Pencil drawings for prestressed concrete bridge

Assignment Help Civil Engineering
Reference no: EM13995972

Pencil drawings for prestressed concrete bridge

Submission:

Pencil drawings for Prestressed Concrete Bridge

1 Introduction

Mount Lane Viaduct carries M2 Motorway over Mount Lane in Sittingbourne, Kent as shown on Figure 1. The grid reference is 583589E,163409N. You are requested to identify the structure from the historical drawing and make the structure more comprehensible by providing drawings for yourself.

1077_Location map of Mount Lane Viaduct.jpg

Fig.1 Location map of Mount Lane Viaduct

First, you should be able to interpret historical drawings into your pencil drawing using your engineering knowledge and judgement.

2 Description of structure

General
Mount Lane Viaduct (the viaduct) is an 8 span post-tensioned concrete bridge. Each span comprises 11 post-tensioned (PS) beams, and deck slab. Diaphragms span across the decking at every quarter point of PS girder.

Superstructure
The superstructure comprises Post-tensioned Pre-stressed beams and a deck slab. All the superstructure concrete is built insitu. The PS beams and deck slab were cast at different stages and become monolithic at final stage.

Substructure
The substructure comprises crosshead, intermediate piers, abutments and spread foundations. The cross section of the pier is rectangular and height-tapered. The crossheads are heavily reinforced with longitudinal reinforcement, stirrups and bent up bars. The crossheads and PS beams are monolithic after construction. Longitudinal reinforcement in the crossheads penetrates through the PS beam.

Construction sequence
It is essential to understand the construction sequence for analysis and design of prestressed concrete. You should identify the following construction sequence from history drawings and comment it on your drawings accordingly.

• Stage 1: Construction of pier
• Stage 2: Temporary work for superstructure and crosshead
• Stage 3: Off-site casting PS beam, and positioning; All
• Stage 4 Prestressing PS beams off site
• Stage 5 Positioning PS beam on crosshead, All
• Stage 6 Casting of crosshead and PS beams into monolithic structure
• Stage 7: Casting of deck slab
• Stage 8: Surfacing and parapets

As inferred from the above, the articulation of the structure changed during construction.

Consequently, the load effect is governed by the construction sequence.

Dead load, excluding surfacing, and PS force acts on simply supported beam. The PS force is intended to compensate Dead Load effect. Live load and surfacing load act on continuous beams. The resulting load effect is the sum of the load effects of the different construction stages.

Historic Record Drawings

The drawings listed in Table 1 are available in Blackboard. The quality of drawings are poor. However, students should recognize that it is engineers' responsibility to interpret the history data for modern engineering project such as redevelopment, strengthening and structural assessment.

Drawing Number

Title

529/C3/27

General Arrangement

529/AC3/27.1

Details of Beam - Sheet 1

529/AC3/27.2

Details of Beam - Sheet 2

529/AC3/27.3

Details of Beam - Sheet 3

529/AC3/27.4

Details of Beam - Sheet 4

529/AC3/27.5

Details of Beam - Sheet 5

529/AC3/27.6

Details of Beam - Sheet 6

3 Tasks

Based on the information in section 1 and 2, produce two A3 size pencil drawings. Assume that drawings are used to make the client understood the overall structure at initial stage of the project.

Your pencil drawings will be reproduction of the historical drawings and include

(1) Plan, Elevation, Section

(2) Detailed dimensions of typical beam.

(3) Key information based on your engineering judgement.

Omit from drawings

Reinforcement, tendon in elevation, abutment, wing wall,

Marking criteria

Your pencil drawing will be marked based on the level of comprehensibility. The following criteria affects the comprehensibility.

• Your understanding of the structure and interpretation of record drawings.
• Legibility of lines and handwriting
• The presence of key information; level, dimensions, etc.
• Drawing scale and layout,
• Drawing notes
• Quality of scanning, and pdf page editing

Recommended tool

You may use any form of non-electric drawing tool. The following tools are recommended.

• Automatic pencil with 0.5mm 2H, 3H, 4H pencil lead
• Hard eraser.
• Transparent graph ruler 30cm long, template ruler, curved ruler.
• A3 sheet; graphed or plain

Reference no: EM13995972

Questions Cloud

Determine the charge on the bead : The potential difference between a point 2.2 mm from the surface of the bead and a point 4.2 mm from the surface of the bead is 500 V. What is the charge on the bead?
Determine the change in mass of the water : 2.3 kilograms of water are changed (a) from ice at 0oC into liquid water at 0oC and (b) from liquid water at 100oC into steam at 100oC. For each situation, determine the change in mass of the water.
What is the average density in kilograms per cubic meter : What is the average density, in kilograms per cubic meter, of the full gas can, taking into account the volume occupied by steel as well as by gasoline?
Provide an overview of company payment policy : Provide an overview of this company's payment policy including: the objective of payment policy, the costs of paying early, the costs of late payment and the mechanics of bill paying
Pencil drawings for prestressed concrete bridge : Understanding of the structure and interpretation of record drawings - Pencil drawings for Prestressed Concrete Bridge
What is the final speed of the girl-cart system : A 23 kg girl is standing on a 2.0 kg cart on a frictionless surface. She is at rest. She then throws a heavy 8.9 kg rock, giving it a speed of 7.5 m/s. What is the final speed of the girl/cart system?
What is the magnitude of the electric field e : Let B = the magnitude of the magnetic field of an EM wave; f = the frequency of the wave; and c = the speed of light. What is the magnitude of the electric field E?
When an economy is at full employment : When an economy is at full employment, the Production Possibilities Frontier illustrates which Principle of Economics: A. Prices rise when the government prints too much money. B. Trade can make everyone better off. C. People respond to incentives. D..
Oligopoly are mutually interdependent means that each firm : The fact that the firms in an oligopoly are mutually interdependent means that each firm:

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine when the queue will dissipate

A toll booth on a turnpike is open from 8:00AM to 12 Midnight. Vehicles start arriving at 7:45AM at a uniform deterministic rate of six per minute until 8:15AM and from then on at two per minute

  What is interaction force in ferris wheel framework and seat

The pivot of each 120 kg seat on a Ferris wheel travels in a circle with a 10 m radius, and the Ferris wheelrotates witha rotational speed of 0.1 rad/sec. What is the interaction force between the ferris wheel framework and the seat H when angle Q..

  How do you classify a structure as determinant

If the design speed of a multilane highway is 60 mph, what is the minimum sight distance that should be provided on the road if (a) the road is horizontal and (b) the road has a maximum grade of 5%? Assume the perception/reaction time is 2.5 seconds...

  What is the minimum allowable speed of rotation

A steel shaft with a diameter of 40mm and length of 1.1m transmits 60hp from an electric motor to a compressor. If the allowable shear stress is 50MPa and the allowable angle of twist is 1.5 degrees

  What is the step method for drawing raft foundation

A long line of burning agricultural waste emits 0.3 g/m/s of particulate matter on a clear fall afternoon with winds blowing 3 m/s perpendicular to the line. Estimate the ground-level particulate concentration 400 m downwind from the line.

  Derive equation for the torque in terms including resistance

A movable cone fits inside a stationary conical depression. If a torque is applied to the cone, the cone will rotate at a certain speed depending on the angles θ and β, the radius r o, and the viscosity μ of the liquid.

  What will be the grease concentration

A home washing machine removes grease and dirt from clothes in a first-order process in which 12% of the grease on the clothes is removed per minute. The washing machine holds 50.0L of water and has a wash cycle of 5.00 minutes before discharging the..

  Calculate the compression resistance of 2 column which is

Calculate the compression resistance of 200 UC 59.5 column which is 3.6 m high (between lateral supports). Both ends of the stanchion are held effectively in position but only one is also restrained in direction. Use grade 43 steel

  Determine what is the standard deviation of the average time

The viscosity of a fluid can be measured in an experiment by dropping a small ball into a calibrated tube containing the fluid and observing the random variable X, the time it takes for the ball to drop the measured distance.

  Determine when would the wells start interfering each other

One of the wells pumps at a rate of 1,240 m^3/ day. The second well pumps at 850 m^3 / day. If the aquifer has a T= 2000m^2 / day and a storage coefficient of 0.0004, when would the wells start interfering each other

  What is turbine work output per kilogram of steam circulated

Steam enters the turbine of a single vapor power plant with a pressure of 10 MPa and a temperature of 580 C and expands adiabatically to 6 kPa. The isentropic turbine efficiency is 85%.

  What torque is required to drive the disk

A 2.25 Adisk spins within an oil-filled enclosure,having 2.4-mm clearance from flatsurfaces each side of the disk. The disk surface extends from radius 12 to 86 mm.What torque is required to drive the disk at 660 rpm if the oil's absoluteviscosity is..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd