Prepare and print a one-page cost model for the project

Assignment Help Computer Engineering
Reference no: EM132781955

Assignment: Tony Prince and his team are working on the Recreation and Wellness Intranet Project. They have been asked to refine the existing cost estimate for the project so they can evaluate supplier bids and have a solid cost baseline for evaluating project performance. Recall that your schedule and cost goals are to complete the project in six months for under $200,000.

Tasks: 1. Prepare and print a one-page cost model for this project using spreadsheet software. Use the following WBS, and be sure to document your assumptions in preparing the cost model. Assume a labor rate of $100/hour for the project manager and $60/hour for other project team members. Assume that none of the work is outsourced, labor costs for users are not included, and there are no additional hardware costs. The total estimate should be $200,000.

1. Project management

2. Requirements definition

3. Web site design

3.1 Registration for recreational programs

3.2 Registration for classes and programs

3.3 Tracking system

3.4 Incentive system

4. Web site development

4.1 Registration for recreational programs

4.2 Registration for classes and programs

4.3 Tracking system

4.4 Incentive system

5. Testing

6. Training, rollout, and support

2. Using the cost model you created in Task 1, prepare a cost baseline by allocating the costs by WBS for each month of the project.

3. Assume that you have completed three months of the project. The BAC was $200,000 for this six-month project. You can also make the following assumptions:

PV = $120,000

EV = $100,000

AC = $90,000

a. What is the cost variance, schedule variance, cost performance index (CPI), and schedule performance index (SPI) for the project?

b. How is the project doing? Is it ahead of schedule or behind schedule? Is it under budget or over budget?

c. Use the CPI to calculate the estimate at completion (EAC) for this project. Is the project performing better or worse than planned?

d. Use the SPI to estimate how long it will take to finish this project.

e. Sketch an earned value chart using the preceding information.

Reference no: EM132781955

Questions Cloud

Determine all possible permissible value : A spherical tank for storing gas under pressure is 25mm diameter and is made of structural stll 15X100 thick the yeild point 22x10
What does the academic literature on violent in mass media : What does the academic literature on violent and sexual content in mass media suggest are the impacts of such content on individuals?
Changes in load combinations of the philippines : What are the changes in load combinations of the Philippines?
What is the maximum amount that can be deducted : After-school day care fees of $4,000 for the 9 year-old. What is the maximum amount that can be deducted from G's income for tax purposes in the current year
Prepare and print a one-page cost model for the project : Prepare and print a one-page cost model for this project using spreadsheet software. Use the following WBS, and be sure to document your assumptions.
What is Sylvie basis in the land she received : Sylvie's basis in her partnership interest was $15,000 immediately before the distribution. What is Sylvie's basis in the land she received in this distribution
Determine the degree of the curve : 1. The middle ordinate of a simple curve is 2m and its long chord is 30m, determine its radius.
How a company might capitalize on the trend : Discuss how a company might capitalize on the trend and insights discussed in the article. Many companies conduct research on ongoing basis to gather consumer
Discuss how to conduct soil boring and sampling : 1. Discuss how to conduct soil boring and sampling. 2. Discuss how to conduct SPT and CPT. Discuss the difference.

Reviews

Write a Review

Computer Engineering Questions & Answers

  Mathematics in computing

Binary search tree, and postorder and preorder traversal Determine the shortest path in Graph

  Ict governance

ICT is defined as the term of Information and communication technologies, it is diverse set of technical tools and resources used by the government agencies to communicate and produce, circulate, store, and manage all information.

  Implementation of memory management

Assignment covers the following eight topics and explore the implementation of memory management, processes and threads.

  Realize business and organizational data storage

Realize business and organizational data storage and fast access times are much more important than they have ever been. Compare and contrast magnetic tapes, magnetic disks, optical discs

  What is the protocol overhead

What are the advantages of using a compiled language over an interpreted one? Under what circumstances would you select to use an interpreted language?

  Implementation of memory management

Paper describes about memory management. How memory is used in executing programs and its critical support for applications.

  Define open and closed loop control systems

Define open and closed loop cotrol systems.Explain difference between time varying and time invariant control system wth suitable example.

  Prepare a proposal to deploy windows server

Prepare a proposal to deploy Windows Server onto an existing network based on the provided scenario.

  Security policy document project

Analyze security requirements and develop a security policy

  Write a procedure that produces independent stack objects

Write a procedure (make-stack) that produces independent stack objects, using a message-passing style, e.g.

  Define a suitable functional unit

Define a suitable functional unit for a comparative study between two different types of paint.

  Calculate yield to maturity and bond prices

Calculate yield to maturity (YTM) and bond prices

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd