Question: Hyde Park Elementary has plans to build a new playground in 2017. They received a $120,000 government grant to be used for building the playground. They are hoping to break ground in May 2017 and complete the project by the start of school in September. Before they can start the project, however, they must dismantle the existing playground that has become unsafe based on current safety standards. They are also planning to complete soil testing once the existing playground is dismantled as a number of residential properties in the community have tested positive for soil contamination. Due to recent news articles, parents are very concerned about the potential for soil contamination and are demanding a full test to ensure their kids are not playing on a contaminated playground.

Sonya Muhammed, the school principal, has compiled the following estimates related to the new playground:

Cost for dismantling existing equipment $22,000

Salvage value from the metal from existing equipment $7,000

Soil testing $18,000

New playground equipment $45,000

Cost of installation $16,000

Cost of resurfacing play area in rubber $55,000

Cost of landscaping (including $5,000 for gravel) $22,000

Cost of removing and replacing soil $73,000

The costs for installation, resurfacing, landscaping, and soil removal are the costs quoted by professional contractors. Sonya was approached by the president of the student council, Josh Schwinn, who has volunteered the council's time for installing and landscaping the new playground. This will save the school approximately $25,000 in costs and Sonya has decided to accept this offer as two of the council members who will be helping are journeymen carpenters.

The school has two options in terms of dealing with the contaminated soil. The first option is to not partake in the soil testing and to simply resurface the play area with a poured-rubber matting that can cover the entire play surface. This will cost, as Sonya indicated in her estimates above, approximately $55,000 - a large chunk of the playground budget. The other option is to perform the soil testing. A municipal worker has estimated that there is a 40% chance that the soil is contaminated. If this is the case, the school will either need to resurface the area for $55,000 or it can have the contaminated soil removed and replaced for a hefty cost of $73,000 plus the cost of gravel. However, there is a 60% chance that the soil will not be contaminated. Sonya is wondering what they should do and has asked for your help. 

REQUIRED

Prepare an analysis of the potential project costs for the following scenarios. Note: There is no need for gravel in the resurfacing scenario.

1. Resurface ground without doing soil testing.

2. Complete the soil testing. In this case there are two outcomes: remove/replace the soil if contaminated & resurface if contaminated.

Use the probabilities provided by the municipal worker to determine a weighted cost for each of these outcomes.

3. What option would you recommend for the school? Why? Are there other non-financial considerations that you need to include in your decision?

Reference no: EM131607877

Questions Cloud

Consensus forecast of financial analysts is dividend : A company just paid a dividend of $1.30 per share. The consensus forecast of financial analysts is a dividend of $1.70 per share next year,
What would be a fair price for this block today : If the required rate of return is 12% per year, what would be a fair price for this block today?
What discount rate will this project break even : When will the initial cash outflow be recovered? At what discount rate will this project break even?
What effects would the insolvency of your company : From a global perspective, what effects would the insolvency of your company have on the U.S. economy as well as the global economy
Prepare an analysis of the potential project costs : Prepare an analysis of the potential project costs for the following scenarios. Note: There is no need for gravel in the resurfacing scenario
Future spot rates for in the money and out of the money : What are the future spot rates for “in the money” and “out of the money”? What is the spot rate for the breakeven point (zero net profit) for this option?
What would be a tag price for the stock today : what would be a tag price for the stock today?
What is the degree of total leverage : what is the degree of total (combined) leverage of Haunted Forest, Inc.?
Which projects should be undertaken to maximise npv : Rand Water is evaluating five possible projects to enhance the efficiency of its water treatment plant. It is permitted to spend R5 million on investment.

Reviews

Write a Review

Accounting Basics Questions & Answers

  How much control does fed have over this longer real rate

Hubbard argues that the Fed can control the Fed funds rate, but the interest rate that is important for the economy is a longer-term real rate of interest.   How much control does the Fed have over this longer real rate?

  Coures:- fundamental accounting principles

Coures:- Fundamental Accounting Principles: - Explain the goals and uses of special journals.

  Accounting problems

Accounting problems,  Draw a detailed timeline incorporating the dividends, calculate    the exact Payback Period  b)   the discounted Payback Period. the IRR,  the NPV, the Profitability Index.

  Write a report on internal controls

Write a report on Internal Controls

  Prepare the bank reconciliation for company

Prepare the bank reconciliation for company.

  Cost-benefit analysis

Create a cost-benefit analysis to evaluate the project

  Theory of interest

Theory of Interest: NPV, IRR, Nominal and Real, Amortization, Sinking Fund, TWRR, DWRR

  Liquidity and profitability

Distinguish between liquidity and profitability.

  What is the expected risk premium on the portfolio

Your Corp, Inc. has a corporate tax rate of 35%. Please calculate their after tax cost of debt expressed as a percentage. Your Corp, Inc. has several outstanding bond issues all of which require semiannual interest payments.

  Simple interest and compound interest

Simple Interest, Compound interest, discount rate, force of interest, AV, PV

  Capm and venture capital

CAPM and Venture Capital

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd