Question 1                                                                                                                                          

A heuristic solution is

Question 2                                                                                                                                   

How many decision variables are there in a transportation problem which has 5 supply points and 4 demand points?

Question 3                                                                                                                                     

 The following questions are based on this problem and accompanying Excel windows.

Jones Furniture Company produces beds and desks for college students. The production process requires carpentry and varnishing. Each bed requires 6 hours of carpentry and 4 hour of varnishing. Each desk requires 4 hours of carpentry and 8 hours of varnishing. There are 36 hours of carpentry time and 40 hours of varnishing time available. Beds generate $30 of profit and desks generate $40 of profit. Demand for desks is limited, so at most 8 will be produced.

Let          X1 = Number of Beds to produce

                X2 = Number of Desks to produce

The LP model for the problem is

MAX:

30 X1 + 40 X2

Subject to:

6 X1 + 4 X2£ 36 (carpentry)

 

4 X1 + 8 X2£ 40 (varnishing)

 

X2£ 8 (demand for desks)

 

X1, X2³ 0

 

A

B

C

D

E

1

 

Jones Furniture

 

 

2

 

 

 

 

 

3

 

Beds

Desks

 

 

4

Number to make:

 

 

 

Total Profit:

5

Unit profit:

30

40

 

 

6

 

 

 

 

 

7

Constraints:

 

 

Used

Available

8

Carpentry

6

4

 

36

9

Varnishing

4

8

 

40

10

Desk demand

 

1

 

8

           

Refer to Exhibit 3.1. Which cells should be changing cells in this problem?

Question 4                                                                                                                               

How many constraints are there in a transportation problem which has 5 supply points and 4 demand points? (ignore the non-negativity constraints)

Question 5                                                                                                                             

The following questions are based on this problem and accompanying Excel windows.

ones Furniture Company produces beds and desks for college students. The production process requires carpentry and varnishing. Each bed requires 6 hours of carpentry and 4 hour of varnishing. Each desk requires 4 hours of carpentry and 8 hours of varnishing. There are 36 hours of carpentry time and 40 hours of varnishing time available. Beds generate $30 of profit and desks generate $40 of profit. Demand for desks is limited, so at most 8 will be produced.

Let          X1 = Number of Beds to produce

                X2 = Number of Desks to produce

The LP model for the problem is

MAX:

30 X1 + 40 X2

Subject to:

6 X1 + 4 X2£ 36 (carpentry)

 

4 X1 + 8 X2£ 40 (varnishing)

 

X2£ 8 (demand for desks)

 

X1, X2³ 0

   

 

A

B

C

D

E

1

 

Jones Furniture

 

 

2

 

 

 

 

 

3

 

Beds

Desks

 

 

4

Number to make:

 

 

 

Total Profit:

5

Unit profit:

30

40

 

 

6

 

 

 

 

 

7

Constraints:

 

 

Used

Available

8

Carpentry

6

4

 

36

9

Varnishing

4

8

 

40

10

Desk demand

 

1

 

8

           

Which cells should be the constraint cells in this problem?

Question 6                                                                                                                         

The following questions are based on this problem and accompanying Excel windows.The Byte computer company produces two models of computers, Plain and Fancy. It wants to plan how many computers to produce next month to maximize profits. Producing these computers requires wiring, assembly and inspection time. Each computer produces a certain level of profits but faces only a limited demand. There are also a limited number of wiring, assembly and inspection hours available in each month. The data for this problem is summarized in the following table.



Computer

Model



Profit per

Model ($)

Maximum

demand for

product



Wiring Hours

Required

Assembly

Hours

Required

Inspection

Hours

Required

Plain

30

80

.4

.5

.2

Fancy

40

90

.5

.4

.3

 

 

Hours Available

50

50

22

           

Let

X1 = Number of Plain computers to produce

 

X2 = Number of Fancy computers to produce

 

 

MAX:

30 X1 + 40 X2

Subject to:

.4 X1 + .5 X2£ 50 (wiring hours)

 

.5 X1 + .4 X2£ 50 (assembly hours)

 

.2 X1 + .2 X2£ 22 (inspection hours)

 

X1£ 80 (Plain computers demand)

 

X2£ 90 (Fancy computers demand)

 

X1, X2³ 0

   

 

A

B

C

D

E

1

 

Byte Computer Company

 

 

2

 

 

 

 

 

3

 

Plain

Fancy

 

 

4

Number to make:

 

 

 

Total Profit:

5

Unit profit:

30

40

 

 

6

 

 

 

 

 

7

Constraints:

 

 

Used

Available

8

Wiring

0.4

0.5

 

50

9

Assembly

0.5

0.4

 

50

10

Inspection

0.2

0.3

 

22

11

Plain Demand

1

 

 

80

12

Fancy Demand

 

1

 

90

           

Which cells should be the constraint cells in this problem?

Question 7                                                                                                                            

Numeric constants should be

Question 8                                                                                                                                   

What is the significance of an absolute cell reference in Excel?

Question 9                                                                                                                                     

An LP problem with a feasible region will have

Question 10                                                                                                                                  

Problems which have only integer solutions are called

Question 11                                                                                                  

The following questions are based on this problem and accompanying Excel windows.Jones Furniture Company produces beds and desks for college students. The production process requires carpentry and varnishing. Each bed requires 6 hours of carpentry and 4 hour of varnishing. Each desk requires 4 hours of carpentry and 8 hours of varnishing. There are 36 hours of carpentry time and 40 hours of varnishing time available. Beds generate $30 of profit and desks generate $40 of profit. Demand for desks is limited, so at most 8 will be produced.

Let

X1 = Number of Beds to produce

 

X2 = Number of Desks to produce

   

The LP model for the problem is

MAX:

30 X1 + 40 X2

Subject to:

6 X1 + 4 X2£ 36 (carpentry)

 

4 X1 + 8 X2£ 40 (varnishing)

 

X2£ 8 (demand for desks)

 

X1, X2³ 0

   

 

A

B

C

D

E

1

 

Jones Furniture

 

 

2

 

 

 

 

 

3

 

Beds

Desks

 

 

4

Number to make:

 

 

 

Total Profit:

5

Unit profit:

30

40

 

 

6

 

 

 

 

 

7

Constraints:

 

 

Used

Available

8

Carpentry

6

4

 

36

9

Varnishing

4

8

 

40

10

Desk demand

 

1

 

8

           

What formula should be entered in cell D8 in the accompanying Excel spreadsheet to compute the amount of carpentry used?

Question 12                                                                                                                                    

The following questions are based on this problem and accompanying Excel windows.Jones Furniture Company produces beds and desks for college students. The production process requires carpentry and varnishing. Each bed requires 6 hours of carpentry and 4 hour of varnishing. Each desk requires 4 hours of carpentry and 8 hours of varnishing. There are 36 hours of carpentry time and 40 hours of varnishing time available. Beds generate $30 of profit and desks generate $40 of profit. Demand for desks is limited, so at most 8 will be produced.

Let

X1 = Number of Beds to produce

 

X2 = Number of Desks to produce

   

The LP model for the problem is

MAX:

30 X1 + 40 X2

Subject to:

6 X1 + 4 X2£ 36 (carpentry)

 

4 X1 + 8 X2£ 40 (varnishing)

 

X2£ 8 (demand for desks)

 

X1, X2³ 0

   

 

A

B

C

D

E

1

 

Jones Furniture

 

 

2

 

 

 

 

 

3

 

Beds

Desks

 

 

4

Number to make:

 

 

 

Total Profit:

5

Unit profit:

30

40

 

 

6

 

 

 

 

 

7

Constraints:

 

 

Used

Available

8

Carpentry

6

4

 

36

9

Varnishing

4

8

 

40

10

Desk demand

 

1

 

8

           

What formula should be entered in cell E5 in the accompanying Excel spreadsheet to compute total profit?

Question 13                                                                                                     

The following questions are based on this problem and accompanying Excel windows.Jones Furniture Company produces beds and desks for college students. The production process requires carpentry and varnishing. Each bed requires 6 hours of carpentry and 4 hour of varnishing. Each desk requires 4 hours of carpentry and 8 hours of varnishing. There are 36 hours of carpentry time and 40 hours of varnishing time available. Beds generate $30 of profit and desks generate $40 of profit. Demand for desks is limited, so at most 8 will be produced.

Let

X1 = Number of Beds to produce

 

X2 = Number of Desks to produce

   

The LP model for the problem is

MAX:

30 X1 + 40 X2

Subject to:

6 X1 + 4 X2£ 36 (carpentry)

 

4 X1 + 8 X2£ 40 (varnishing)

 

X2£ 8 (demand for desks)

 

X1, X2³ 0

   

 

A

B

C

D

E

1

 

Jones Furniture

 

 

2

 

 

 

 

 

3

 

Beds

Desks

 

 

4

Number to make:

 

 

 

Total Profit:

5

Unit profit:

30

40

 

 

6

 

 

 

 

 

7

Constraints:

 

 

Used

Available

8

Carpentry

6

4

 

36

9

Varnishing

4

8

 

40

10

Desk demand

 

1

 

8

           

Which of the following statements represent the carpentry, varnishing and limited demand for desks constraints?

Question 14                                                                                                                            

The following questions are based on this problem and accompanying Excel windows.

The Byte computer company produces two models of computers, Plain and Fancy. It wants to plan how many computers to produce next month to maximize profits. Producing these computers requires wiring, assembly and inspection time. Each computer produces a certain level of profits but faces only a limited demand. There are also a limited number of wiring, assembly and inspection hours available in each month. The data for this problem is summarized in the following table.

Let

X1 = Number of Beds to produce

 

X2 = Number of Desks to produce

   

The LP model for the problem is

MAX:

30 X1 + 40 X2

Subject to:

6 X1 + 4 X2£ 36 (carpentry)

 

4 X1 + 8 X2£ 40 (varnishing)

 

X2£ 8 (demand for desks)

 

X1, X2³ 0

   

 

A

B

C

D

E

1

 

Jones Furniture

 

 

2

 

 

 

 

 

3

 

Beds

Desks

 

 

4

Number to make:

 

 

 

Total Profit:

5

Unit profit:

30

40

 

 

6

 

 

 

 

 

7

Constraints:

 

 

Used

Available

8

Carpentry

6

4

 

36

9

Varnishing

4

8

 

40

10

Desk demand

 

1

 

8

           

Which of the following statements represent the carpentry, varnishing and limited demand for desks constraints?

Question 15                                                                                                                                 

The constraints X1³ 0 and X2³ 0 are referred to as

Question 16                                                                                                                               

The following questions are based on this problem and accompanying Excel windows.

The Byte computer company produces two models of computers, Plain and Fancy. It wants to plan how many computers to produce next month to maximize profits. Producing these computers requires wiring, assembly and inspection time. Each computer produces a certain level of profits but faces only a limited demand. There are also a limited number of wiring, assembly and inspection hours available in each month. The data for this problem is summarized in the following table.



Computer

Model



Profit per

Model ($)

Maximum

demand for

product



Wiring Hours

Required

Assembly

Hours

Required

Inspection

Hours

Required

Plain

30

80

.4

.5

.2

Fancy

40

90

.5

.4

.3

 

 

Hours Available

50

50

22

           

Let

X1 = Number of Plain computers to produce

 

X2 = Number of Fancy computers to produce

 

 

MAX:

30 X1 + 40 X2

Subject to:

.4 X1 + .5 X2£ 50 (wiring hours)

 

.5 X1 + .4 X2£ 50 (assembly hours)

 

.2 X1 + .2 X2£ 22 (inspection hours)

 

X1£ 80 (Plain computers demand)

 

X2£ 90 (Fancy computers demand)

 

X1, X2³ 0

   

 

A

B

C

D

E

1

 

Byte Computer Company

 

 

2

 

 

 

 

 

3

 

Plain

Fancy

 

 

4

Number to make:

 

 

 

Total Profit:

5

Unit profit:

30

40

 

 

6

 

 

 

 

 

7

Constraints:

 

 

Used

Available

8

Wiring

0.4

0.5

 

50

9

Assembly

0.5

0.4

 

50

10

Inspection

0.2

0.3

 

22

11

Plain Demand

1

 

 

80

12

Fancy Demand

 

1

 

90

           

What formula should be entered in cell E5 in the accompanying Excel spreadsheet to compute total profit?

Question 17                                                                                                                                  

The following questions are based on this problem and accompanying Excel windows.

The Byte computer company produces two models of computers, Plain and Fancy. It wants to plan how many computers to produce next month to maximize profits. Producing these computers requires wiring, assembly and inspection time. Each computer produces a certain level of profits but faces only a limited demand. There are also a limited number of wiring, assembly and inspection hours available in each month. The data for this problem is summarized in the following table.



Computer

Model



Profit per

Model ($)

Maximum

demand for

product



Wiring Hours

Required

Assembly

Hours

Required

Inspection

Hours

Required

Plain

30

80

.4

.5

.2

Fancy

40

90

.5

.4

.3

 

 

Hours Available

50

50

22

           

Let

X1 = Number of Plain computers to produce

 

X2 = Number of Fancy computers to produce

 

 

MAX:

30 X1 + 40 X2

Subject to:

.4 X1 + .5 X2£ 50 (wiring hours)

 

.5 X1 + .4 X2£ 50 (assembly hours)

 

.2 X1 + .2 X2£ 22 (inspection hours)

 

X1£ 80 (Plain computers demand)

 

X2£ 90 (Fancy computers demand)

 

X1, X2³ 0

   

 

A

B

C

D

E

1

 

Byte Computer Company

 

 

2

 

 

 

 

 

3

 

Plain

Fancy

 

 

4

Number to make:

 

 

 

Total Profit:

5

Unit profit:

30

40

 

 

6

 

 

 

 

 

7

Constraints:

 

 

Used

Available

8

Wiring

0.4

0.5

 

50

9

Assembly

0.5

0.4

 

50

10

Inspection

0.2

0.3

 

22

11

Plain Demand

1

 

 

80

12

Fancy Demand

 

1

 

90

           

What formula should be entered in cell D8 in the accompanying Excel spreadsheet to compute the amount of wiring used?

Question 18                                                                                                                                   

Models which are setup in an intuitively appealing, logical layout tend to be the most

Question 19                                                                                                                                     

Which command is equivalent to =SUMPRODUCT(A1:A3,B1:B3)?

Question 20                                                                                                                           

What does the Excel =SUMPRODUCT(A1:A5,C6;C10) command do?

Reference no: EM13951368

Questions Cloud

How many hours are you scheduled to work each week : How many hours are you scheduled to work each week? Answer to the nearest hour.  How applicable is this work experience to your future employment goals?
Explain the basis for your answer : Which variance(s) would you investigate? Explain the basis for your answer.
Critical thinking what crime in the cyber realm : Kizza (2014) addressed network attacks and intrusions broadly as "cybercrime" and attributed them largely to moral and ethical deficiencies of the perpetrators. Lessig (2006) approached law in the network largely in terms of computer "code" that d..
Define an information system and types of information system : Provide three examples of information systems used in real life (from your experience or from the sites you visited) and tell what type of information systems they (for example, an information system used by a cashier in a grocery store is a trans..
Problem and accompanying excel windows : Jones Furniture Company produces beds and desks for college students. The production process requires carpentry and varnishing. Each bed requires 6 hours of carpentry and 4 hour of varnishing.
Perform the bea at what point does breakeven occur : calculate the net present value of these costs and benefits also calculate the overall return on investment of the project and then present a breakeven analysis , perform the BEA at what point does breakeven occur?
Write an algorithm that gets as input three data values : Write an algorithm that gets as input three data valuesx,y, andz and outputs the average of these values if the value ofx is positive.
What is his weight at the surface of the earth : Four stars of different mass arrive on the Main Sequence of the Hertzsprung-Russell Diagram at the same time. Which star has a mass just about the same as the mass of the Sun?
Discuss the importance of internal customer satisfaction. : IT infrastructure groups are often responsible for direct customer interaction and associated customer service. Note ways IT organizations can improve the quality and perception of their service

Reviews

Write a Review

Basic Computer Science Questions & Answers

  Learn the combined use of timer and the tracking of user

Lab 10 - The Student Game - Learn the Combined use of Timer and the tracking of user interactions Deliverables app.java, myJFrame.java, myJPanel.java, and other necessary Java files

  Print a header line with appropriate labels for each column

Print a header line with appropriate labels for each column. Format each data line to vertically align each column right-justified.

  Database redesign is working properly in redesign testing

To make sure that database redesign is working properly during redesign testing process, a means should be created to do which of the following?

  When the jmpc field in the microinstruction is enabled

Assume that when the JMPC field in the microinstruction is enabled (set), MBR is ORed with NEXT_ADDRESS to determine the address of the next microinstruction to be executed

  Write a php script that computes the total cost

Write a PHP script that computes the total cost of the ordered light bulbs from above after adding 6.2 percent sales tax. The program must inform the buyer of exactly what was ordered, in a table.

  Write program called guessing game generate random number

Write a program called Guessing Game that will generate a random number between 1 and 100. The program will tell the player if his/her guess is too high or too low and when it is correct and will continue until the player guesses the number or end..

  Classify computer systems according to capacity

Classify computer systems according to capacity. How they are different from computers according to the classification of technology. Provide comparative study also.

  List the sequence in which all constructors

list the sequence in which all constructors and destructors are called. Also, provide the explanation for why they are called in this sequence.

  A first order analog low pass butterworth filter

Need some help with this question, do not understand how to do it. A first order analog low pass Butterworth filter has a -3dB frequency of 2.5kHz and a DC gain of unity. a. Use a bilinear transformation to find a digital filter H(z) to match the an..

  Discuss the term scalability

Discuss the term scalability. What does it mean?Why is it an important network design goal?What are some challenges designers face when designing for scalability.

  Simulating problem for arriving for lunch at restaurant

Customers for lunch arrive into a restaurant at Exponential rate of 10 per hour for seated service and at  Exponential rate of 15 per hour for buffet. Simulate this problem for 8 hours using minutes as the basic time units.

  Working for country club with thousands of members

Working for country club with thousands of members

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd