Prepare a simple job cost analysis sheet for the trade

Assignment Help Civil Engineering
Reference no: EM131343791 , Length: word count:2000

Assessment

Questions

1. List the 3 types of resource that can form part of the cost to complete a task on a building project. How does the term 'all-in-rate' relate to this?

2. List 3 contractual requirements and 3 'conditions of approval' items which may be included in the Preliminaries section of a building estimate.

3. At the time of tendering, quotations are sought from many suppliers and subcontractors. Generally builders are looking for the most competitive price but performance and other criteria are also a factor in the selection process. Explain why the nominated supplier and sub-contractor details need to be included in schedules.

4. Take off and measure the quantity of face bricks required for the project, including wastage. (Note that Q5 requires you to cost the bricklayer trade in total, so keep this in mind in your take off.) Use a standard P10 format (see attached form) to determine the quantity.

Prepare an order form from your building company for the supply and delivery of these face bricks to your project. Include all relevant details to ensure the order is received on site when required. Use fictitious names and addresses to form your order. (Note: MS Office Word has sample templates for Purchase Orders that you may wish to use)

5. When a tender to build a project is won, the estimate (or builder's bill) becomes the 'budget' for the project. Estimated costs have to be achieved or savings made in other areas to produce the anticipated profit margin. The actual costs of a project are usually recorded in a 'Job Cost' document and compared to the estimated costs. This is usually done on a trade by trade basis.

Prepare a simple job cost analysis sheet for the trade of Bricklayer for Project 1. Take off and measure the entire trade of Bricklayer and cost each item. Include the actual cost of each item and show the variance on estimated to actual costs. (You can make up some numbers to show a variance)

(Your 'items' should include; face bricks, commons, mortar, flashings, veneer ties, lintels, cleaning down, labour, as a minimum. Use the following as headings for your cost analysis sheet: Item, Details, Est. Cost, Actual Cost, Variance)

6. a) Explain why it is important to compare the estimated costs to the actual costs for each trade section on its completion.

b) What is the benefit of analysing the total actual cost vs the estimated cost for the whole of the job at completion?

7. For the residence in Project 1, you are to prepare 2 schedules:

a) A paint schedule for 5 rooms nominated by you. Select colours from a current proprietary paint chart and nominate the manufacturer in the schedule. Also nominate the surfaces to be painted, the paint types (sealer, undercoat, etc.) and finishes (gloss, low sheen, etc.) and the number of coats required for each surface.

b) A door schedule for every room in the home including front and rear doors. Specify the nominal size of the door to the current standards available. Also specify the type of door, e.g. solid core, hollow core or entrance door, flush or panelled, etc. assigned as you think appropriate.

8. a) Comment on the need to keep orderly files of the documentation on a building site, and detail the consequences of poor office keeping procedures on site.

b) Comment on the importance of the conditions of approval by the local council and version control of documents.

9. Prepare a flowchart for the processing of variations. Your chart should commence at request and follow each step through to invoicing the variation in a progress claim.

Reference no: EM131343791

Questions Cloud

Pick a bank or financial services firm : Pick a bank or financial services firm you would like to analyze.- also identify a competitor that is similar in size and operations.
Difference between stress-strain relationship : Obtain an expression relating the shear stress, s, and the shear strain, g, assuming g=larmda-1/larmda. Comment on the difference between this stress/strain relationship and the one for simple elongation.
Discuss the relationship between happiness and morality : PL 201- For both parts, it will probably be necessary to discuss the relationship between happiness and morality (if there is one). Also, both parts together should end up being a single essay between 500 and 800 words.
Does completion of eight group counseling sessions help : Does completion of eight group counseling sessions help to decrease levels of social anxiety (or other symptoms or issues)?How do students or clients describe the experience of the counseling they have received and its impact on them?What is the effe..
Prepare a simple job cost analysis sheet for the trade : CPCCBC4005A Assessment. Prepare a simple job cost analysis sheet for the trade of Bricklayer for Project 1. Take off and measure the entire trade of Bricklayer and cost each item. Include the actual cost of each item and show the variance on estim..
How does the christian worldviews resolution : How does the Christian worldview's resolution compare to another option - which you analyze ethical thinking and use values-based decision making to address a case study from the perspective of the Christian worldview as compared to your own worldv..
Which is the more ethically reasonable choice : Which is the more ethically reasonable choice? Defend your position by establishing a theoretical foundation using current (within the last three years) or foundational references.
Describe and analyze lesbian or cultural feminism : Describe and analyze lesbian or cultural feminism. You may choose to think about some of the following questions: what were some of the major ideas promoted by lesbian or cultural feminist groups such as the Radicalesbians, or by writers, artists,..
Explain your reaction to your experience of the given biases : Determine the biases you experienced as you examined the reasons for and against your position. Describe your reaction to your experience of these biases.

Reviews

len1343791

1/6/2017 2:36:36 AM

This is building and construction subject assignment, 2000 words. Completed ALL questions of this assignment. Included my name, student number, unit number, assignment number. Reviewed and spell checked my document and Saved a copy of the assignment on my own computer.

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd