Prepare detailed designs of civil steel structures

Assignment Help Civil Engineering
Reference no: EM133232588

Assignment - Prepare detailed design of civil steel structures

Assessment Description - This assessment task is a project for you to prepare detailed designs of civil steel structures on at least two occasions, including:

-carrying out risk assessments

-evaluating design options for civil steel structures

You are required to analyse the case scenario and provide written solutions to task activities by demonstrating applicable foundation skills and knowledge. You must also provide performance solutions to specific role-play activities relevant to case study in role-plays as agreed by your assessor. You must read the following information related to your assessment to prepare and perform in order to provide evidence of your skills and knowledge related to the unit of competency.

Purpose (objective) of the Assessment - To gather evidence of your ability to manage civil works design processes, including interpreting and scoping design requirements, monitoring and supporting design processes and reviewing designs.

Assessment Instructions -

1. Review the skills application section/s of the learner workbook.

2. Read the task performance requirements and foundation skills application for each task activity.

3. Conduct research and review literature relevant to the unit

4. Provide solutions to each written and performance activity using skills and knowledge and demonstrating your foundation skills.

Note: Use word-process document for written activities to provide written evidence as specified in the task. you may use MS Word /Mac document for your written evidence.

5. This task requires you to play roles. As specified and agreed by your assessor, role-play the relevant activities demonstrating relevant skills.

6. The assessment is due on the date specified by your assessor.

7. Any variations to this arrangement must be approved in writing by your assessor.

8. Submit your work with any required evidence attached.

9. See the specifications below for details of submission requirements.

10. Continue to read the following assessment requirements:

Project - (Skills and Knowledge Application)

Your task - You are required to undertake a civil construction design project as outlined below. Your Assessor will take the role of the client for the purposes of this assessment task.

Steel Structure Bridge Design -

You have been commissioned to develop a design for a bridge in Victoria that will be primarily constructed from steel. The design must comply to Victorian requirements as outlined in the VicRoads Technical notes. Bridge Technical Notes are Codes of Practice which state VicRoads' requirements for the design of road structures. Bridge Technical Notes are to be read in conjunction with AS5100:2017 and other relevant Australian Standards, for example AS1597 and AS2041. Your Assessor will nominate the location.

In your prepared design, produce the following:

-calculations, including: loads, sheer forces, bending moments, stresses, construction materials and services quantities and construction cost estimates

-recommended sizing of components

-recommended concrete strength

-recommended reinforcement sizing and location

-drawings

-risk assessment of: the existing conditions, the application of the design and maintainability of the completed works

-health, safety and environmental requirements

-contribution to ancillary documentation, which may include: design notes, construction notes, supplementary drawings and input to the specifications

Attachment:- Civil Steel Structures Assignment File.rar

Reference no: EM133232588

Questions Cloud

Deity of jesus christ attack throughout church history : How was the deity of Jesus Christ attack throughout church history? You must mention theologians defensors and the people who attack the doctrine
Resurrection of jesus completes the work of redemption : Explain how ultimately the resurrection of Jesus completes the work of redemption.
Paul calls them to imitate in variety of different situation : Paul calls them to imitate in a variety of different situations? Cite evidence from at least two of the letters to make your case.
What would someone in CCO role be most concerned : What would someone in CCO (Chief Commercial Officer) role be most concerned about when developing future leaders? What would their perspective be and why
Prepare detailed designs of civil steel structures : You are required to undertake a civil construction design project - You have been commissioned to develop a design for a bridge in Victoria
Do you think deploying DevOps practices would more difficult : Do you think deploying DevOps practices would be more difficult in a larger, more established organization? How might a company begin to make cultural changes
What is sarai profit margin : Sarai's Sandy Beach Gear has net sales of $100,000, cost of goods sold of $60,000, and net income of $25,000. What is Sarai's profit margin
East asia and western europe shape the history : How did the religion views of East Asia and Western Europe shape the history and culture of the areas?
Babylonian captivity have on average christian : What effect did the great papal schism and the "Babylonian Captivity" have on the average Christian?

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the coordinates of the point of intersection

Line JK has the equation y = -0.5x + 5, and line LM has the equation y = 1.5x - 5. Determine the coordinates of the point of intersection between JK and LM.

  Estimate the excess pore pressure distribution in clay layer

The project involved rapidly placing 5 m of fill over a large area that applied a stress of 100 kPa to the underlying soil. It was initially expected that after 2 years consolidation would be complete.

  Determine the volume flow rate

Water with a static pressure of 1.96kN/M2 flows through an 800 mm diameter pipe. A pitot tube pressure gage in this pipe reads a pressure of 5.88 kN/M2. How do you determine the volume flow rate (Q) of the water? (Q = 1.40 M^3/sec, V=2.79 M/sec)

  Design a balcony slab exposed to the weather

Design a balcony slab exposed to the weather. The cantilevered span is 8 ft and the service live load is 100 psf. fc' = 4,000 psi, fy = 60,000 psi.

  Probelm relating to fire a bullet

A bullet is fired from a height of 150m at a velocity of 300kmph at an angle of 35 upward. Neglecting air resistance. Find: a) total time of flight b) horizontal range

  Calculate the coefficient of volume compressibility

In an oedometer test, the void ratio of a clay sample changed from 1.62 to 1.41 as the vertical effective stress imposed on the sample was increased from 100 kPa to 200 kPa. Later on, the vertical effective stress on the sample was decreased

  Determine the maximum weight w

The breaking strength of the cable FG that supports the portable camping stool is 400 lb. Determine the maximum weight W that can be supported. Neglect friction and the weights of the members.

  Determine what type of surface would wheeler tractor be

A wheeled tractor with high-pressure tires and weighing 74,946 lb is pulled up a 5% slope at uniform speed. If the tension in the tow cable is 13,000 lb, what is the rolling resistance of the road

  Determine the velocity and acceleration of car a

At the instant shown, car A has a speed of 20 km/h, which is being increased at the rate of 300 km/h2 as the car enters an expressway. At the same instant, car B is decelerating at 250 km/h^2

  Compute departures and latitudes and linear misclosure

Compute departures and latitudes, linear misclosure, and relative precision for a five-sided, closed traverse. It is given that the aziumuth of AB is 74 degrees 31 minutes, 17 seconds, A = 105 degrees 13 minutes 14 seconds B = 92

  What is the difference in total cost between the two options

Two remediation options are being considered for a contaminated land area formerly used for industrial operations. Option 1 involves removing all of the contaminated soil over a two-year period at a cost of 2.2$ million per year

  Calculate manning coefficient n for the given reach

The following data are obtained for a particular reach of the Provo river in Utah: cross sectional area A = 183 ft2, free surface width = 55 ft, average depth = 3.3 ft, Rh = 3.32 ft, V = 6.56 ft/s, length of the reach = 116 ft, and elevation drop ..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd