Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Create a schedule for the Storage Building to include all areas of work (the entire project) and complete the CPM Activity Data Sheet included in theCPM handout. The schedule is to have a minimum of 25 activities. The Owner has defined in the contract documents that the contractor will be allowed a total duration (from Notice-to-Proceed to Substantial Completion) of 250 days (so your schedule should be slightlyless than or equal to 250 days).
The schedule can be developed either by hand or using scheduling software (Microsoft Project, Primavera SureTrak, etc.), just as long as the Activity Data Sheet is completed. (Hint: Project and Suretrak will automatically create a network diagram once bar chart information has been input).
why is wood more common in residential construction in the US and concrete more common in commercial construction
A steel cylinder initially contains nitrogen gas at 200kPa and 25oC. the cylinder is connected to a suply line containing nitrogen at 800kPa and 25oC. A valve is opened, allowing nitrogen to flow into the cylinder until the pressure reaches 800kPa. T..
A truck is traveling down a road with a 3-percent grade at a speed of 55 mi/h when the brakes are applied. Knowing the coefficients of friction between the load and the flatbed trailer (us= 0.40) and (uk= 0.35)
A rectangular tank 2.0m wide, 4m long, and 2m deep contains water to a depth of 1.0m It is accelerated horizontally at 3m/s^2 in the x direction.
A completely mixed continous bioreactor used for growing oenicilin operates at a zero orer system. The input glucose is converted into various organic yeats. the flow rate ti this system is 20 liters per minute and the conversin rate is 4 mg/(min-..
What are the basic assumptions of the 'traffic flow model' and 'capacity model' used in signal timing design. Discuss.
From a photograph one observes that on a level section of highway 10% of the vehicles are trucks, 90% are cars, and that there are 50 vehicles per mile of highway. The trucks travel at 40 mph,
A simply supported beam carries with a span of 7.5 m carries a uniformly distributed load of 25 N/mm. if the maximum allowed deflection of the beam is 1/325 of its span, detemine the cross-sectional dimensions of the beam. assume the beam has a recta..
The horizontal motion of plunger and shaft is arrested by resistance of the attached disk which moves through the oil bath. If the velocity of plunger is v.
Carbon dioxide flows in a 75 mm diameter PVC pipe at 0.014 kg/s at a pressure of 345 kN/m^2/s abs and a temperature of 10 degrees C. Calculate the head loss in 500 m of pipe.
This project concerns design of a one-story parking garage in a 90x120-foot land in a North Chicago suburb (Cook County). Cars will be using both the ground level and the roof. The suggested design for the roof is a series of simply-supported girder..
A solid ball starts to roll up a hill with an initial velocity of 50m/s. The ball has a mass of 20 Kg with a 0.75 m radius. How high did the ball roll before it momentarily stopped
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd