1. Calendar-based planning is orchestrated mainly around:
Knowledge of task completion criteria.
Technical events and associated tasks.
Network charts linking task and events by time.
Time duration and calendar dates.
2. Which of the following best describes the primary purpose of the Requirements Analysis Process?
To analyze and decompose user needs and preliminary technical requirements into a functional architecture and system performance specification that contains a complete set of verifiable, achievable, and clear system-level requirements.
To logically implement a product from related subsystem end products through recursive application detailed design techniques.
To integrate, verify, and validate end products satisfying Interface Control Documents and document a physical architecture that is traceable to user needs.
To realize products consistent with the Defense Acquisition Framework by validating the consistency of proposes solutions against JCIDS documents and cost, schedule, and performance objectives.