Process of exploration project to mining operation

Assignment Help Other Engineering
Reference no: EM131002847

NB: List and justify all your choices and assumptions.

1.    Describe the process of exploration project to mining operation with reference to the ore resource/reserve estimation process.

2.    What is meant by ore? What is meant by the term waste? What is proto ore?

3.    What is meant by core logging? Typically what parameters would typically be recorded when undertaking core logging? 

4.    What is meant by the popularly-used word transparency?

5.    Describe in detail an electrical exploration technique.

6.    What is reverse cycle drilling? How does it differ from normal drilling?

7.    What is meant by the following terms:

  • Range
  • Variance
  • Standard deviation
  • Kurtosis
  • Skewness

8.    Illustrate and discuss the effect of support on grade-tonnage relationships used to assess selective mining units.

9.    What are the rules regarding the reporting of exploration results?

10. Give three likely examples of support that might be used in a mining estimation, and explain how you would change from one to another.

11. Describe a polygonal estimation technique.

12. Give an explanation of why kriging techniques are preferable to other estimation methods.

13. Explain what a "competent" person means in the JORC. What qualifications do competent persons require?

 

14. Determine the variance for the grade data set in the following table

Sample Number

Grade Au g/tonne

1

4.6

2

7

3

2

4

1

5

5.3

6

6.5

7

8

8

21

9

0.2

10

3

 

15. What is meant by:

  • The lag
  • The geostatistical variance
  • The semi-variance
  • The semi-variogram
  • The sill
  • The Nugget effect
  • The range

16. Using the method of polygons, determine the average seam thickness and tonnage represented by the following information if coal weighs 0.9 tonne/m3. Note surface is flat and top of coal seam for all boreholes is intersected at the same depth.

Property Coordinates

East

North

1000

1000

7000

1000

1000

7000

7000

7000 

 

Drill hole data

Drill hole

Seam thickness (m)

East Coordinate

North Coordinate

1

5

2000

1000

2

4.5

4000

1000

3

3.5

6000

1000

4

4

1000

3000

5

5

3000

3000

6

3.9

5000

3000

7

3.7

7000

3000

8

4.5

2000

5000

9

4.6

4000

5000

10

4.8

6000

5000

11

3.9

1000

7000

12

5.6

3000

7000

13

2.9

5000

7000

14

2.8

7000

7000

 

17.    What characteristics of an ore body, besides grade, could or should be treated using geostatistical methods?

18.    Give definitions for the following:

- Break-even cut-off grade 

-Geological cut-off grade 

- Incremental cut-off grade 

- Marginal cut-off grade 

- Optimal cut-off grade 

- Resource/reserve cut-off grade 

- Run of mine cut-off grade 

19.    Define the various categories of reserves and resources that can be employed under JORC.

20.    Detail any special requirements for reporting nuggetty gold deposits within the JORC Code?

21.    How does the JORC code deal with stockpiles, low grade mineralisation and tailings?

22.    Why do you need a mathematical expression to represent the experimental variogram?

23.    What is meant by covariance?

24.    What type of information concerning the deposit is provided by a variogram?

25.    Use the method of polygons to determine the average ore grade and tonnage represented by the information on the next page if the cut-off grade is 2.5% and the ore has a density of 2.5 tonnes/m3.

26.    What would be the impact on the answer to question 25 if the cut=off grade is increased to 3%?

 

Drill hole id number

Collar elevation (m)

Easting coordinate (m)

Northing coordinate (m)

Depth to mineralised zone

(m)

1

1000

1000

1000

100

2

1050

1500

1000

150

3

1060

2000

1000

160

4

1010

2500

1000

110

5

1020

1000

1500

120

6

1070

1500

1500

170

7

1050

2000

1500

150

8

1000

2500

1500

100

9

1040

1000

2000

140

10

1020

1500

2000

120

11

1000

2000

2000

100

12

1070

2500

2000

170

13

1040

1000

2500

140

14

1010

1500

2500

110

15

1020

2000

2500

120

16

1000

2500

2500

100

 

 

 

Incremental sequence of samples taken from the mineralised zone

 

Hole id #

10m

15m

20m

10m

5m

10m

5m

20m

Sample

Grades

In %

1

3

2

2.5

3.5

3.8

3

1.7

1.6

2

3.5

3

2.5

2

2.5

3

2

1.5

3

4

4.2

4.4

4.5

4

3.5

2

1.6

4

3.2

2.7

2.5

3.2

3

2.5

1.5

1.4

5

4

3.5

2

2.2

2

1.7

1.6

1.5

6

3.2

2.8

3

3

2.5

2

2.2

1.4

7

4

3.5

2.2

2

2

1.6

1.5

1.2

8

3.5

3

2.5

2

2.5

3

2

1.5

9

4

3.6

3.2

3.4

3.1

2.6

1.6

1.2

10

3.7

3.8

3.5

3.4

2.7

2.3

1.7

1.4

11

3.2

3

2.8

2.6

2.4

2

1.9

1.5

12

3.8

3.9

4.2

4.1

3.4

2.7

1.5

1.2

13

3.8

3.2

3

3.4

2.4

1.7

1.5

1.5

14

4.3

4

4.1

3.4

2.7

2.4

2

1.2

15

4

3.8

2.7

3.2

2.6

1.6

1.4

1.1

16

3.6

3

3.1

3.1

2.2

2

1.7

1.4

 

North Boundary of the property 2500mN

South Bindery of the property 1000mN

East Boundary of the property 2500mE

West Boundary of the property1000mE School of Engineering and Information Technology

27.

1.               The table below shows the Copper ore grade results from a core drilling program undertaken on a regular 100m x 100m grid.

 

 

 

Copper ore % Cu at coordinate values

 

 

 

 

 

 

Easting Coordinate (m)

 

 

 

 

 

0

100

200

300

400

500

600

700

800

900

Text Box: Northing coordinate (m)

0

0.50

0.55

0.60

0.70

0.73

0.83

0.74

0.52

0.5

0.5

100

0.72

0.74

0.75

0.73

0.72

0.83

0.79

0.72

0.70

0.70

200

0.72

0.82

0.83

0.82

0.81

0.83

0.75

0.71

0.71

0

300

0.71

0.71

0.69

0.90

0.91

0.81

0.82

0.83

0.81

0.71

400

0.82

0.84

0.81

0.83

0.83

0.82

0.82

0.81

0.81

0.71

500

0.82

0.91

0.82

0.83

0.82

0.82

0.81

0.81

0.71

0.71

600

0.54

0.64

0.65

0.72

0.69

0.63

0.71

0.72

0.75

0.80

700

0.70

0.71

0.78

0.79

0.65

0.66

0.67

0.65

0.71

0.71

800

0.71

0.72

0.68

0.85

0.84

0.80

0.81

0.80

0.81

0.80

900

0.70

0.81

0.84

0.78

0.80

0.81

0.81

0.81

0.70

0.70

 

Undertake classical statistics on this data set, calculating the mean, variance and standard deviation.

2.               Using the data from question 21, determine experimental variograms in the west to east and north to south directions.

3.               Use ordinary kriging to estimate the grade at the location 475m East, 350m North.

Reference no: EM131002847

Questions Cloud

You are a department head at a large company : Persuading Employees that a Security Camera Is Necessary (Persuasive Message) You are a department head at a large company. To save money, your company orders office supplies in bulk. Each department then gets its allotment of supplies, which are kep..
What were the findings of the study : For assistance on determining what constitutes a professional peer-reviewed resource, contact your facilitator.
Does the change in discount rate create a gain : Assume the magnitude of the change is $13 million. Prepare the appropriate journal entry to record any 2011 gain or loss. If Patel prepares its financial statements according to U.S. GAAP, how will the company report the gain or loss?
What mass of water be allowed to come to thermal equilibrium : What mass of water at 28.0oC must be allowed to come to thermal equilibrium with a 2.07-kg cube of aluminum initially at 1.50 x 102oC to lower the temperature of the aluminum to 63.9oC? Assume any water turned to steam subsequently recondenses.
Process of exploration project to mining operation : Describe the process of exploration project to mining operation with reference to the ore resource/reserve estimation process.
Calculate the moment of inertia with respect to an axis : The masses are Q=0.400 kg, R=0.700 kg, and S=0.800 kg. Calculate the moment of inertia (of the 3 masses) with respect to an axis perpendicular to the xy plane and passing through x=0 and y=-2. [Since the masses are of small size, you can neglect t..
What amount will beale report in its 2011 balance sheet : What amount will Beale report in its 2011 balance sheet as a net pension asset or net pension liability for the funded status of the plan?
What is the current yield of the bond : What is the current yield of the bond? What is the total purchase price of the bonds? If Emerson sold the bonds on August 1 for $109.50, what are the proceeds from the sale?
What are rationale transfer of technolog : Question: what are rationale transfer of technology?

Reviews

Write a Review

Other Engineering Questions & Answers

  Development of a new complex system

List four pros and cons of incorporating some of the latest technology into the development of a new complex system. Give a specific example of each.

  Average radius of the pipe

Then they release a dye in the water at point A and find that it takes 88.8s to reach point B. What is the average radius of the pipe within thehill?

  Part iusing the data provided on the webvista site in the

part iusing the data provided on the webvista site in the file marked vdw.txt try to develop a mathematical equation

  Introduction to udl

Introduction to UDL

  Prepare a report on sensors in the multi pump system

Prepare a report on Sensors in the Multi Pump System - summary should state the purpose of the paper.

  Which car was going faster

Each driver claimed that he was going at the speed limit of 30 mi/h and that he tried to slow down but couldn't avoid the crash because the other driver was going a lot faster. Knowing that the weights of cars A and B were 3600 lb and 2800 lb, res..

  Assume that you are managing a design project which will

imagine you are managing a design project that will create an interface for automobile mechanics. the interface would

  Represents the second highest overhead

For most organizations, the cost of built space represents the second highest overhead (OpEx) after staff costs. From critical consideration of the relevant research literature, your experience, and best practice in space management, consider the ..

  Hydrogen storage and delivery system for automotive

You have been asked by your supervisor, the Director of Engineering Development, to explore the possibility of using a hydrogen fuel cell in place of the batteries in an electric vehicle.

  Problem on a network by drawing nodes

Express the above problem on a network by drawing nodes, arcs, determining node values, arc costs, arc capacities if any, such that no node has a capacity restriction associated with it and no node has a cost for using the node

  Explain the queueing system at dino-ville airport

Explain the queueing system at Dino-ville Airport by defining the customers, arrival rate, server, service rate and use Kendall's notation to define the queueing system.

  Calculate different measures of performance

Calculate different measures of performance (L, Lc, W, WQ), when you do not buy any additional grinders. That is, when you have a single grinder. Also, calculate the cost per minute of the system with a single grinder.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd