Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Prepare paper on Geotechnical Investigation into the Causes of Cracks in Building: A Case Study
The study examined the geotechnical properties of soil supporting Egbogha building that has been revealing deep cracks around its wall.
Table of contents
Abstract
INTRODUCTION
METHODOLOGYPreliminary survey, Sample Collection and Preparation
RESULTS AND DISCUSSIONGeotechnical Properties and Soil classification
CONCLUSION AND RECOMMENDATIONS
ACKNOWLEDGEMENTS
Verified Expert
The assignment is regarding the case study regarding the Geotechnical investigation into the causes and effects of the cracks in building. the area around the study was conducted is the Marlin Mine in Nigeria and the case study is of Dr. Egbogha Building, University of Ibadan, Nigeria. The report further clarified the potential causes of the damages that are the cracks in the buildings around the villages. The factors are human made as well as natural.
Assuming that the nominal value of the velocity is the value of 30 m/s, calculate the uncertainty in its determination.
Data obtained from aerial photography showed six vehicles on a 600 ft long section of road. Traffic data collected at the same time indicated an average time headway of 3.6 sec.
A 2000-lb wheel load is to be supported by aggregate over soil with a maximum bearing pressure of 1000 lb/sqft. What depth of aggregate is needed if the angle theta is 40 degrees
The 480-kg bent bar ABC of uniform cross section is supported by a pin at A and a vertical cable at C. Determine the pin reactions and the force in the cable.
A tensile load of 50 000 lb is applied to a metal bar with a 0.6x0.6 in cross section and a gage length of 2 in. Under this load the bar elastically deforms so that the gae length increases to 2.007 in
The lubbock board of city development has decided to ask the city council to construct a tunnel under the snowcapped mountain range east to downtown lubbock so that out of town visitors can reach historic prairie dog town.
A hollow circular shaft is loaded in pure torsion. Describe how the shear stress due to the applied torque varies on a cross section whose unit normal vector lies parallel to the long axis of the shaft.
The area of a parking lot is calculated to be 5,474 ft^2 with an estimated standard deviation of 2 ft^2. What is the maximum anticipated error? there is a 90% chance that the error range will be what?
A company produces two kinds of septic tanks: type A and type B. Each type B tank takes twice as long to produce as a type A tank. If it only produced type A tanks, the company has the time to produce a maximum of 2000 tanks per week. The supply of m..
If a SS concrete beam, prestressed with a force of 2500 kn,effective span = 10m. It carries a load of 40 kN/m, the central dip of the cable profile should be
The concrete cylinder 6 in x 12 in broke incompression at a load of 110000 lbs. Compute the crushing strength of concrete. Estimate the tensile strength and the modulus ofelasticity.
Suppose you are planning to use single sourcing and have narrowed down the choices to four suppliers A, B, C, and D. Your criteria for selection are price (min), company size in market capitalization in millions of dollars (max), and quality in a ..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd