Prepare functional specifications

Assignment Help Civil Engineering
Reference no: EM133710844

Manage civil works design processes

Assessment - Practical Tasks

Task 1 - Civil Works Design
You are required to undertake a civil construction design project as outlined below. Your Assessor will take the role of the client for the purposes of this assessment task.

Design Specifications

The Problem

You are a civil designer working for the state department of transportation. You have been assigned responsibility for the design of a truss bridge to carry a two-lane highway across the river valley shown below.

Design Objective

Satisfy all of the specifications listed below, while keeping the total cost of the project as low as possible.

Bridge Configuration
The bridge may cross the valley at any elevation from the high water level to 24 meters above the high water level.
If the elevation of the bridge is below 24 meters, excavation of the river banks will be required to achieve the correct highway elevation.
To provide clearance for overhead power lines (shown above), the highest point on the bridge may not exceed an elevation 32.5 meters above the high water level (8.5 meters above the top of the river banks).
The bridge may consist of either standard (simple supports) or (arch supports). If necessary, the bridge may also use one intermediate , located near the centre of the valley. If necessary, the bridge may also use cable , located 8 meters behind one or both abutments.
Each main truss can have no more than 100 and no more than 200 .
The bridge will have a flat, reinforced deck. Two types of concrete are available:

Medium-strength concrete requires a deck thickness of 23 centimetres (0.23 metres).
High-strength concrete requires a deck thickness of 15 centimetres (0.15 meter).
In either case, the deck will be supported by transverse spaced at 4 metre intervals. To accommodate these floor beams, your must have a row of joints spaced 4 meters apart at the level of the deck. These joints are created automatically when you begin a new design.
The bridge deck will be 10 meters wide, such that it can accommodate two lanes of traffic.
Member Properties

Materials. Each member of the truss will be made of either carbon steel, high-strength low-alloy steel, or quenched and tempered steel.
. The members of the truss can be either solid bars or hollow tubes. Both types of cross-sections are square.
Member Size. Both cross-sections are available in a variety of standard sizes.

Loads

The bridge must be capable of safely carrying the following loads:

Weight of the deck.
Weight of a 5-cm thick , which might be applied at some time in the future.
Weight of the steel floor beams and supplemental bracing members (assumed to be 12.0 applied at each deck-level joint).
Weight of the main trusses.
Either of two possible truck loadings:

Weight of one standard H25 truck loading per lane, including appropriate allowance for the dynamic effects of the moving load. (Since the bridge carries two lanes of traffic, each main truss must safely carry one H25 vehicle, placed anywhere along the length of the deck.)
Weight of a single 480 kN Permit Loading, including appropriate allowance for the dynamic effects of the moving load. (Since the Permit Loading is assumed to be cantered laterally, each main truss must safely carry one-half of the total vehicle weight, placed anywhere along the length of the deck.)
Structural Safety

The bridge will comply with the structural provisions of the state specified standards, to include:

Material densities
Load combinations
Tensile strength of members
Compressive strength of members

Cost

The cost of the design will be calculated using the following cost factors:

Material Cost:

Carbon steel bars - $4.50 per kilogram
Carbon steel tubes - $6.30 per kilogram
High-strength steel bars - $5.00 per kilogram
High-strength steel tubes - $7.00 per kilogram
Quenched and tempered steel bars - $5.55 per kilogram
Quenched and tempered steel tubes - $7.75 per kilogram

Connection Cost: $500.00 per joint
Product Cost: $1000.00 per product
Site Cost:

Reinforced concrete deck (medium strength) - $5,150 per 4-meter panel
Reinforced concrete deck (high strength) - $5,300 per 4-meter panel
Excavation - $1.00 per cubic meter (See the Site Design Wizard for excavation volume)
Supports (abutments and pier) - Cost varies (See the Site Design Wizard for specific values)
$6,000 per anchorage

Required:

Make a detailed list of all constraints and requirements to the bridge design.

Prepare functional specifications

Present at least 2 designs to meet the design specifications. The designs are to include, as relevant:

calculations, which may include:

loads
sheer forces
bending moments
stresses
construction materials and services quantities
construction cost estimates

recommended sizing of components
recommended materials
recommended reinforcement sizing and location
drawings
risk assessment of:

the existing conditions
the application of the design
maintainability of the works

health, safety and environmental requirements
contribution to ancillary documentation, which may include:

design notes
construction notes
supplementary drawings
input to the specifications

Note: The designs, and their development, should comply with relevant requirements including:
legislative, organizational and site requirements and procedures
manufacturer's guidelines and specifications
Australian standards
Code of practice
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation

 

Reference no: EM133710844

Questions Cloud

Address the proprietors concerns : A statement explaining the information in your report (i.e., numerical) Why the information is important to the business
What advice would you give to new students embarking : Discuss what you learned (specifically) and your key takeaways. What advice would you give to new students embarking on their first PBL course?
Description and explanation of a suggested improvement : Outline the steps taken to select, prepare and format the report. This should be brief and presented in dot point format
Outline a comprehensive due diligence process : Outline a comprehensive due diligence process. Provide a detailed valuation of the target company using multiple valuation methods.
Prepare functional specifications : Prepare functional specifications and Present at least 2 designs to meet the design specifications. The designs are to include, as relevant
Define how escape extinction falls under this category : Define how escape extinction (EE) falls under this category and how the high-p sequence may reduce reliance on EE.
Constraints and requirements to the bridge design : State department of transportation. You have been assigned responsibility for the design of a truss bridge to carry a two-lane highway across the river valley
Is the essay logical well organized and well written : Is the essay logical, well organized, and well written? Are the grammar, spelling, and vocabulary appropriate for graduate-level work?
Chinese-American immigrants : What issues can arise in giving vaccine to Chinese-American immigrants?

Reviews

Write a Review

Civil Engineering Questions & Answers

  Calculate the moments ma and mb about point d

Calculate the moments MA and MB about point D for the forces applied at pointsA and B. Then, determine the resulting couple moment MR. Assume that a positive moment produces a counterclockwise rotation whereas a negative moment produces a clockwise r..

  How many exploratory borings will be required and to what

A one-story, 50-m wide X 90-m long manufacturing building is to be built on a site underlain by medium dense to dense silty sand with occasional gravel

  CPCCBC4001A Apply building codes and standards

CPCCBC4001A Apply building codes and standards to the construction process for low rise building projects Assignment Help and Solution

  How is the work relevant to the field of cost engineering

I require Relevance, Applicability and Critical Evaluation.? How is the work relevant to the field of cost engineering? Can the results be applied? Give example of the paper's potential usefulness and identify what would make it more useful

  Ideal gas model with data

Air enters a turbine operating at steady state at 6 bar and 1100 K and expands isentropically to a state a where the temperature is 700 K. Employing the ideal gas model with data, and ignoring kinetic and potential energy changes

  Determine properties of the material poissons ratio

At the proportional limit, . gage length of a -diameter alloy rod has elongated . and the diameter has been reduced . The total tension force on the rod was . Determine the following properties of the material

  Determine the rates of heat and moisture removal from air

Part of the moisture in the air that condenses during the process is also removed at 15°C. Determine the rates of heat and moisture removal from the air.

  Explain how to determine the max height of a brick wall

Assuming a density of 120/ft^3 for masonry brick work, determine the max height of a brick wall if the allowable compressive stress is limited to 150/in^2 and the brick is a) 4" wide b) 6" wide.

  What is the biomass concentration in the aeration tank

average flow rate = .0022 m^3 /s (190 m^3 /d) Influent Substrate concentration = 250 mg/L as COD (all essentially soluble) Mean cell residence time is to be 5 days Volume of mix tank = 25 m^3 the reactors kenetic constants are

  Determine how long he can survive on his body fat alone

Consider a man who has 20 kg of body fat when he goes on a hunger strike. Determine how long he can survive on his body fat alone.

  Example of sorting an array of strings using c language

Could you please give me a basic example of sorting an array of strings using C language?

  Find the probability that is drawn marble is only white

Two marbles are drawn in succession from the box containing 10 red, 30 white, 20 blue, and 15 orange marbles. replacement being made after each drawing. Find the probability that is: (a) both are white

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd