Reference no: EM13515022
Question - IT Project Proposal
Prepare an IT-related project proposal for approval. The submitted proposal should reflect one of the IT-related specializations (DSS, ISA, or IT general), and be of sufficient scope to achieve the requirements as stated for the Final Project (i.e., 10-12 pages) as well as to span the length of the course (see Course Outcomes and unit activities). Included in the proposal should be a statement of purpose or need, an overview of the proposed project, key milestones, a high-level budgetary estimate, benefits, return-on-investment (ROI) calculation, and key stakeholders.
Note that the proposal may reflect a real project, as assigned within your place of employment or elsewhere (non-profit organization), a textbook-based case study (selected from prior MSIT courses, or other sources), or a hypothetical project, at the student's discretion.
You are required to get approval of the project from your instructor.
Minimum parameters for project scope are:
Reflect one of the IT-related specializations (DSS, ISA, or IT in general)
Key Milestones with supporting tasks (5 first-level tasks / 20 second-level tasks / 10 third-level tasks) in MS Project with a $250,000 budget (hardware, software, labor, etc.)
5-weeks in duration
Five Key Stakeholders
Part 2: IT Project Plan
Produce an IT project plan. The submitted plan should be of sufficient detail to successfully execute the proposed project from Unit 2. Included in the plan should be an overview of the proposed project (per the project proposal), the development of a WBS including tasks, durations, dependencies, predecessors, milestones, and resources (in MS Project format), the identification of the critical path (with associated network/AOA diagram), a risk management plan, and a communications plan.
Define the ph after the volumes of titrant
: Consider the titration of 30.0 ml of 0.025 M NH3 with 0.020 M HCl. Calculate the pH after the following volumes of titrant have been added.
|
Evaluate leadership models
: Create a group of four standards that you will use to evaluate leadership models. For example, one standard might be: It has been shown to lead to improved performance.
|
Explain the conversion of pyruvate ion to lactate ion
: Is the conversion of pyruvate ion to lactate ion in the reaction CH3COCO2-(aq) +NADH(aq) + H+(aq) CH3CH(OH)CO2-(aq) + NAD+(aq) a redox reaction
|
What function could ischial callosities have
: Ischial callosities are bare pads covered with tough, roughened skin and located on the buttocks of some non-primate primates. Is the skeleton modified as a part of this trait? What function could ischial callosities have?
|
Prepare an it-related project proposal for approval
: Produce an IT project plan. The submitted plan should be of sufficient detail to successfully execute the proposed project
|
Find by how much did the volume change
: A container holds 0.05 m^3 of ethanol at a temperature of 15 degrees celcius. The temperature is then raised to 75 degrees celcius. By how much did the volume change
|
Operating for several months
: After operating for several months, architect Edmond Roberge completed the following transactions during the later part of the month. What are the journal entries for the following
|
Explain fixed with pressure gauges and small valves
: Three 5 L flasks, fixed with pressure gauges and small valves, each contain 4 g of gas at 273 K. Flask A contains H2, flask B contains He, and flask C contains CH4. Rank the flask contents in terms of the following properties.
|
How far does combined spring stretch as comes equilibrium
: Two springs,each w/ spring constant 20N/m,connected parallel, & combination hung vertically one end.10-N weight is suspended from other end of combined spring
|