Problem on packer manufacturing company

Assignment Help Managerial Accounting
Reference no: EM13343186

Problem- Packer Manufacturing Company:

Production and cost data for the month of February for Process A of the Packer manufacturing Company follow:

Units in process, February 1

(100% complete with respect to materials;

25% complete with respect to conversion cost) ... ?,???

New units started in process........................... 18,000

Units completed......................................... 16,000

Units in process, February 28

(100% complete with respect to materials;

1/3 complete with respect to conversion cost)...... 6,000

Work in process inventory, February 1:

Materials................................................. $2,000

Conversion.............................................. $20,000

Cost incurred in February:

Materials issued........................................ $8,560

Conversion.............................................. $21,500

The company uses the weighted-average cost method in its process costing system.

Required:

1. Calculate the equivalent units and cost per equivalent unit for February for materials and for conversion costs. (Carry calculations out to the nearest tenth of a cent.)

2. Determine the cost transferred to finished goods.

3. Determine the amount of cost that should be assigned to the ending work in process.

4. Do a cost reconciliation report.

 

Reference no: EM13343186

Questions Cloud

Calculate the degree of operating leverage and margin : Calculate the Degree of Operating Leverage and Margin of Safety where referenced in the answer template.
How much thermal energy is created : A 900N crate slides 12m down a ramp that makes an angle of 40 ? with the horizontal. how much thermal energy is created
What is the electrons potential energy : In a semiclassical model of the hydrogen atom, the electron orbits the proton at a distance of 0.053 nm. What is the electron's potential energy
Explain change in volume or amount of gas : Using the same sample of gas (P 1= 795 torr , T 1 = 37 C ), we wish to change the pressure to 7950 torr with no accompanying change in volume or amount of gas. What temperature T 1, in Celsius, is needed to reach this pressure
Problem on packer manufacturing company : Production and cost data for the month of February for Process A of the Packer manufacturing Company follow.
Bond issue and first semiannual interest payment : Prepare an amortization table through 3 interest periods for this bond issue and first semiannual interest payment, including amortization of discount. Round to nearest dollar.
Calculate the average exhaust speed of the engine : A model rocket engine has an average thrust of 5.26 N. It has an initial mass of 24.9 g, which includes fuel mass of 12.2 g. What is the average exhaust speed of the engine
Explain what will happen to the volume of the gas : Consider a gas in a container with an initial pressure, temperature, and volume. What will happen to the volume of the gas if the number of moles are increased 6 times (6x), the pressure is quadrupled and the temperature is tripled
Problem on journal entries larney corporation : Raw materials that cost $68,200 are withdrawn from the storeroom for use in the Mixing Department. Direct materials amounted to 75%, with the balance classified as indirect materials.

Reviews

Write a Review

Managerial Accounting Questions & Answers

  Manage budgets and financial plans

Explain the budgeting process and its importance to a business, identifying the components of different budgets, forecast estimates for inclusion in the budgets.

  Prepare a retained earnings statement

Prepare a retained earnings statement for the year and Prepare a stockholders' equity section of given case.

  Prepare a master budget for the three-month period

Prepare a master budget for the three-month period.

  Construct the companys direct labor budget

Construct the company's direct labor budget for the upcoming fiscal year, assuming that the direct labor workforce is adjusted each quarter to match the number of hours required to produce the forecasted number of units produced.

  Evaluate the predetermined overhead rate

Evaluate the Predetermined Overhead Rate

  Determine the company''s bid

Determine the company's bid if activity-based costing is used and the bid is based upon full manufacturing cost plus 30 percent.

  Compute the pool rates for the different activities

Complete the schedule to compute the pool rates for the different activities.

  Prepare Company financial statements

Prepare Company financial statements

  Prepare an analysis of terracycles

This individual assignment is based on the TerraCycle Inc.

  Discuss the ethical issues

Discuss the ethical issues

  Political resources in emerging markets

Calculate the GDP in Income Approach  and Expenditure Approach

  Management accounting - ehsan electronics company

A new plant accountant suggested that the company may be able to assign support costs to products more accurately by using an activity based costing system that relies on a separate rate for each manufacturing activity that causes support costs.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd