Prepare a design proposal for a new infrastructure project

Assignment Help Civil Engineering
Reference no: EM133178815 , Length: word count:4000

N5E18 Civil Engineering Technology - Level 4 and Level 5 Higher National Diploma in Construction and The Built Environment

Assignment - Civil Engineering Technology

Learning Outcome 1: Explain the common methods and techniques used in civil engineering earthworks and substructures

Learning Outcome 2: Present a site safety plan, risk assessment and method statement for a given civil engineering activity

Learning Outcome 3: Evaluate a given civil engineering problem and propose a solution

Learning Outcome 4: Prepare a design proposal for a new infrastructure project

Assignment Brief and Guidance:

Scenario
You have recently been employed by a large civil engineering company. They are looking to update the website on the role of professional civil engineers, their essential involvement in the construction and maintenance of infrastructure, and the key technologies they apply. The technologies and processes of civil engineering, in the development of highways, bridges, substructure and superstructure, are crucial to support contemporary societies.

Task 1
You have been requested by your manager to produce a report which can be used to provide clear information for the new website. The report should analyse and evaluate by

(i) Discuss earthworks activities, equipment and techniques
(ii) Describe methods and techniques used to create complex foundations, piling works and drainage works.
(iii) Describe methods and techniques used in culvert construction, underpass construction, provision of underground utilities.
(iv) Analyze methods and techniques used in large complex earthmoving operations and deep excavations.
(v) Evaluate methods and techniques used to deal with issues of ground and slope stability.

Task 2
The company place health and safety at the top of their priority list and are dedicated to continually improving health safety standards on site and amongst the workforce. The main areas the company is focusing on are excavations, working in confined spaces, working on structures and working temporary works.
(i) Identify the hazards, risks and safety arrangements associated with these activities
(ii) Develop and present a site safety plan, risk assessments and method statements for a selected activity
(iii) Discuss health & safety legislation and codes of practice related to civil engineering sites.
(iv) Justify a site safety plan, risk assessments and method statements report for activities related to a given civil engineering project.

Assignment Brief 2:

Scenario
You have recently been employed by a large civil engineering company. The company have been working with a client who has several possible projects under consideration. For a given civil engineering project: (agreed with tutor)

Task 1
(i) Evaluate the environmental, quality, geotechnical and economic contexts of the project.
(To Be Provided in class)
(ii) Propose a suitable solution to the problem, demonstrate how the environmental, geotechnical, quality and economic contexts of the problem are addressed and justify the selection of specific features in the development of the solution.
(To Be Provided in class)

Task 2
Your manager has given you a specific project to work on, (tutor to provided infrastructure project details)

(i) Describe methods and techniques used in highway design and techniques used to create bridges such as : Analysing methods and techniques used to create bridge foundations, flexible highway construction foundation criteria and related geotechnical parameters, methods and techniques used to create flexible highways, methods and techniques used in highway link and junction design and describe flexible pavement design.

(ii) Develop a civil engineering design proposal for a new infrastructure project and justify the selection of specific features in the development of the solution.

Attachment:- Civil Engineering Technology.rar

Reference no: EM133178815

Questions Cloud

Improving quality management in organizations : Search online for the case study "Case Study on Improving Quality Management of W Company's New Product Development Project"
Human nature and the nature of society : Optional, Watch: de Vries, M.K. (November, 2013). When Leaders Turn Bad. TEDx. Retrieved from youtube
What is the maximum lease payment acceptable to scout : The corporate tax rate is 25%, and the Scout can borrow at 9 percent to finance the equipment. What is the maximum lease payment acceptable to Scout
Describe the role of the agent : Describe the role of the agent and other real estate personnel in providing property appraisals, price ranges and rental recommendations for clients
Prepare a design proposal for a new infrastructure project : Present a site safety plan, risk assessment and method statement for a given civil engineering activity - Evaluate a given civil engineering problem and propose
What is the machine internal rate of return : Henrie's estimated the new machine would increase the company's cash inflows, net of expenses, by $40,000 per year. What is the machine internal rate of return
What is the company price-earnings ratio : Assuming a share of McDonald's common stock has a market value of $40, what is the company's price-earnings ratio
How will the interest be taxed to missy : Mary transfers assets that yield interest income of $2,300 each year to her daughter, Missy, age 12. How will the interest be taxed to Missy
Diagnose the type of failure based on the service history : Discuss the methods to increase the life of the component - The tool operated with extreme torque variation, creating multiple cracks at the external diameter

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd