Reference no: EM13902167
In January 2013, ProTech Co. pays $1,550,000 for a tract of land with two buildings. It plans to demolish Building A and build a new shop in its place. Building B will be a company office; it is appraised at $482,800, with a useful life of 15 years and a $99,500 salvage value. A lighted parking lot near Building B has improvements (Land Improvements B) valued at $ 142,000 that are expected to last another five years with no salvage value. Without the buildings and improvements, the tract of land is valued at $ 795,200. The company also incurs the following additional costs.
Cost to demolish Building A . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 122,000
Cost of additional land grading . . . . . . . . . . . . . . . . . . . . . . . . . 174,500
Cost to construct new building (Building C), having a useful life of 20 years and a $ 258,000 salvage value . . . . . . . . . 1,458,000
Cost of new land improvements (Land Improvements C) near Building
C, having a 10 year useful life and no salvage value . . . . . . . . . . 103,500
Required:
1. Prepare a table with the following column headings: Land, Building B, Building C, Land Improvements B, and Land Improvements C. Allocate the costs incurred by ProTech to the appropriate columns and total each column (round percents to the nearest 1%).
2. Prepare a single journal entry to record all incurred costs assuming they are paid in cash on January 1, 2013.
3. Using the straight line method, prepare the December 31 adjusting entries to record depreciation for the 12 months of 2013 when these assets were in use.
Building assurance argument
: Develop criteria that could be used to assess which level the company has achieved for the System Security Engineering Capability Maturity Model (SSE-CMM) Process Area "Building Assurance Argument."
|
Features and various types of rocks
: Describe the geological features and various types of rocks that formed in California (for example, mountains, craters, canyons, volcanoes, fault lines, or folds).
|
Identify costs to construct facility that should capitalized
: Assume that a company needs to acquire a large special-purpose materials handling facility. Identify the costs to construct this facility that should be capitalized as assets.
|
Determine the distance to the fault
: By multiplying the rhs brackets and collecting terms, show the effect of the leads is given by: Rx = (Rf-Ri/Rf) Rc-(RiRi/Rf). Determine the distance to the fault by modifying the expression in (b) and using Rx/Rc = x/L
|
Prepare a table with the following column headings
: In January 2013, ProTech Co. pays $1,550,000 for a tract of land with two buildings.
|
What are the mission, values, goals and objectives
: What are the (mission, values, goals and objectives) of the organization?
|
Design a network security
: Design a network, network security, and WAN connectivity for the following situation Organization of 100 computer users in three locations: Location one: 2 buildings, 25 computer users in each building. 50 Total
|
Represent the greatest advancement
: 1. Which do you consider to represent the greatest advancement: Quantum mechanics or discovering the shape of the DNA molecule--- and why?
|
Evaluate the user dialog strategies used by a menu-driven
: Write a four to five (4-5) page paper in which you:Evaluate the user dialog strategies used by a menu-driven interface.Determine why menu-driven interfaces continue to be popular in the modern computing age.
|