Reference no: EM132839997
PRJ5001 Project Management Profession - Asia Pacific International College
Chosen topic -Burj khalifa
Assessment Detail
This assessment is designed to assess your technical skills in developing and communicating a project effectively. You required to work individually, select a project case and you are required to investigate, analyse and report on the correct initiation of the project by applying PMBOK methodology The group needs to select an industrial project from any domain (IT, construction, banking), study the project details and prepare and present the assessment. The Chunnel Tunnel, Melbourne's Metro Tunnel, Bhuj Khalifa, Queensland Health Payroll are examples of such projects. Links to real-life projects: (those are mainly infrastructure and construction project, it is not compulsory to use it as your case, you can select a project from your area of expertise).
• The Australian Government's Department Infrastructure and Transport. National Infrastructure Construction Schedule
• Transport for UNSW
• City of Sydney, Changing urban precincts
The report must contain the following project documents:
• Project background
• Draft business case
• Draft stakeholder register
• Draft project charter
• Organisational structure
• Design and application of Balanced Score Card
• Recommendations for project governance
For successful completion of this assessment, you are required to study the material provided (lecture slides, tutorials, and reading materials) and engage in the unit's activities. Students are expected to discuss their work with tutor / lecturer and to seek support. Submission of the MS-Word file and the MS-PowerPoint file needs to be then made into Canvas before the stipulated deadline.
Referencing style- Harvard
Attachment:- Project Management Profession.rar