Problem- Packer Manufacturing Company:
Production and cost data for the month of February for Process A of the Packer manufacturing Company follow:
Units in process, February 1
(100% complete with respect to materials;
25% complete with respect to conversion cost) ... ?,???
New units started in process........................... 18,000
Units completed......................................... 16,000
Units in process, February 28
(100% complete with respect to materials;
1/3 complete with respect to conversion cost)...... 6,000
Work in process inventory, February 1:
Materials................................................. $2,000
Conversion.............................................. $20,000
Cost incurred in February:
Materials issued........................................ $8,560
Conversion.............................................. $21,500
The company uses the weighted-average cost method in its process costing system.
Required:
1. Calculate the equivalent units and cost per equivalent unit for February for materials and for conversion costs. (Carry calculations out to the nearest tenth of a cent.)
2. Determine the cost transferred to finished goods.
3. Determine the amount of cost that should be assigned to the ending work in process.
4. Do a cost reconciliation report.
Calculate the degree of operating leverage and margin
: Calculate the Degree of Operating Leverage and Margin of Safety where referenced in the answer template.
|
How much thermal energy is created
: A 900N crate slides 12m down a ramp that makes an angle of 40 ? with the horizontal. how much thermal energy is created
|
What is the electrons potential energy
: In a semiclassical model of the hydrogen atom, the electron orbits the proton at a distance of 0.053 nm. What is the electron's potential energy
|
Explain change in volume or amount of gas
: Using the same sample of gas (P 1= 795 torr , T 1 = 37 C ), we wish to change the pressure to 7950 torr with no accompanying change in volume or amount of gas. What temperature T 1, in Celsius, is needed to reach this pressure
|
Problem on packer manufacturing company
: Production and cost data for the month of February for Process A of the Packer manufacturing Company follow.
|
Bond issue and first semiannual interest payment
: Prepare an amortization table through 3 interest periods for this bond issue and first semiannual interest payment, including amortization of discount. Round to nearest dollar.
|
Calculate the average exhaust speed of the engine
: A model rocket engine has an average thrust of 5.26 N. It has an initial mass of 24.9 g, which includes fuel mass of 12.2 g. What is the average exhaust speed of the engine
|
Explain what will happen to the volume of the gas
: Consider a gas in a container with an initial pressure, temperature, and volume. What will happen to the volume of the gas if the number of moles are increased 6 times (6x), the pressure is quadrupled and the temperature is tripled
|
Problem on journal entries larney corporation
: Raw materials that cost $68,200 are withdrawn from the storeroom for use in the Mixing Department. Direct materials amounted to 75%, with the balance classified as indirect materials.
|