Perform a risk assessment for the project

Assignment Help Civil Engineering
Reference no: EM133146250

Task - Civil Works Design

You are required to undertake a civil construction design project as outlined below. Your Assessor will take the role of the client for the purposes of this assessment task.

Design Specifications

1. The Problem
You are a civil designer working for the state department of transportation. You have been assigned responsibility for the design of a truss bridge to carry a two-lane highway across the river valley shown below.

1280_Civil Works Design.jpg

2. Design Objective
Satisfy all of the specifications listed below, while keeping the total cost of the project as low as possible.

3. Bridge Configuration
1. The bridge may cross the valley at any elevation from the high water level to 24 meters above the high water level.
2. If the elevation of the bridge is below 24 meters, excavation of the river banks will be required to achieve the correct highway elevation.
3. To provide clearance for overhead power lines (shown above), the highest point on the bridge may not exceed an elevation 32.5 meters above the high water level (8.5 meters above the top of the river banks).
4. The bridge may consist of either standard (simple supports) or (arch supports). If necessary, the bridge may also use one intermediate , located near the centre of the valley. If necessary, the bridge may also use cable , located 8 meters behind one or both abutments.
5. Each main truss can have no more than 100 and no more than 200 .
6. The bridge will have a flat, reinforced deck. Two types of concrete are available:
1. Medium-strength concrete requires a deck thickness of 23 centimetres (0.23 metres).
2. High-strength concrete requires a deck thickness of 15 centimetres (0.15 meter).
7. In either case, the deck will be supported by transverse spaced at 4 metre intervals. To accommodate these floor beams, your must have a row of joints spaced 4 meters apart at the level of the deck. These joints are created automatically when you begin a new design.
8. The bridge deck will be 10 meters wide, such that it can accommodate two lanes of traffic.

4. Member Properties
• Materials. Each member of the truss will be made of either carbon steel, high-strength low-alloy steel, or quenched and tempered steel.
• . The members of the truss can be either solid bars or hollow tubes. Both types of cross-sections are square.
• Member Size. Both cross-sections are available in a variety of standard sizes.

5. Loads
The bridge must be capable of safely carrying the following loads:
• Weight of the deck.
• Weight of a 5-cm thick , which might be applied at some time in the future.
• Weight of the steel floor beams and supplemental bracing members (assumed to be 12.0 applied at each deck-level joint).
• Weight of the main trusses.
• Either of two possible truck loadings:
• Weight of one standard H25 truck loading per lane, including appropriate allowance for the dynamic effects of the moving load. (Since the bridge carries two lanes of traffic, each main truss must safely carry one H25 vehicle, placed anywhere along the length of the deck.)
• Weight of a single 480 kN Permit Loading, including appropriate allowance for the dynamic effects of the moving load. (Since the Permit Loading is assumed to be cantered laterally, each main truss must safely carry one-half of the total vehicle weight, placed anywhere along the length of the deck.)

6. Structural Safety
The bridge will comply with the structural provisions of the state specified standards, to include:
• Material densities
• Load combinations
• Tensile strength of members
• Compressive strength of members

7. Cost
The cost of the design will be calculated using the following cost factors:
• Material Cost:
• Carbon steel bars - $4.50 per kilogram
• Carbon steel tubes - $6.30 per kilogram
• High-strength steel bars - $5.00 per kilogram
• High-strength steel tubes - $7.00 per kilogram
• Quenched and tempered steel bars - $5.55 per kilogram
• Quenched and tempered steel tubes - $7.75 per kilogram
• Steel Production(fabrication) Cost: $1000.00 per each steel pattern
• Connection Cost: $500.00 per joint
• Site Cost:
• Reinforced concrete deck (medium strength) - $5,150 per 4-meter panel
• Reinforced concrete deck (high strength) - $5,300 per 4-meter panel
• Excavation - $1.00 per cubic meter (See the Site Design Wizard for excavation volume)
• Supports (abutments and pier)
o $6,000 per anchorage
o $4,500 per abutment
o $1800 per 4 meters + $27,000 per pier

Required:

Part 1: (Design Analysis)

Refer to design model 1 document. Given the below forces:

Member

Compression Force (KN)

Tension Force (KN)

1

1828.26

0

2

2585.55

0

18

0

1292.78

Determine the horizontal and vertical components of reaction at the support.

Determine the forces in members 17, 19, 20, 16 and 21. State if the members are in tension or compression. Note that all angles are 45 degrees.

Part 2: (Estimation)

1. Make a detailed list of all constraints and requirements to the bridge design.

2. Three different materials available for the design of the bridge:
• Carbon steel,
• High-Strength Low-Alloy steel and
• Quenched and Tempered Low-Alloy Steel
Describe the differences between these materials. Which material is the best choice for a given structural design?

3. One of the most important decisions in the bridge design is the selection of a cross-section type, solid bar or hollow tube, for each member in the structural model.
At what locations should each type of cross section be used? (Hint: you should consider the effect of the different cross-sections on member strength in both tension and compression.)

4. A good engineer will try to find the best balance between the site cost (such site excavation, adding piers or cables) and the truss cost. Explain what is meant by this statement and provide some examples.

5. You are given two proposed designs that meet the design specifications. Estimate the total cost for each design and accordingly provide a recommendation on which model is more economical.

6. Foreach design model, addressits environmental impact on the surroundings such as the river channel.

7. Based on all your analysis (cost + environmental), which is the optimum design?

8. Perform a risk assessment for the project taking into account all lifespan stages:
• the existing conditions
• the application of the design
• maintainability of the works

Attachment:- Civil Works Design.rar

Reference no: EM133146250

Questions Cloud

Determine the amount of the impairment loss : Determine the amount of the impairment loss assuming that the estimated undiscounted sum of future cash flows is $7.4 million and fair value is $5.3 million
How marcia can improve employee ability : Discuss and explain how Marcia can improve her employee's ability, level of motivation and role perceptions critical influences on the team's performances.
Discuss the strategic management process : In your own understanding, briefly discuss the 3 Strategic Management Process. Provide an example for each.
Calculate the average issue price on november : Calculate the average issue price on November 30, 2020. Assume no shares were issued or repurchased after November 19, 2020
Perform a risk assessment for the project : Perform a risk assessment for the project taking into account all lifespan stages - addressits environmental impact on the surroundings such as the river
Civil society organisations differ from corporations : Civil Society Organisations (CSO) differ from corporations. How would these organisations (CSO and private corporations) differ in their approach to managing ch
Calculate amount of depreciation on manufacturing equipment : The equipment cost $14,000 and has an estimated useful life and MACRS class life of 7 years. Calculate the amount of depreciation on the manufacturing equipment
Conduct a secondary data search on key variables : You are planning to open a coffee shop in one of two areas in your local community. Conduct a secondary data search on key variables that would allow you to mak
What is the maximum discount rate : Now suppose that the cost of capital is only approximate. What is the maximum discount rate for which the project is still attractive

Reviews

Write a Review

Civil Engineering Questions & Answers

  What formula and information is needed to find the maximum

What is the formula to find the Maximum pressure on a form, and what information is needed to find the maximum pressure on the form?

  Determine the location on the wheel where the net

A wheel rolls to the right with an angular velocity of 2 rad/s while slowing down at a rate of 3 rad/s^2.. knowing the wheel rolls without sliding and ignoring the effect of gravity

  The given data show the result of a model known

The given data show the result of a model known as stopping sight distance, used by civil engineers to design roadways speed(mph) stopping sight distance(ft)

  Determine probabilities of different events of flood wall

A temporary flood wall has been constructed to protect several homes in the floodplain. the wall was built to withstand any discharge up to the 20-year period after all the homes have been relocated.

  Explain difference between waterproofing and damp proofing

Explain the difference between waterproofing and damp proofing. When is either an appropriate choice for protecting a foundation from moisture?

  Find the probabilities that among 20 such lights

the If the probability that fluorecent light has a useful life of at least 500 hours is 0.85, find the probabilities that among 20 such lights (a) 18 will have a useful life of at least 500 hours;

  Determine max force the hand can apply without fracturing

The force exerted on the hand causes torsion of the humerus. Let us assume the cross-section of this wrestler's humerus is approximated as hollow (the marrow has little structural strength) with an outer diameter of 19.0 mm and an inner diameter o..

  Determine the cycle time for a single engine scraper

Determine the cycle time for a single engine scraper rated at 21 cy heaped that is used to haul material from a pit to a fill 900 ft away under severe conditions.

  Find the horizontal and vertical forces exerted on the poll

What is the maximum weight that can be suspended on a 16 Kg poll, 3/5 from the end. The maximum tension of the 30 degree guy-wire is 1500 N. Find the horizontal and vertical forces exerted on the poll by the hinge.

  What is the maximum net weight possible

What is the maximum net weight possible for a picked load in this scenario - what is the rigger communicating to the crane operator

  How to determine the head loss caused by the piers

A bridge has cylindrical piers 1 m in diameter and spaced 15 m apart. Downstream of the bridge where the flow disturbance from the piers is no longer present, the flow depth is 2.9 m and the mean velocity is 2.5 m/s.

  Determine the clamping force applied by the tongs at e

Contain at least one two-force member. Solve by utilizing the two-force principle, where appropriate. If the weight of a body is not specifically stated, it can be neglected. Determine the clamping (vertical) force applied by the tongs at E.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd