Reference no: EM13985358
1. Choose a three-dimensional LP maximization problem (n = 3) with two constraints (m = 2) of your own choice. Solve the problem by using the Excel Solver. Change your problem if it does not have a feasible solution. Otherwise, generate the Solver Answer Report and record the number of simplex iterations and the computer execution time in that report. Remember to select Simplex LP as the Solver's solution method when solving the problem.
2. Add another constraint to the existing constraints of the problem that you have chosen (m = 3). Repeat the steps described in #1. You may change your problem whenever a feasible solution does not exist, but make sure that n = 3 and m = 3 in your problem.
3. Repeat the previous steps for n = 3 and successive m values of m = 4, 5, and 6 by successively adding a constraint to the current collection of constraints.
4. Plot the number of simplex iterations (y) versus the number of constraints (m). Save your plot as a picture file, and upload it in your discussion thread.
5. Plot the computer execution time (t) versus the number of constraints m. Save your plot as a picture file, and upload it in your discussion thread. (Use four significant places after the decimal for t.)
Describe how the number of constraints and the required number of simplex iterations are related, according to your observations. Is this relation linear? Polynomial? Rational? Exponential? Furthermore, how are the number of constraints and the computer execution time related? Is this relation linear? Polynomial? Rational? Exponential?
What is the total resistance of the circuit
: Four 240-ohm lightbulbs are connected in series. What is the total resistance of the circuit? Express your answer using two significant figures.
|
Calculating the distributed random variables
: Suppose that X1, X2, X3, X4 are independent U (0, 1)-distributed random variables and let (X(1), X(2), X(3), X(4)) be the corresponding order statistic. Compute
|
A project has faced major difficulties in the quality
: A project has faced major difficulties in the quality of its deliverables. Management now states that quality is the most important project constraint. If another problem with quality were to occur, what would be the BEST thing for the project manage..
|
Problem regarding the distributed random variables
: 1. Let X1, X2, X3, and X4 be independent, U (0, 1)-distributed random variables. Compute
|
Plot the number of simplex iterations
: Plot the number of simplex iterations (y) versus the number of constraints (m). Save your plot as a picture file, and upload it in your discussion thread.
|
Calculate the magnitude of the magnetic field
: The electric field strength in the selector is 4.819 x 105 N/C. The atom passes straight through the selector without any deflection of its path. From the information above, determine the magnitude of the magnetic field, BI.
|
One very important decision that marketers
: One very important decision that marketers need to make is which channel of distribution to use for its products or services. Four primary considerations need to be analyzed before making the distribution choice: 1) Distribution coverage required; 2)..
|
Random variables with common distribution function
: Let X1, X2, . . . , Xn be independent, continuous random variables with common distribution function F(x), and consider the order statistic (X(1), X(2), . . . , X(n)). Compute E(F (X(n)) - F (X(1))).
|
Discuss the six forms of deferred compensation
: Discuss the six forms of deferred (stock) compensation. List and discuss four possible limitations of merit pay programs. Please discuss in detail and provide examples for each of the limitations
|