Prepare a procedural plan

Assignment Help Project Management
Reference no: EM132857658

CPCCBC4001B Apply building codes and standards to the construction process for low rise building projects

Assessment Task - Project

Performance Objective
You are required to demonstrate your ability to apply your understanding of low rise and medium rise construction compliance according to the Building Legislation, NCC and Australian Standards to the Building or demolition of low-rise, medium-rise residential & commercial structures using conventional methods.

Assessment Description
For a residential and a commercial project you are required to plan, coordinate and manage a series of construction tasks including the demolition of a structure, the laying of footings, installation of floor systems, construction of wall and roof framing and the installation of external cladding.

Scenario

You are the supervisor of a construction company about to begin work on a single-storey timber clad residence and a warehouse.

The timber clad residence will utilise typical construction techniques such as timber framing and roof trusses. The warehouse will utilise concrete panel construction and structural steel.

As the building supervisor of these projects you will need to interpret the project documentation to ensure the proposed buildings constructed according to current relevant state legislation, the BCA, Australian standards and good building practice.

There is an existing asbestos-clad shed on one of the sites and you must ensure it is demolished in accordance with legislative and planning requirements and safe work practices.

Plan for Structural Integrity

Part 1
a. Explain the roles of three (3) industry professionals you may need to engage or consult to complete these projects. In your explanation ensure you include the following:
• Their possible relevance to these project
• Documentation they provide
Write approximately 100 words for each industry professional, present your explanation using Appendix 1
b. Check the BCA/NCC requirements for the proposed residential dwelling as if it were to be constructed within the following environments:
• Bushfire (BAL-40)
• High-wind
• Earthquake
• Alpine
For each of the different environments you are required to:
• Outline the documentation used in design and construction of buildings in these environments
• List the professionals or consultants you may consult to ensure a structure designed and built in these environments complies with building regulations.
• Specify which parts of the structures that may need additional design and construction considerations.

**Present your specifications using the table located in Appendix 2

Required Resources
• NCC Volume 2
c. You are considering using an alternative exterior wall cladding on this project. You have been told about MasterWall polystyrene wall cladding by an architect. You have never used a polystyrene cladding system before and are unsure about this product.
Not all new products or systems are necessary better. Some products are manufactured overseas to different standards than Australia. Not all new products meet the deemed-to-satisfy provision of the BCA.
You are required to:
• Outline the steps that you would take to assess the new technology and decide whether it is right for a project.
• Determine if MasterWall meets the deemed-to-satisfy provision of the BCA.
• Outline the relevant performance requirements that an alternative wall cladding system must meet.
• Document the Assessment Methods the manufacturers of MasterWall have undertaken
• Outline what documentation would you provide a building surveyor to prove MasterWall complied with the relevant parts of the BCA

Minimum 300 words.

Plan and Manage Building Systems

Part 3 - Footing and Slabs
a. Assess the specifications for strip footing provided in Appendix 4a for compliance with relevant parts NCC/BCA Volume 2 and/or AS2870. Ensure you include the number of the relevant clause, figure or table where the information was found.
b. Assess the specifications for concrete slab on ground provided in Appendix 4b for compliance with relevant parts NCC/BCA Volume 2 and/or AS2870. Ensure you include the number of the relevant clause, figure or table where the information was found.
c. Suggest a suitable termite protection system and explain how it would be installed. Min 200 words
d. Prepare a procedural plan with a checklist for the preparation and placement of the above concrete slab on ground design.Use the checklist template provided in Appendix 5.
Include inspection items such as BCA requirements, project requirements such as dimensions and quality requirements such as level and square.
Required Resources
• NCC Volume 2, Part 3.2.
• NCC Volume 2, Part 3.1.3.
• Guide to Standards and Tolerances 2007

Part 4 - Sub-Floor Framing
a. Design a sub-floor systemthat complies with AS 1684 Timber framed construction. Fill out theSub-Floor Framing Scheduleprovided in Appendix 6.
b. Yellow Tongue Flooring is used Therefore assume 450 joist centres.
c. Sketch your sub-floordesign on copies of the floor plan.Show the layout of the stumps and bearer and joistspacing.
d. Plan the laying procedure of the platform flooring. Prepare a mark-up drawing where you show every individual sheet and the order in which it is to be laid.
e. Prepare a procedural plan with a checklist for the construction of the sub-floor including a platform floor.Use the checklist template provided in Appendix 5.
Include inspection items such as requirements of AS1684, project requirements such as dimensions and quality requirements such as level and straight.

Part 5 - Wall Framing
a. Prepare a schedule for the entire wall framing members outlining the section sizes and stress grades. Fill out the Wall Framing Schedule provided in Appendix 7.
b. Design a bracing system for this dwelling. Draw on a copy of the floor plan suitable locations for wall bracing and tie-downs, show all your workings.
• Design bracing for wind classification N2
• Assume wind direction 1 is in the south facing Comes from the South)
• Assume wind direction 2 is east facing (Comes from the east)
c. Prepare a procedural plan with a checklist for the construction and installation of a timber wall frame. Include acceptable tolerances and allowances.Use the checklist template provided in Appendix 5.

Required Resources
• AS 1684 Residential Timber Framed Construction
Part 6 - Roof Framing
Trusses
a. On the roof truss layout plan found on the StudentWeb, label each individual type of truss used in the formation of the entire roof system. Mark up the required truss fixings and the required bracing
b. Prepare a procedural plan with a checklist for the erection and installation of timber roof trusses.Use the checklist template provided in Appendix 5.
Required Resources
• AS 4440 - Installation of nail-plated timber roof trusses
• Gang-Nail - Fixing and Bracing Guidelines for Timber roof Trusses

Part 7 - Roof Claddings
a. Prepare a procedural plan with a checklist for one (1) roof cladding system.Include inspection items such as requirementsfor sarking, flashing, fixing and minimum pitches.
Use the checklist template provided in Appendix 5.
Required Resources
• Refer to manufacturers specifications
• NCC/BCA Volume 2

Part 8 - Wall Claddings
a. Assess the structural performance of two (2) external wall claddings systems if they were built within 1km of breaking surf and the wind classification N2.
Select one (1) masonry system and one (1) other cladding system from the list below:
• Brick veneer
• Concrete blocks
• Coatings over base materials
• Colorbond or Zincalume sheeting
• Fibre cement
• Plywood sheeting
• Weatherboards
b. Prepare a procedural plan with a checklist for the installation of the two cladding systems selected in Part a.Use the checklist template provided in Appendix 5.
Required Resources
• Refer to manufacturers specifications
• Refer to NCC/BCA Volume 2

Part 9 - Windows and Doors
a. Prepare a checklist to ensure the windows and external doors are installed to ensure compliance with relevant codes, manufacturer specifications and accepted industry construction principles.Use the checklist template provided in Appendix 5.
Include inspection items such as fixing and flashing requirements.
b. Provide a sketch illustrating how a window should be installed and flashed for a particular cladding system.

Attachment:- Low and Medium Rise Revised.rar

Reference no: EM132857658

Questions Cloud

What is the probability of particular lemming : Suppose that the lemmings can sometimes crawl back up the cliff. In particular, suppose that a lemming at the bottom climbs back up with a probability 0.1 each
How fixed and variable costs can differ based upon industry : How fixed and variable costs can differ based upon the industry. Which would you prefer to have more of in terms of expenses (fixed or flexible)?
Construct a confidence interval for the proportion : Using a confidence level of 96 percent, construct a confidence interval for the proportion of all young executives who find paisley ties fashionable.
Motivation-ergonomics or mental processing : How you would you want this job to be redesigned to place more emphasis on efficiency, motivation, ergonomics, or mental processing?
Prepare a procedural plan : Prepare a procedural plan with a checklist for the preparation and placement of the above concrete slab on ground design.Use the checklist template provided
What percentage of the widget weights lie : a) 99.7% of the widget weights lie between what oz and oz b) What percentage of the widget weights lie between 30 and 70 ounces?
How were the people arranged in the physical environment : Did the members share a sense of identity with one another (characteristics of the group, similarities, interests, philosophy, and so on)?
Explain some methods for creating employee incentives : Explain some methods for creating employee incentives so as to alter behavior and provide excellent customer service.
What is the mean of tossing a one coin : What is the mean of tossing a one coin, tossing 2 coins and tossing 3 coins?

Reviews

Write a Review

Project Management Questions & Answers

  Create a project schedule and align resources

Create a project schedule and align resources, Analyze project schedule and resource allocation

  Managerial roles and gap analysis

Write a report on Managerial Roles and Gap Analysis

  Questionaire on project management

Questionaire on Project Management

  Describe the market growth rate for product

Describe the market growth rate for product and service.

  Prepare a work plan and project schedule - gantt chart

Design an online system for the human resources department to manage available job positions.

  Project risk management approach

How does a project risk management approach pro-vide an early warning signal for impending problems or issues

  Black-scholes options pricing model

Calculate the payoff and the profits for investments

  Describe the features or characteristics of product

Describe the features or characteristics of your product or service.

  Write paper on inventory management system

Write paper on Inventory Management System.

  Analysis of the overall project risk

Analysis of the overall project risk

  Investment and performance analysis

Evaluate the usefulness of ROCE

  Distribution strategy and project management

Distribution strategy and project management

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!