Prepare schedules for project expenditure

Assignment Help Civil Engineering
Reference no: EM132639064

CPCCBC5002 Monitor costing systems on medium risecomplex building and construction projects

In this assessment you are required to demonstrate your ability to:

1. Identify and classify project costs
2. Prepare schedules for project expenditure
3. Prepare interim payment claims
4. Prepare and compare cash flow and payments using time risk and cost risk
5. Communicate with staff members

You are required to create a quick guide for your staff members to use to help them with the classification and identification of project costs

You may use whatever methods you like, including but not limited to checklists, process diagrams, step by step instructions or a combination of formats.

You want this guide to be one that can be used for any project, so it is to be generic and not tailored to a specific job:
Consider the following:
1. A how to guide for identifying costs
2. A guide for determining the correct cost centre
3. Instructions for how to conduct a risk assessment and how to interpret the outcome
4. Instructions on how to prepare interim payment claims
5. Instructions on how to prepare and compare cash flow and payments using time risk and cost risk
6. Business rules, legislative requirements, standards and codes that you expect your employees to adhere to.

In this assessment you are required to demonstrate your ability to:
1. Identify and classify project costs
2. Prepare schedules for project expenditure
3. Prepare interim payment claims
4. Prepare and compare cash flow and payments using time risk and cost risk
5. Communicate with staff members

You have decided to create a quick guide for staff members to use to help with the classification and identification of project costs.

You may use whatever methods you like, including but not limited to checklists, process diagrams, step by step instructions or a combination of formats.

Jot down some dot points on the following to help you put together the guide (this activity may be completed with a partner)

1. A how to guide for identifying costs

2. A guide for determining the correct cost centre

3. Instructions for how to conduct a risk assessment and how to interpret the outcome

4. Instructions on how to prepare interim payment claims

5. Instructions on how to prepare and compare cash flow and payments using time risk and cost risk

You want this guide to be one that can be used for any project, so it is to be generic and not tailored to a specific job

Attachment:- Practical Demonstration Project Costs.rar

Reference no: EM132639064

Questions Cloud

Make for the Alpha Company the General Journal entries : Alpha Company fiscal year-end is December 31. Use this information to make for the Alpha Company the General Journal entries (without explanation) for December
About responsibilities or changes due to covid : What was it about the lecturer that you found most interesting? What did you learn about their responsibilities or changes due to COVID
Make adjusting general journal entry for the fiscal year : Alpha Company had credits sales that amounted to $300,000. Make adjusting General Journal entry (without explanation) for the fiscal year
What is the intended market : Based on the information collected, do you feel it is a good idea to continue with the implementation of the business? Explain why or why not.
Prepare schedules for project expenditure : Prepare schedules for project expenditure and Prepare and compare cash flow and payments using time risk and cost risk - Communicate with staff members
The process of analyzing works from the humanities : You've explored the process of analyzing works from the humanities. You've also started conducting research on specific works for your project.
Make the General Journal entry for August : Alpha is certain that it will be unable to collect the $550. Use this information to make the General Journal entry (without explanation) for August 15
Leading change strategic plan : Analyze leadership and management roles in change management. Evaluate different change management models.
What amounts should be recorded : Alpha Company collected payment from Worldwide Express on July 21. What amounts should be recorded for the following accounts for the July 21 collection

Reviews

len2639064

9/21/2020 9:50:51 PM

When conducting the assignment, please refer to relvant regulations and codes in Australia.

Write a Review

Civil Engineering Questions & Answers

  Determine the force in member ac-fh and fg

determine the force in member AC, FH, and FG and indicate if the member is in tension or compression. List all zero force members.

  Construct the necessary operational and maintenance flows

Construct the necessary operational and maintenance flows, identify repair policies, and apply quantitative effectiveness factors as appropriate.

  Determine what will be the resultant water column height

A rigid open cylinder having an inside diameter of 15 mm contains a column of water 500 mm long at 20 degrees C. If a compressive force of 2 kN is applied to the top of the water column by a frictionless 15 mm piston

  Calculate the overflow rate and effulent weir loading

A wastewater treatment plant has two rectangular primary settling tanks, each 40 ft long, 12 ft wide, and 7 ft deep. The effulent weir length in each tank is 45 ft. The average daily wastewater flow is 387,000 gal.

  Determine the flow rate through pipe b

(i) Determine the flow rate through pipe B. Discard minor losses and assume the water temperature to be 150C. (ii) Show that the flow is fully rough and thus the friction factor is independent of Reynolds number.

  Determine the volume of soil that must be excavated

Soil have a void ratio of 0.68 as it exists in a borrow pit is to be excavated and transported to a fill site where it will be compacted to a void ratio of 0.45. The volume of fill required is 2500 m^3.

  Write expression for engineering strain associated with a

A piece of wire is stretched from length l1 to length l2 (step A), and then from length l2 to length l3 (step B). (i) Write down an expression for the engineering strain associated with step A.

  What is the net entropy change for the overall process

What is the pressure P2? What is the net entropy change for the overall process?

  How much can the company afford to spend per month

Wheeling-Pittsburgh Steel is investigating whether it should it should replace some of the basic oxygen furnace equipment now or wait to do it later. The cost later (i.e. 3 years from now) is estimated to be $1,700,000.

  National highway with four lane dual carriageway

It is proposed to construct a new National Highway with four lane dual carriageway. The initial traffic in the year of completion construction i 1100CVPD.

  What is the accuracy for each level run

Give the complete form of field notes, including the arithmetic check. If the average BS and FS distance is 50 m, what is the accuracy for each level run?

  What is the microstructure of normalised steel

What is the microstructure of normalised steel?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd