In cost estimation, the total cost of a project is the sum of component task costs. Each of these costs is a random variable with a probability distribution. It is customary to obtain information about the total cost distribution by adding together characteristics of the individual component cost distributions this is called the roll-up procedure. For example, E(X1 + ... + Xn) = E(X1) + ... + E(Xn), so the roll- up procedure is valid for mean cost. Suppose that there are two component tasks and that X1 and X2 are independent, normally distributed random vari- ables. Is the roll-up procedure valid for the 75th per- centile? That is, is the 75th percentile of the distri- bution of X1 + X2 the same as the sum of the 75th percentiles of the two individual distributions? If not, what is the relationship between the percentile of the sum and the sum of percentiles? For what per- centiles is the roll-up procedure valid in this case?
Test of claim for the statement made for a given paired sample:
fairfield homes is developing two parcels near pigeon fork tennessee. in order to test different advertising approaches
if one card is drawn from a standard 52 card playing deck determine the probability of getting a jack a three a club or
the inflection points of a bell curve are at x 40 and x 52. what is the area under the bell curve between the
Out of a random sample 167 students pass an exam out of the 300. how do you calculate an exact 99% confidence interval for the proportion of sudents who passed the exam?
according to a recent survey about 33 of americans polled said that they would likely purchase reusable cloth bags for
If a single test is run and indicates that oil is present,what is the revised probability that oil is actually present.
An experiment was carried out to assess the impact of the variables x1 = force(gm), X2 = power (mW), x3 = temperature (C) and x4 = time (msec) on y = ball bond shear strength (gm). The results are given in the problem 5 Excel data file.
real estate apperaiser may use simple or stratifief sampling technigue to drawn random samplegenrate a random sample
In these questions we have to make a decision about the given claim. For example, if the claim is that a coin favors heads and sample results consists of 11 heads in 20 flips, conclude that there is not sufficient enough evidence to support the cl..
Create a hypothesis test which will investigate the variances. Label all steps for your test and show and label each step of the test procedure at a .1 level of significance.
Using your own experience, estimate the probability the local weather forecast is correct. Explain the rationale behind your estimate.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd