A 600 MWe power plant has an efficiency of 36% with 15% of the waste heat being released to the atmosphere as stack heat and the other 85% taken away in the cooling water. Instead of drawing water from a river, heating it, and returning it to the river, this plant uses an evaporative cooling tower wherein heat is released to the atmosphere as cooling water is vaporized. At what rate must 15oC makeup water be pumped from the river to offset the water lost in the cooling tower?

Reference no: EM1383474

Questions Cloud

Discharged of wastewater to aquifer : Wastewater is discharged into an aquifer. This wastewater contains 0.1 ppm atrazine (a common herbicide). The MCL of atrazine is 5 ppb, the density is 1.19 g/mL and the solubility is 50 ppm. 500 ft away from the plant effluent there is a permeable..
Seepage velocity and estimating hydraulic gradient : The dye appears 14 days later in an observation well 75 ft away from the injection point. Compute the seepage velocity and estimate the hydraulic gradient in the aquifer if the porosity of the soil is 42%.
Tightening of bolt in the friction grip : What difference does the tightening of bolt in the friction grip joint make to the load at first slip and the failure load.
Determine the volume flow rate of water : Water with a static pressure of 1.96kN/M 2 flows through an 800 mm diameter pipe. A pitot tube pressure gage in this pipe reads a pressure of 5.88 kN/M 2 . How do you determine the volume flow rate (Q) of the water? (Q = 1.40 M^3/sec, V=2.79 M/se..
Power plant efficiency problem : A 600 MWe power plant has an efficiency of 36% with 15% of the waste heat being released to the atmosphere as stack heat and the other 85% taken away in the cooling water.
Uva levels in raw and treated drinking water : My question is regarding UVA levels in raw and treated drinking water with regard to TOC and DOC removal. Is there a jar test procedure that incorporates the UVA values of the various stages of treatment and is there a document you could refer me ..
Dissolved inorganic carbon sample : The total dissolved inorganic carbon (TIC) of a sample of groundwater is 8.33 mM. The temperature of the aquifer is 15C, the pH is 7.5, and the ionic strength is 0.05 M. What is the H2CO3, HCO3-, CO3 2-, and the partial pressure of CO2? [Use activ..
Explain the resource-based view : Explain the resource-based view and its relation to strategic management. Identify at least three ways that this view differs from the I/O view.
What is looting describe in your own words : Explain in your own words the differences between a "for-profit" and a "not-for-profit" corporation. What is "looting?" Describe in your own words.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Designing ramp for the highest horizontal curve

the maximum degree of curvature can be at most 6.0 and the superelevation can be at most +6.0%. Design the ramp for the highest horizontal curve design speed given the constraints.

  Maximum safe speed around the curve

What is the maximum safe speed around the curve? If the speed limit on the roadway is 60mph, what action should be taken by the engineer?

  Thermo-gravimetry of calcium oxalate

Evaluate the percent mass loss for each of the three thermal events indicated on the attached TGA trace

  Difference between labor cost and labor pro-ductivity

Determine the number of man-hours required to form the structure using data from R. S. Means or other appropriate reference. What is the difference between labor cost and labor pro-ductivity?

  Rate of change in volume

A water tank has a height of 120m, and its area of cross-section is 2000m. Water is released from the tank and the water level drops by 1 meter every minute. Find the rate of change in volume.

  Magnitudes of fac and fad

The 70 m tall tower is supported by three cables that exert forces FAB, FAC, and FAD on it. The magnitude of the force FAB is 2 kN. The x and z components of the vector sum of the forces exerted on the tower by the three cables are zero. What are ..

  Description of the soil characteristics

For each of the horizons, provide a description of the soil characteristics and briefly describe the environment where you would expect to find the horizon?

  Darcy-weisbach equation for flow in a pressure conduit

In using the Darcy-Weisbach equation for flow in a pressure conduit, what percentage error is introduced in Q when f is misjudged by 20 percent?

  Structure project design in civil engineering

Land is extremely valuable in this area therefore to win this job you need to consider innovative approach to reduce the waste areas

  Width of the footing if factor of safety given

Characteristic values of the shear strength parameters of the soil are c'= 0, and f' = 400. Determine the required width of the footing if a factor of safety of 3.0 against shear failure is specified when the water table rise to foundation level.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Environmental soil cleaning company

How much money should an environmental soil cleaning company borrow to finance a site reclamation project if it expects revenue of $140,000 in the first year increasing by 3% per year over the 5-year cleanup period? The interest rate is 8%.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd