Preliminary design for a road to access a rural property

Assignment Help Civil Engineering
Reference no: EM132684526

Using the plan provided, and meeting the criteria set out below, you must make a preliminary design for a road to access a rural property. The new road must run from its junction with Tucker's Road and must end inside the parking area (labelled P) at exactly the R.L. specified and must not be longer than 520m. Also, a survey party will undertake a final survey on your behalf and you are to provide them with instructions for any extra data to be collected as well as data to allow them to set out the road.

Plan Provided

The plan provided was drawn at a scale of 1:2,000 with a contour interval of 5m.

While every effort was made when scanning the plan, and recognising possible printer variations, you MUST CHECK the scale of your print. As well as the bar scale showing 100m, there are three lines, for which precise distances have been given. Measure each of the four lines at a scale of 1:2,000, show these measurements in your answer sheet and compute a correction factor for your plan. State this factor and use it when you measure the lengths of your straights.

Assume that the contours are correct with 90% confidence.

Horizontal Alignment
The first straight is shown in red and the first Intersection Point (IP) must be at the end of the red line.
You must draw two more straights to complete the road alignment. These straights must allow the road to be designed to meet the requirements of the vertical design as listed below. Also, the area of land adjacent to the creek, which runs to the river, that is bounded by the 15m contour line, the river and the two dashed lines is prime agricultural land and the road is not permitted to go through this area.
Use a protractor to find the bearing of the first straight and then measure the deflection angle for each curve to the nearest degree. Use Tucker's Rd with its bearing of 0o, as your azimuth.
Scale the distances from Tucker's Rd to IP1, IP1 to IP2 and IP2 to the End, to the nearest metre. For the purposes of the calculations for the preliminary design, the scaled lengths (00 - IP1, IP1
- IP2 and IP2 - END) must be adopted as the design length of each straight to a precision of two decimal places.
Each horizontal curve is to have radius of 61m.
Calculate the tangent distance and arc length for each curve and show them in the table of answers.
Calculate the chainages of each of the four TPs and any other points listed and show them in the table of answers.
On your plan, plot each curve. (Calculating the external distance will give you a third point to help you draw the curve freehand.) Also clearly show the lengths of each straight (IP - IP) and the bearing of that straight.

Please calculate the data needed to set out each horizontal curve from its first TP by deflection angles and long chords for points at 15m running chainage along the road as well as the crown of each curve. (i.e. 120, 135, 150, 165 ... 360, 375, 390, 405, as they fall within each horizontal curve.

Vertical Alignment
Using the contours on the map provided, draw a longsection of the Centre Line of your road at scales; horizontal 1:2,000 and vertical 1:200. (Please read the submission section for detailed guidance about drawing the longsection.)
Design a vertical alignment of the centre line of the road showing grades and vertical curves. The vertical alignment must meet the following criteria:

The road must start at RL 15.4 and must finish at exactly RL 33.0. This final grade of your road into the parking site must be between +2.0% and +0.5%. The maximum grade allowed at any point along the road is 10%.

Vertical curves must have lengths of 60m or 80m only. In exceptional circumstances, a VC of 40m length may be permitted but you will need to explain why it must be used. The IP of each vertical curve must be located at an even 10m chainage (i.e. 120, 350 etc. and must not be placed at odd locations such as 376.5). All grades used must be to no greater precision than 0.1%, except for the final grade to the end of the line. (i.e. grades such as 3.1% must be used for every grade, except the final one where additional decimal places must be shown, where necessary, to ensure that the Design RL meets the set RL of the parking area).

Every change of grade requires a vertical curve. (Assume that your road will meet Tucker's Road at the nominated RL and can start at any grade you wish to use. No vertical curve will be needed at this road junction.)

Cut and Fill

Except for the two locations specified, the vertical design should keep cut and fill to less than 1m in depth. Working by eye, and not mathematically, try to balance cut and fill along the road.

Between the two banks of the river, your road must be between 1m and 2m above the bank R.L., so that precast box culverts can be installed. For no more than 15m either side of the 30m contour line, a cut of up to 2m is permitted.

Complete the table with your vertical curve calculations for the design levels.

Calculate the Design Levels for the locations as specified: every 30m of running chainage along the road, where there is NO vertical curve; (i.e. 0, 30, 60, 90 ...300, 330, 360 etc. ... and the end of the road). For every vertical curve, please calculate the Design Levels at every 10m from VC TP to VC TP.
Also calculate the chainage (to 2 d.p.) and RL of the low point of the road at the river crossing.
Watercourse Information
The banks of the creek where the road crosses it are at R.L. 11.0
Precision of Calculations Needed
On your plan, please show the bearings of the straights to the nearest degree only and the distances IP to IP should be shown to the nearest metre.
For the horizontal curve setting out data, please calculate the arc lengths and long chord distances to two decimal places of a metre and the setting out deflection angles to the nearest 10".

All levels on the longsection table must be correct to two decimal places. The grades you nominate for the road design must be to no greater precision than one decimal place, except for the final grade, and all R.L.s must agree perfectly with the grade shown. Your road must end exactly at R.L. given for the parking area.

Survey Party Instructions
A survey party has run an EDM traverse point A, (whose coordinates are 300.000m E, 600.000m N) on the centre line of Tucker's Road via point Y, to a point X which is close to the parking area P. Calculate the coordinates of point X. Also, using your bearings and distances of each straight of your road, calculate the bearing and distance for the survey party to set out the end of your road from point X.

The curve set out data has already been requested.

Finally provide instructions to the survey party for any extra information needed or areas to checked for you to be able to finalise your road design.

Attachment:- spring design.rar

Reference no: EM132684526

Questions Cloud

Web-based resources to develop portfolio : Utilize various web-based resources to develop a portfolio that contains a minimum of five activities and five strategies
How do you know your article choice is credible : Explain how you were able to narrow down the number of article hits you had initially, and present within your post a summary of the credible article you chose.
Journalize the summary entry to record direct labor costs : At the end of March, both the Hedge Bank and Sullivan Airlines campaigns were completed. Journalize the summary entry to record direct labor costs
Social studies activities on mastery learning basis : Dolly Davis is a fourth-grade teacher who has set up her social studies activities on a mastery learning basis.
Preliminary design for a road to access a rural property : Preliminary design for a road to access a rural property. The new road must run from its junction with Tucker's Road and must end inside the parking area
What is the best mix of products to maximize revenue : SafeCo makes three types of roll bars for the off-road enthusiasts. Their PrimoBar is their top-of-the-line product and sells for $385.
Explain the strengths and weaknesses of each policy : Differences in cultural beliefs, subcultures, religion, ethnic customs, dietary customs, language, and a host of other factors contribute to the complex.
Compute how is british subsidiary gross margin percentage : Compute how is British subsidiary's 20X2 gross margin percentage, based on its U.S. dollar financial statements, likely to compare to gross margin percenta
Create portfolio and interview for jobs : As you create a portfolio and interview for jobs, you will often be asked to provide your teaching philosophy.

Reviews

Write a Review

Civil Engineering Questions & Answers

  What is the average length of queue

What is the average length of queue, the average time spent in the system, and the average waiting time in the queue?

  Determine what is the max length of the slotted region

a rectangular bar of length l has a slot in the middle half of its length. the bar has width b, thickness t, and modulus of elasticity E. the slot has a width b/4. the stress in the middle region is 24000 psi, the length is 30 in, andthe modulus o..

  Find the mass flow rate assuming compressible adiabatic flow

Find the mass flow rate, assuming compressible adiabatic flow. Repeat this calculation for incompressible flow

  Find the angular acceleration of the plate at the instant

An external moment of magnitude 110 N-m is applied in the counter clockwise direction as shown. A frictional moment of magnitude 10 N-m resists the rotation. The specific weight of the material is 250 lbs / ft3.

  Estimate the ground- level concentration at a distance

A point source with effective stack height of 50 m emits 80 g/s of on a clear summer day with surface winds at 4 m/s. Winds at 50 m are 5 m/s. An inversion layer starts at an elevation of 250 m.

  Draw all aldehyde and ketone isomers of c6h12o

What is the reaction that occurs with hexanal and propanol (give both the hemiacetal and acetal products)?

  Find the dimensions a and b

These forces are equivalent to the force R = 8j lb acting at the tip of the drill and the couple CR = -120j lb · in. Determine the dimensions a and b.

  Determine the crest height of a suppressed weir that should

A weir is to be installed to measure flows in the range of 0.5 to 1.0 m3/sec. If the maximum (total) depth of water that can be accommodated at the weir is 1m and the width of the channel is 4m, determine the crest height of a suppressed weir that sh..

  Determine the seepage velocity-v through the sample

The cross-sectional area of the sample was 60 cm2 and its length was 150 mm. For 80 cm3/min steady-state flow rate, a total head difference of 8 cm was measured across two points separated by 10 cm along the axis of the sample.

  Compute and tabulate the notes for an equal-tangent vertical

Compute and tabulate the notes for an equal-tangent vertical curve, at half stations, that passes through the midpoint of the 0.90% grade.

  What are the irreversibility and the second-law efficiency

A heat exchanger increases the exergy of 3 kg/s water by 1650 kJ/kg using 10 kg/s air coming in at 1400 K and leaving with 600 kJ /kg less exergy. What are the irreversibility and the second-law efficiency?

  Calculate relative velocity of solute front through aquifer

Calculate the relative velocity of a solute front that is flowing through an aquifer. The organic carbon partitioning coefficient (Koc) is 6 mL/g and the friction of organic carbon in the soil is 2%.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd