Reference no: EM133289779
Chapter 1 Planning of distribution network with DG units considering the network reconfiguration and reliability
As we have confirmed this is title of chapter 3. It can be seen from this title
1. Planning of distribution network with DG units- means we need say about optimal DG allocation (PV and WT based-PV unity power factor WT optimal power factor)
2. considering the network reconfiguration--- also something say about optimal reconfiguration
3. Reliability--- also some reliability indexes ( by using analytical method because simulation modeles not suitable for radial DS, maybe you can add this to results to compare analytical and Manto carlo method)
Objective will be
1. Power loss minimization
2. Voltage profile improvement
3. Reliability indexes such as, SAIFI, SAIDI and ENS I think enough.
So you can divided some cases this chapter . such as
1. Only DG allocation for above objectives
2. Only (static ) network reconfiguration for above objectives
3. Simultaneously DG allocation and NR for above objectives
Results will be tabled and objectives will be drawn
Chapter 2 Planning of distribution network with DG units and BESS considering uncertainty
Just here we will model all of PV and WT DG units with considering uncertainty (maybe by using Beta and Weibull PDF or other function)
Objective will be
1. Energy loss minimization ( I think for one day is enough to find year just multiple 365 days) or you can divided year to 4 season and get one day from each season to see their variablity
2. Voltage profile improvement ( for one day voltage profile graph is enough)
3. Cost indexessuch as, Investment cost of DG and BES
O&M Cost of DG and BES ( interest rate, inflation rate so on)
Purchased energy cost from grid
Generated energy cost by DG or BES
Emission cost
Chapter 3 Multi-objective planning of distribution network with DNR,DG units and BESS considering uncertainty
1. We need do dynamic network reconfiguration (dynamic NR will be done by clustering (divided one day to some cluster)
2. According to cluster DG output and BESS will be cluster ( If you have other idea better than cluster you can do)
Objective will be
1. Power or energy loss minimization
2. Voltage profile improvement
3. Reliability and cost indexes such as,.
SAIFI
SAIDI
??????I
ENS
AENS
Investment cost of DG and BES
O&M Cost of DG and BES ( interest rate, inflation rate so on)
Purchased energy cost from grid
Generated energy cost by DG or BES
ECOST
Emission cost
Switching cost
Power flow by backward and forward method
For chapter 3 and 4 single objective optimization algorithms can be applied such as PSO,GA,GWO,SSA so one you can select
But for chapter 5 must be multi-objective optimization algorithm such as MPSO,MOGA,MGWO,MSSA so one you can select
33 and 118 bus system.
for reliability evaluation need to consider, branch, bus, DG, fuse, connector's failure and repair time. Clustering uncertainty of RES AND Load with some snap scenarios like mentioned above thesis.
Attachment:- Distribution network.rar