The objective of the term project assignment is to prepare a Cost Estimate Proposal for constructing a single story residential building (Johnson Residence). Must approach the assignment from the perspective of a construction contractor attending a bid, and prepare a professional cost estimate proposal using their knowledge, skills and common sense. This requires proper efforts with regards to:

  • Reading and understanding plans;
  • Recognizing construction work items;
  • Surveying the quantity for various types of work;
  • Using cost databases to acquire cost of construction efforts;
  • Estimating indirect and total cost of construction; and
  • Submitting and presenting a professional proposal of their cost estimation.

Follow the CSI MasterFormat (2004 Edition) in organizing the cost estimate proposal. Use the R.S. Means Online website to get cost data for all identified work items.

This section describes the minimum scope of work required in this project. This includes items from the Following 14 CSI MasterFormat divisions:

Division 01: General Conditions and Requirements

  • Identify all general requirement items that should apply to this job, assuming 12 month duration for entire construction. Students are encouraged to make reasonable and justifiable assumptions based on common sense and regular construction practices to cover any missing information.

Division 03: Concrete (for Slab, Footings, and Foundations)

  • Concrete forming and reinforcing steel, including required accessories (use separate cost items).
  • Concrete placement (including curing and finishing, wherever applicable).

Division 04: Masonry

  • Masonry units (including mortar, if needed).

Division 06: Wood

  • Roof framing structure (prefabricated truss system) and sheathing.
  • Floor structure.

Division 07: Thermal and Moisture Protection

  • Below-grade moisture protection (primer, vapor barrier, protection board, coving material, etc.).
  • Walls (interior and exterior) and ceiling thermal insulation. Use R-11 insulation for interior walls.
  • Roof Shingles.

Division 08: Openings

  • Doors and Windows.

Division 09: Finishes

  • All wall, flooring and ceiling finishes (See Finish Schedule posted on Canvas).

Division 11: Equipment

  • Residential appliances such as kitchen equipment, washers and dryers, etc.

Division 31: Earthwork

  • Structural excavation and backfill (with compaction) of the whole building area, considering 3 ft. working area all sides, excavation depth of 3 ft. and excavation slope of 1:1.

Division 32: Exterior Improvements

  • Site fencing, sidewalks and driveways.

The final report must be submitted as a single PDF file organized in the following sections:

Cover Sheet: Your information and title of the report.

Proposal Summary Sheets: summary table of cost estimates in both CSI MasterFormat and AST Uniformat II. (see spreadsheet templates posted on Canvas).

Separate section for each CSI division, consisting of:

Summary sheet including cost items identified for the division. The description of each item should be clear and written to describe the work item not the description of the RS Means item used for pricing (see cover table template on Canvas),

Estimated cost of items and divisions, included in the above summary table.

List of all the assumptions made in order to complete the quantity takeoffs, and

Typed takeoff calculations of all quantities included in the estimate or a scanned copy of neatly written and properly-organized handwritten takeoff calculations. You should:

  • Keep calculations neat and clear.
  • Separate calculations of different items using lines and titles.
  • Mention name of methods that you used in calculations (if applicable).
  • Show proper and adequate comments for your calculations.

In addition to the PDF file, the Microsoft Excel file used to develop the cost summary sheets mentioned above should also be submitted.

Attachment:- Assignment Files.rar

Reference no: EM132319493

Questions Cloud

Original beetle-product differentiation : What was VW's strategy with its original Beetle-product differentiation, low cost of focus? Which strategy did VW implement with its new Beetle?
Explain the role of the marketing department : Select a health care provider with which you are familiar and determine the role of patient-centered care by that provider, its impact, and the best way.
Quantity of labor supplied and demanded : What is the impact of a minimum wage above the equilibrium wage on the quantity of labor supplied and demanded? (Practice drawing a supply
What types of protections do you have on your computers : What types of protections do you have on your computers? We use antivirus software, but that's about it. We all trust each other so we don't use passwords.
Prepare a Cost Estimate Proposal for constructing building : The objective of the term project assignment is to prepare a Cost Estimate Proposal for constructing a single story residential building (Johnson Residence)
What are the components of gnh and gdp : What are the components of GNH and GDP? Which measure,GDP or GNH, is easier to compute?
Identify and summarise the current accounting policies : Identify and summarise the current accounting policies relating to research and development and the development of technology
How did you arrive at the recommendations : Consider the following restaurants: Pizza Hut, Popeyes, and Taco Bell. When conducting a review on any business, the first thing that needs to completed.
Determine the cost of timber sold related to depletion : If Blossom plants five seedlings at a cost of $4 per seedling for each tree cut, how should Blossom treat the reforestation?

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd