuals for their health status. Is it possible to do bot..
Determine series capacitor requirements : EEE471 POWER FLOW DESIGN PROJECT. Determine series capacitor requirements for the 345 kV lines assuming you'll need to ship all 600 MW from generators 1 and 2 over one line (one line out) under heavily loaded case
Feet from the southern end of the beach : For the purposes of this question, a "location" on the beach equals the number of feet from the southern end of the beach. For example, location 200 is 200 feet from the southern end of the beach, and 800 from the northern end.
Produce a circuit design that can control speed of conveyor : As an alternative to the AC system in task 5, you have also been asked to produce a circuit design that can control the speed and direction of the conveyor using aDC motor drive system.
Identify the objective function in simple verbal statements : Valencia Products makes automobile radar detectors and assembles two models: LaserStop and SpeedBuster. The firm can sell all it produces. Both models use the same electronic components.
High-wage employer of highly skilled labor : Acme Consulting is a low-turnover, high-wage employer of highly skilled labor. Most employees who join Acme Consulting plan to stay with the firm for several years. Acme Consulting has a plentiful applicant pool and typically receives approximatel..
Dominion mandate as a motivator for team creativity : What is the role of the Dominion mandate as a motivator for team creativity? Discuss how convergent and divergent thinking can enhance team creativity. Include at least two academic journal articles on convergent and divergent thinking. How is conver..
Benefit that accrues to us consumers of steel : If the Japanese steel industry subsidizes the steel that it sells to the United States, the harm done to U.S. steel producers is less than the benefit that accrues to U.S. consumers of steel. Why is this? And how do you know?

Reviews

Write a Review

Engineering Mathematics Questions & Answers

  Prime number theorem

Dirichlet series

  Proof of bolzano-weierstrass to prove the intermediate value

Every convergent sequence contains either an increasing, or a decreasing subsequence.

  Antisymmetric relations

How many relations on A are both symmetric and antisymmetric?

  Distributed random variables

Daily Airlines fies from Amsterdam to London every day. The price of a ticket for this extremely popular flight route is $75. The aircraft has a passenger capacity of 150.

  Prepare a system of equations

How much money will Dave and Jane raise for charity

  Managing ashland multicomm services

This question is asking you to compare the likelihood of your getting 4 or more subscribers in a sample of 50 when the probability of a subscription has risen from 0.02 to 0.06.]  Talk about the comparison of probabilities in your explanation.

  Skew-symmetric matrices

Skew-symmetric matrices

  Type of taxes and rates in spokane wa

Describe the different type of taxes and their rates in Spokane WA.

  Stratified random sample

Suppose that in the four player game, the person who rolls the smallest number pays $5.00 to the person who rolls the largest number. Calculate each player's expected gain after one round.

  Find the probability density function

Find the probability density function.

  Develop a new linear programming for an aggregate production

Linear programming applied to Aggregate Production Planning of Flat Screen Monitor

  Discrete-time model for an economy

Discrete-time model for an economy

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd