Reference no: EM131255105
Rochester Manufacturing's Process Decision
Rochester Manufacturing Corporation (RMC) is considering moving some of its production from traditional numerically controlled machines to a flexible manufacturing system (FMS). Its computer numerical control machines have been operating in a high-variety, low-volume manner. Machine utilization, as near as it can determine, is hovering around 10%. The machine tool salespeople and a consulting firm want to put the machines together in an FMS. They believe that a $3 million expenditure on machinery and the transfer machines will handle about 30% of RMC's work. There will, of course, be transition and startup costs in addition to this.
The firm has not yet entered all its parts into a comprehensive group technology system, but believes that the 30% is a good estimate of products suitable for the FMS. This 30% should fit very nicely into a "family." A reduction, because of higher utilization, should take place in the number of pieces of machinery. The firm should be able to go from 15 to about 4 machines, and personnel should go from 15 to perhaps as low as 3. Similarly, floor space reduction will go from 20,000 square feet to about 6,000. Throughput of orders should also improve with processing of this family of parts in 1 to 2 days rather than 7 to 10.
Inventory reduction is estimated to yield a one-time $750,000 savings, and annual labor savings should be in the neighborhood of $300,000. Although the projections all look very positive, an analysis of the project's return on investment showed it to be between 10% and 15% per year. The company has traditionally had an expectation that projects should yield well over 15% and have payback periods of substantially less than 5 years.
Discussion Questions
1. As a production manager for RMC, what do you recommend? Why?
2. Prepare a case by a conservative plant manager for maintaining the status quo until the returns are more obvious.
3. Prepare the case for an optimistic sales manager that you should move ahead with the FMS now.
Contrast the five as of information security
: 1. Explain and contrast the five As of information security. 2. Explain the concept of sloppy code versus secure code as presented in the textbook, and give examples that illustrate each concept.
|
Prepare a flowchart for the registration process at a school
: Prepare a service blueprint for one of the activities in given Problem. - Prepare a flowchart for the registration process at a school.
|
Develop an annotated bibliography that lists
: Develop an annotated bibliography that lists at least 10 sources. After each source, you should in no more than 75 words, briefly summarize the argument of the source and assess how useful the source is for proving your thesis statement or for mak..
|
Philosophy of software engineering
: 1. List the key issues stressed by an agile philosophy of software engineering? 2. Describe the three key assumptions regarding software projects that every agile software process must address? 3. List the key attributes of an effective software term..
|
Prepare a case by a conservative plant manager
: As a production manager for RMC, what do you recommend? Why? - Prepare a case by a conservative plant manager for maintaining the status quo until the returns are more obvious.
|
Process strategy at wheeled coach
: Why do you think major auto manufacturers do not build ambulances? - What is an alternative process strategy to the assembly line that Wheeled Coach currently uses?
|
Standardization and naming conventions
: Managing Files and the World of Windows" Please respond to the following: Take a position on whether or not standardization and naming conventions are critical for properly managing files and folders in a Windows environment. Include at least one..
|
Amount of network bandwidth
: Write at least a two page paper in current APA format that provides a comparison of the different capabilities of each selected web server, the maximum number of connections each can support, and the amount of network bandwidth needed to fulfill t..
|
How is fedexs location a competitive advantage
: How is FedEx's location a competitive advantage? Discuss. - Why do so many U.S. firms build facilities in other countries?
|