Prepare a fire safety schedule for the building

Assignment Help Other Engineering
Reference no: EM132640803

Q1
Prepare a fire safety schedule for the building described below based on the requirements of BCA 2019. State any assumptions that you need to make.
High rise apartment block that constitutes two towers on top of a common 3 level basement carpark. Tower A is 5 storeys with retail on Ground Level, a function centre without fixed seating for 600 people on Level 1 and residential apartments up to Level 5. Tower B contains Retail on Ground Level and Level 1, residential apartments on Levels 2 to 9 and a cocktail bar on Level 10.

Q2
Use AS 2118.1-2017 to determine the hazard classification for a sprinkler system in building described below (for all areas of the building) and tabulate the design criteria including:
- the number of sprinkler heads assumed to activate in the area of operation,
- the activation temperature of the sprinklers,
- the minimum operating pressure for the sprinklers
- the discharge density
By calculation, determine the water storage requirements for the automatic fire sprinkler system (the size of the sprinkler tank). You may assume that the water supply to serve the fire hydrant system is required to have an effective capacity of 25,000 L. Use the attached pressure and flow inquiry results for details of the street main supply.
Determine the pressure required at outlet of pump. Assume that the pressure loss for pipes and elbows to distribute water from the riser to the hydraulic most disadvantaged point on each floor is 54 kPa.
The building is located on a university campus and consists of multiple uses as per below:
- Basement B1 and B2 - Carpark
- Ground Level - Retail (food outlets, Café, news agency, travel agent and book store)
- Level 1 - Small tutorial rooms
- Level 2 - Large lecture theatres
- Level 3 - Small tutorial rooms
- Level 4 - Offices
- Level 5 - Offices
- Level 6 - Cafeteria and Restaurant
- Level 7 - Offices
- Roof - Plant rooms
The building has a footprint of 1,800 m2. The slab to slab height on each Level is 3.2 m. Please show all
your working and calculations.

Q3
Your company has been approached to provide the maintenance services in a brand new three storey shopping centre over the next 12 years. Briefly explain your proposed maintenance regime for the following fire safety systems (what will be done and how often). Your client isn't too concerned with the nitty gritty of absolutely everything that will go on, but needs a high level understanding of your proposal to be able to justify approving your fees.
• Stair pressurisation system (including motorised relief air openings)
• Passive fire protection including fire walls, fire doorsets, fire shutters, and fire dampers
• Emergency lighting and exit signs
List any documentation, plans or specifications that you will require in order to undertake your role.

Attachment:- Notes.rar

Reference no: EM132640803

Questions Cloud

What is difference between internet and internet : What is the difference between internet and Internet? Name the four basic network topologies, and cite an advantage of each type in your own words?
Gain majority control of semen gresik : Why do you think Cemex decided to exit Indonesia after failing to gain majority control of Semen Gresik? Why is majority control so important to Cemex?
Government planning vs. entrepreneurial innovation : Find a peer-reviewed scholarly journal article discussing government planning and/or entrepreneurial innovation.
Cemex fdi in the country : Do you think Indonesia's best interests were served by limiting Cemex's FDI in the country?
Prepare a fire safety schedule for the building : Prepare a fire safety schedule for the building described below based on the requirements of BCA 2019. State any assumptions that you need to make.
Mostly focusing on mobile networks : We're looking at wireless networks, mostly focusing on mobile networks. Mobile networks in a global economy can be a challenge for multiple reasons.
What are top management chief characteristics : What are top management's chief characteristics in terms of knowledge, skills, background, and style? If the corporation has international operations
Determine the success or failure of airbnb : What recommendations would you make to Airbnb to improve its competitiveness in the accommodation market while mitigating any current and future risks?
Business intelligence and analytics : Compare artificial and biological neural networks. What aspects of biological networks are not mimicked by artificial ones? What aspects are similar?

Reviews

Write a Review

Other Engineering Questions & Answers

  Discuss an industry - ride sharing company

Describe the need for providing wide access to the planning documents while securing the sensitive content of the disaster recovery plans

  Design and testing of wind turbine Assignment

Design and testing of wind turbine Assignment Help and Solution - Kingston University London, Assessment Writing Service -

  Is risk management part of engineering asset management

ENGG958 Life Cycle and Risk Management Assignment 4: A workplace-based report. What are the risks or risk categories that engineering asset management have to deal with? Is risk management part of engineering asset management? What key issues of risk..

  Make a program that will determine the number of terms

write a program that will determine the number of terms in the series that are needed to approximate the function to a specified accuracy. Prompt the user to enter values for x and for an epsilon, where epsilon is the accuracy desired. Use a funct..

  What is the estimated effective green time

The lost time is known to be 4 seconds for each phase. If the cycle length is 60 seconds, what is the estimated effective green time of the fourth phase?

  Project - inspection quality problem using dmiac

Project 1: Inspection quality problem using DMIAC. Subject: delay inputing out the material if their is a quality failure. Problem: After a quality inspection failure, the company sending email to the client waiting to get replay to take the respons..

  Details of asta programme and progress reporting

Task- Details of ASTA Programme, Progress Reporting and Risk Simulation and list of relevant assumptions made for developing the ASTA programme of the project

  Prepare a report on quality function deployment

You need to prepare a report and presentation on the given case study. I have the data for "Quality function deployment" but I need to do professional report and presentation.

  Discuss one of the osi layers and research it in-depth

Discuss one of the OSI Layers and research it in-depth,understanding of its operation can help a network security professional in the real world.

  Determine the power requirement of the compressor

It is desired to determine: the power requirement of the compressor and the temperature of the butane stream leaving the compressor

  Discuss the importance and advantages of using techniques

Discuss the importance and advantages of using these techniques. Provide an example of each technique.Data representation is the act displaying

  Straight line with the velocity

A particle moves in a straight line with the velocity shown in the figure. Knowing that x = -540 m at t = 0, (a) construct the a - t and x - t curves for 0

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd