Reference no: EM131149892
Question:-(Approx. 6000 words)
Prepare the project proposal for a project of sufficient complexity and value that you are familiar with to highlight the costing approach and appraisal of the project. Your proposal should include:
1. A clear description of the project including the project charter with the project objectives
2. A clear presentation of the scope of the project including the work breakdown structure (WBS) of sufficient detail
3. A clear schedule for the project of sufficient detail to highlight the main milestones, the critical path, schedule constraints etc of the project.
4. A clear costing for the project highlighting the approaches used in estimating the cost of the various components of the project.
5. A clear budget for the project highlighting the contingencies applied and their reasons
6. A clear appraisal of the project highlighting the justification for the project. The appraisal should include some numeric models and should clearly highlight why the project should be accepted. The acceptance criteria chosen should also be demonstrated to be realistic and reasonable for the project and organization concerned.
7. In the above appraisal, the student should show that the risk to the costing estimates as well as any income stream (if any) have been taken into account and the project remains viable based on the probability of the risk assessed.
Assessed on the demonstration of their understanding of:
1. The overall project management processes
2. The concepts and tools of cost estimating and budgeting
3. The concepts and tools of cost analysis and appraisal of projects
4. The uncertainty and risk involved in projects
Examine the role of management as it relates to finance
: Examine the role of management as it relates to finance in a corporation. In your post, discuss the role of management by addressing the following prompts: Explain the various aspects of finance that management must understand
|
The armature of a variable-speed electric motor
: Find the speed range over which the amplitude of the fluctuating force transmitted to the foundation will be larger than the exciting force
|
Find the minimum static deflection of an isolator
: A dishwashing machine weighing 150 lb operates at 300 rpm. Find the minimum static deflection of an isolator that provides 60 percent isolation. Assume that the damping in the isolator is negligible.
|
What organizational change resulted from pressure for change
: What was the internal or external pressure that caused the change? Compare the driving force for the change to the specific types of pressures noted in your reading assignments. What organizational changes resulted from the pressure for change
|
Prepare the project proposal for a project
: Prepare the project proposal for a project of sufficient complexity and value that you are familiar with to highlight the costing approach.
|
Find a suitable viscously damped isolator
: the amplitude during start-up conditions should not exceed 20 mm; and (d) the force transmitted to the foundation should be less than 10,000 N.
|
Examine at least two characteristics of hyper-v
: Examine at least two characteristics of Hyper-V that you would consider highlighting in order to convince the business decision makers and entice them to approve the proposed change.
|
Occupational safety and health administration act
: Do some research with regards to the U.S. Occupational Safety and Health Administration's (OSHA) Act for compliance and standards which are typically handled within the Human Resources function, and address the following items: To what types of b..
|
Find the range of operating speeds of the compressor
: A compressor of mass 120 kg has a rotating unbalance of 0.2 kg-m. If an isolator of stiffness 0.5 MN/m and damping ratio 0.06 is used, find the range of operating speeds of the compressor over which the force transmitted to the foundation will be ..
|