A study was conducted to investigate the relationship between the cost, y (in tens of thousands of dollars), per unit of equipment manufactured and the number of units produced per run, x. The resulting equation for the line of best fit is given below, with x being observed for values between 10 and 200. If a production run was scheduled to produce 80 units, what would you predict the cost per unit to be in dollars?
= 7.56 - 0.01x $
Suppose you are traveling on business to a foreign country for the first time. You do not have a bus schedule or a watch with you. However, you have been told that buses stop in front of your hotel every 20 minutes throughout the day. If you show ..
LINEAR PROGRAMMING MODELS
The student body of a large university comprises 60% female students. Elucidate what is the probability that the students in the sample exactly two are female?
Where should the warranty limits be set so that only 10 percent of the HDTVs need repairs at the manufacturer's expense?
Following a lognormal distribution with a mean of 3000 rpm and std deviation of 0.87, what if the boss want a 5% chance of HW failure before selling, how often would I have to replace this hardware ?
The times it takes workers to complete a task at a certain assembly plant are normally distributed with mean = 10 minutes and standard deviation = 2 minutes.
You're operating a business in very competitive market. You're not yet the dominant player, but you have invested heavily in marketing and product development and it has paid off with a steady growth rate of 10%.
A manufacturer of printed circuit boards uses exponential smoothing with trend to forecast monthly demand of its product. At the end of December, the company wishes to forecast sales for January.
Create a bell curve chart that shows the number of men needed per day for a 10,000 man hour job. The start date is 1/1/2008 and the end date is 6/1/2008.
Compute the variance and standard deviation of the number that will arrive within two days.
Out of 1000 people surveyed, 600 belonged to urban areas and rest to rural areas. Among 500 who visited other states , 400 belonged to urban areas. Test 5 % level of significance whether area and visiting other state are dependent.
For one of the first statistics exam, the coefficient of determination between hours studied and the grade earned was 80 percent. The standard error of estimate was 10.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd