Prepare cost estimates for components such as excavation

Assignment Help Civil Engineering
Reference no: EM131031551

PROJECT DESCRIPTION

The project in the course is a comprehensive course-level assessment on various aspects of cost estimation.

In the project, you are required to prepare construction estimates for an office, collate the estimates in a Microsoft PowerPoint presentation, briefly justify them, and also justify the choice of the spreadsheet style for each estimate.

Course Objectives Tested:

1. Demonstrate a systematic approach to completing the estimating process in commercial construction.

2. Demonstrate basic skills required to measure and calculate quantities.

3. Describe the methods used for pricing the various takeoff elements in a construction project estimate.

4. Prepare a takeoff of concrete work for a construction project.

5. Prepare a takeoff of masonry work for a construction project.

6. Prepare a takeoff for a construction project using metal components.

7. Estimate the quantity of woods and plastics.

8. Estimate the pricing for thermal and moisture protection for a project.

9. Estimate the doors and windows, finish materials, and equipment needed for a construction project.

10. Prepare an estimate using fire suppression, plumbing, mechanical and electrical factors and Means CostWorks data sets.

11. Prepare an estimate using earthwork factors and Means CostWorks data sets.

12. Prepare a price estimate for construction equipment and excavation work.

13. Apply assembly and approximate estimating techniques.

14. Analyze equipment and general requirements in the estimating process.

15. Prepare a price estimate of concrete, masonry, structural steel, carpentry, and miscellaneous items.

Title: Building Construction Proposal

Assume that you are part of a construction company and you have to prepare cost estimates for the construction of a branch office of a software development company, which has an expected occupancy of 100 people.

Perform the following tasks:

Task 1:

Prepare cost estimates for components such as excavation, masonry, concrete, interior finishes, plumbing, electrical, and heating, ventilation, and air-conditioning (HVAC).

You may choose Excel, CostWorks, or both to prepare the estimates. Justify your choice of spreadsheet style for each estimate in a separate Word document.

Task 2:

Collate the estimates in a PowerPoint presentation. Briefly describe each estimate in the Notes area of the respective slide.

Submission Requirements:

Submit the following:

1. Cost estimates in Excel or CostWorks format

2. Justification of the spreadsheet type in a Word document (font: Arial, size 12, double-spacing; citation style: APA; length: 2-3 pages)

3. Descriptions of the estimates in a PowerPoint presentation.

Reference no: EM131031551

Questions Cloud

Show a graph comparing the centre temperature : Show a graph comparing the centre temperature only against time for different temperatures. Annotate to identify important features and explain the meaning of graph - Write a short summary paragraph highlighting advice you would give to the novice..
Describe the law of large numbers : Does this article accurately describe the law of large numbers? Explain your answer.
Estimate the total volume of board using costworks : For a location in Oshkosh, WI, estimate the total volume, in thousand board feet (MBF), for 100 pieces of 2" x 8", 16-feet-long board by using CostWorks.
Videos for law of large numbers : We did a Google search of "videos for law of large numbers" and "videos for the central limit theorem" and found several links.
Prepare cost estimates for components such as excavation : Prepare cost estimates for components such as excavation, masonry, concrete, interior finishes, plumbing, electrical, and heating, ventilation, and air-conditioning (HVAC).
Determine the rate of heat transfer to the plates : If the plates remain in the oven until their average temperature rises to 1000°F, determine the rate of heat transfer to the plates in the furnace.
Determine the rate of heat transfer to the rods in the oven : If the rods enter the oven at 30°C and leave at a mean temperature of 700°C, determine the rate of heat transfer to the rods in the oven.
Could the proposed benefits of the daimler-chrysler merger : Could the proposed benefits of the Daimler-Chrysler merger have been achieved though a strategic alliance with little or no equity changing hands?
Mean and standard deviation of casper : What are the mean and standard deviation of Casper's average winnings x on his 150,000 bets?

Reviews

Write a Review

Civil Engineering Questions & Answers

  What is porportion of potential energy head at crosssection

if a pipeline is horizontal, what is the porportion of the potential energy head at the upstream crossection that is changed to kinetic energy head at the downstream crossesction

  How much does the aggregate in the wheelbarrow weight

You fill a 2-cubic wheelbarrow to the top with aggregate. if the specific gravity of the aggregate is 2.548, and 18% of the aggregate is void spaces, how much does the aggregate in the wheelbarrow weight?

  Calculate size of the initial flaw that will cause failure

A high strength steel is developed with a yield stress of 1460 MPa and a critical stress intensity factor of 30MPa(m)^0.5. Calculate the size of the initial flaw that will cause failure in an infinite plate when the load applied is 50% of the load..

  Calculate concentration of oxygen in water in equilibrium

Calculate the concentration of oxygen in the water in equilibrium (in mg/L) with the atmosphere near La Paz, Bolivia (3650 m), at 20 degrees Celcius.

  Find how many kg of precipitate will be formed as sludge

One method of removing phosphate from wastewater effluents is to precipitate it with aluminum sulfate. A plausible stoichiometry (but not exact because aluminum and phosphate can form many different chemical materials) is

  Determine the maximum height the projectile will reach

A projectile is fired up into the air at a speed of 161 m/s at an angle of 64° relative to the horizontal. Determine the maximum height the projectile will reach.

  Determine the flow rate through pipe b

(i) Determine the flow rate through pipe B. Discard minor losses and assume the water temperature to be 150C. (ii) Show that the flow is fully rough and thus the friction factor is independent of Reynolds number.

  Find the effective angle of shearing resistance of sand

An adiabatic compressor is used to bring saturated water vapor at a pressure of 103 lbf/in^2 up to 1000 lbf/in^2, where the actual exit temperatureis 1000 F. Find the compressor fficiency an the entropy generation. Is there a improvement by reducing ..

  Determine the paddle-wheel work done

During the process 20 Btu of heat is lost to the surroundings. Determine the paddle-wheel work done. Neglect the energy stored in the paddle wheel

  What was the discharge capacity andvelocity at full flow

a) What was the discharge capacity andvelocity at full flow at the time of installation b) If the pipe presently carries a flow of15 cfs when full, determine the present velocity and present value of n.

  Determine maximum permissible deflection that may be allowed

If this rod is to be used again with an initially straight axis, determine the maximum permissible deflection that may be allowed during testing procedures. Young's Modulus = 210 kN/mm2 and Yield stress of the steel= 240 N/mm2.

  Determine the cost c of the turbine for mass flow

Ethylene enters a turbine at 10 bar and 450 K, and exhausts at (atm) and 325 K. For mass flow in = 4.5 kg s^-1, determine the cost C of the turbine. State any assumptions you make. Data: H1 = 761.1 , H2 = 536.9 kg^-1, C/$ = (15,200)(1W1/kW)^0.573

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd