Part i truefalse1 supply chains are referred to as value

Assignment Help Operation Management
Reference no: EM13372579

Part I: True/False

1. Supply chains are referred to as value chains because they reflect the concept that value is added as goods and services progress through the chain.

2. Delayed differentiation is a means of increasing product variety at low setup costs and transportation costs.

3. One important use of inventories in manufacturing is to decouple operations.

4. A two bin system is an example of a perpetual inventory system.

5. Using the EOQ model, the higher an item's carrying costs, the more frequently it will be ordered.

6. An operations management strategy toward the JIT philosophy should recognize that conversion to a JIT system requires a total and unconditional commitment from the outset.

7. JIT purchasing requires frequent contract bidding by multiple sources to ensure the buyer of competitive prices.

8. JIT systems typically require that suppliers be able to provide large lots at regular intervals.

9. The primary purpose of statistical process control is to detect a defective product before it is shipped to a customer.

10. Continuous improvement is a philosophy that seeks to make improvements whenever a process is creating problems.

11. A company's supply chain involves the flow of materials and information from suppliers, through production, to the end users.

12. The goal of supply chain management is to synchronize supply and demand of all of the entities of the chain.

13. The faster material passes through the supply chain, the higher the inventory costs will be, and the faster products and services will be delivered to the customer.

14. Optimization of the supply chain is achieved by maximizing the velocity of information transfer.

15. Non-random variation is likely whenever all observations are between the lower (LCL) and upper (UCL) control limits.

16. An example of inventory holding cost is the cost of moving goods to temporary storage after receipt from a supplier.

17. A basic requirement for operating with low inventories in Lean systems is that major system problems must already have been solved.

18.  In a "pull system" accumulated inventory in front of a workstation indicates problems at that workstation.

19.  The major difference between kanban and management resource planning (MRP) in scheduling the products to be built is that kanban is primarily a manual system.

20. Lean systems are primarily designed for repetitive manufacturing operations, and have limited application to services.

21. JIT II is a philosophy that involves empowering suppliers to assume some of the responsibilities ordinarily done by a company's own buyers.

22. The materials in a supply chain flow toward the end of the chain and the information moves toward the beginning of the chain.

23. Design of a supply chain and partnering are examples of operating issues of a supply chain.

24. Starting with the final customer and moving backward through the supply chain, batch sizes and the level of safety stock tend to decrease.

25.  The optimization of the supply chain is to determine the optimal number of business organizations to be included in the chain.

Part II Multiple Choice: Answer each of the Following:

1) Which of the following is not usually a characteristic of successful high-volume systems?

a. Smooth workflow through the system

b. Customized output

c. Rapid repair of breakdowns

d. Minimal quality problems

e. Reliable supply schedules

2) The JIT concept:

a. Was developed by the Japanese

b. Was operational at Henry Ford's complex in the 1920's

c. Is a production planning and control system

d. Is an inventory control system

e. All of the above

3) JIT systems typically use layouts which:

a. Are based on processing requirements

b. Enable moving parts in large lots

c. Facilitate handling dissimilar product

d. All of the above

e. None of the above

4) A basic requirement for operating with low inventories in JIT systems is:

a. Inventory space must be saved

b. Inventory investment must be saved

c. Major problems must be uncovered

d. Major problems must have been solved

e. Inventories must be reduced rapidly.

5) Which of the following is not a requirement for effective inventory management?

a. A priority system

b. A demand forecast

c. Estimates of carrying and ordering costs

d. Variability of usage and/or lead times

e. All of the above are necessary

6) Supply chain response time is a measure of performance regarding:

a. Reliability

b. Flexibility

c. Expenses

d. Utilization

e. None of the above

7) Successful continuous improvement must have:

a. Support and involvement of management

b. Significant changes in organizational culture

c. Grass roots participation

d. All of the above

e. None of the above

8) Which of the following is not a measure of the reliability of a supply chain?

            a. Supply chain response time

            b. On-time delivery

            c. Fill rate

            d. All of the above are measures

            e. None of the above is a measure

9) Which of the following is not on a list of relevant costs of inventory?

a. Shortage

b. Carrying

c. Order

d. Holding

e. Overtime

10) An operations strategy toward the JIT philosophy of production should recognize that JIT:

a. is most suited for non-repetitive manufacturing 

b. cannot be implemented sequentially

c. requires a wholesale commitment from the outset 

d. may provide a competitive advantage

e. all of the above 

11) Which of the following is not one of the building blocks that are the foundation of JIT?

            a. product design

            b. process design

            c. personnel/organizational elements

            d. manufacturing planning and control

            e. Kanban

12) Which of these would not be a factor in determining the reorder point?

            a. the EOQ

            b. the lead time

            c. the variability of demand

            d. the demand or usage rate

            e. all are factors

13)  In a two bin inventory system, the amount contained in the second bin is equal to the:

a. ROP

b. EOQ

c. Amount in the first bin

d. Optimum stocking level

e. Safety stock

14) Which of the following is not an assumption of the basic EOQ model?

            a. The usage rate is constant

            b. Only one product is involved

            c. Holding costs are independent of price

            d. Each order is received in a single delivery

            e. There are no quantity discounts

15) Which is not included in order costs?

            a. Typing up invoices

            b. Moving delivered goods to temporary storage

            c. Inspecting incoming goods for quantity

            d. Taking an inventory to determine how much is needed

            e. Temporary storage of delivered goods

Part III: Short Answer Questions.

Answer the following short answer essay questions and discuss in detail.

1. What is the Bullwhip effect and what are the principal causes as to why it occurs in a supply chain? What are the most important strategies that can mitigate its effects? Be specific and provide examples.

2. In what ways has technology improved the ability to manage supply chains? What tradeoffs are involved in sharing information with other organizations in a supply chain? Be specific and provide examples.

3. What are the three principal components of a Lean transformation? Discuss in detail and provide examples.

4. What is a Lean system intended to accomplish (philosophically) in a manufacturing or service setting and what are some of the main obstacles that must be overcome in converting from a traditional system to Lean? Be specific and provide examples.

Reference no: EM13372579

Questions Cloud

1a state the limit denition of the derivative fxb using the : 1.a state the limit de?nition of the derivative fx.b using the limit de?nition of the derivative compute fx when f x
You can solve this part a after read network a consider the : you can solve this part a after read network a consider the following electrical network and corresponding oriented
Managerial accounting1 scorpion production company planned : managerial accounting1. scorpion production company planned to use 1 yard of plastic per unit budgeted at 81 a yard.
Final portfolio projectthe final portfolio project is a : final portfolio projectthe final portfolio project is a formal report of your achievements in the course. the purpose
Part i truefalse1 supply chains are referred to as value : part i truefalse1. supply chains are referred to as value chains because they reflect the concept that value is added
Conduct some library research before writing your paper you : conduct some library research before writing your paper. you will need to use at least four academic research articles
Personal development class ethics personal responsibility : personal development class ethics personal responsibility in organization. write a reflection paper and follow accepted
Applied macro economicsquestion 1comment on the following : applied macro economicsquestion 1comment on the following statement the key feature of the production function is that
Despite a limited number of individual successes : despite a limited number of individual successes organisational change remains difficult to achieve and few companies

Reviews

Write a Review

Operation Management Questions & Answers

  What is the shape of the trash compactor life cycle

What is the shape of the trash compactor life cycle? this product is in relatively few homes. What problems can account for this poor acceptance

  What is the level production rate with no ending inventory

What is the ending inventory for month 4 under this plan? B) What is the level production rate with no ending inventory for month 4?

  What is the optimal solution

Formulate an LP model for this problem and implement your model in a spreadsheet and solve it - What is the optimal solution?

  Identify the risk threshold zones and discuss

Identify the risk threshold zones and discuss what actions each requires in managing risk.

  Illustrate how you would coach a subordinate in organization

Illustrate how you would coach a subordinate in your organization to write a business report OR memo.

  Identifying five differential costs

You are a management analyst for XYZ aircraft manufacturing company. Your company is considering either to purchase or lease manufacturing equipment.

  Should you take extra car

Gross profit is $40 per car per day rented. When re is demand for a car when n1 is available re is a goodwill loss of $80 and rental is lost. Each day a car is unused costs you $5 per car. If your industry can obtain another car for $200 for 10 da..

  Which of the following is not a simulation tool

Which of the following is NOT a simulation tool?

  Explain how should the device be constructed

An electronic device consists of 3 components. The 3 components are in series so that the failure of one component causes the failure of the device. Explain how should the device be constructed.

  Illustrate what is time between orders

Joe Henry's machine shop uses 2,500 brackets during course of a year. these brackets are purchased from a supplier 90 miles away. Subsequent information is known about brackets. . Illustrate what is time between orders.

  Compute the depreciation amount in the third year

Compute the depreciation amount in the third year and the BV at the end of the fifth year of life by each of these methods

  Illustrate what is the total cost of this policy

Explain how many tires should Rocky Mountain order each time it places an order. Illustrate what is the total cost of this policy.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd