Part-1

Your company operates an underground nickel mine producing 1.2 million tonnes of ore at a grade of 2.8% nickel. The orebody dips at 70° fairly regularly and is extensive along strike and down dip. Orebody width varies between 14 and 30 metres and averages 25 metres.

Until now the method of stoping has been by the sub-level blasthole stoping method, however due to dilution problems from a weaker than expected dunite hanging wall the decision to change mining method to mechanised transverse cut and fill stoping has been made. The UCS of dunite is 30 to 110 MPa.

The ore consists of a fine pentlandite disseminated in quartz dolerite. The UCS of the ore averages 250 MPA in a small range. The ore tends to be massive with little evidence of jointing or other structural features.

Cut and fill stope widths are to be 8 metres with 4m separating pillars, pillar recovery is to occur at a later date. Mining will be by 3 metre lifts using horizontal benching. Mechanised drilling is to be employed and 3m3 LHD's are to be used to haul ore to the mill holes. The mill holes are to be equipped with grizzlies with 0.5m apertures.

Occasionally the ground will be wet, but dry conditions are generally experienced.

1.Design the drilling/blasting pattern showing hole diameter, hole depth, burdens, spacings, explosive types, primers and initiation system and indicate the initiation sequence.

2.Select drill types, makes and models and estimate the number of drill units required to maintain production at existing levels. For the purposes of this exercise assume adjacent stopes can be accessed through pillars and that a 2 production shifts per day system is used

3. Calculate average figures for tonnes/round and powder factors in kg/tonne

Part-2

A gold mine has just completed mining waste pre-strip prior to commencing grade control mining. The waste rock was drilled and blasted for the pre-strip using 200mm diameter blast holes using a rotary blasthole drill and achieved a mining rate of 15,000 m3 per day. Blast parameters for the pre-strip were:

1.Blasthole burden5.7m
2.Blasthole spacing6.5m
3.Bench height15m
4.Subgrade drilling1.6m
5.ExplosiveANFOdensity 0.85 g/cc
6.Powder Factor0.57 kg/m3

Fragmentation in the waste was acceptable for the excavators; these will be used for grade control mining as well as bulk waste mining. Grade control mining is to be undertaken using 115mm diameter holes to achieve sampling control; these will be drilled using a tophammer hydraulic drill. Bench height for grade control mining is to be 5m.

The waste rock has a density of 2,600 kg/m3, ore has a density of 3,200 kg/m3 due to sulphides and alteration minerals.

1.Scale down the waste blast parameters from 200mm to 115 mm diameter blastholes and determine explosive consumption in the waste and ore rocks.

Note: in addition to ANFO the full range of Heavy ANFO's is available from the supplier.

2. Determine the drill metres required to achieve a production rate from grade control blasting of 6,000 m3/day

3. The penetration rate for the hydraulic drill is estimated to be 50m/hr. Determine the drill productivity based on one rod change that takes 30 seconds going down the hole and 45 seconds withdrawing it from the hole. In addition two samples are collected, this stops the drill for 30 seconds per sample and tramming between holes takes 1 minute 30 seconds.

4. Based on two 12 hour shifts per day, giving an effective 10.5 hours of drilling (assuming two 30 minute crib breaks and a 30 minute service period at the end of each shift) will one hydraulic drill be capable of the required production?

5.Based on the following accessory life calculate the accessory requirements and cost:

ShankLife 600 mCost $130.00
CouplingLife 500 mCost $85.00
Drill Steel (3.6m length)Life 1000mCost $230.00
Drill BitLife 210mCost $165.00

6. Calculate the total drilling cost per m3 based on the following:

Drill fuel $9.50 per drill operating hour
Drill labour cost $22.00/shift hour
Drill maintenance $11.50/drill shift hour
Ownership cost $11.50/drill shift hour based on 20,000 hours working life

7. Calculate the total drill and blast cost based on the following blasting costs:

Explosives $550.00/tonne
Blast initiation $11.30/blasthole
Blast labour $80.00/tonne of explosive

Reference no: EM13351313

Questions Cloud

Jake and janelle prised to prepare gourmet meals for : jake and janelle prised to prepare gourmet meals for friends and family. they started a business of preparing theme
Q1 the precursors of todays engineers listed in the : q1. the precursors of todays engineers listed in the quotation from wickenden had no classes and few or no books from
1 - choose one of these products-chocolate bars or bottles : 1 - choose one of these products-chocolate bars or bottles of expensive perfume-and describe how marketers can apply
Can you think of any financial innovation in the past ten : can you think of any financial innovation in the past ten years that has affected you personally? has it made you
Part-1your company operates an underground nickel mine : part-1your company operates an underground nickel mine producing 1.2 million tonnes of ore at a grade of 2.8 nickel.
1 time is important in roundabout production however not in : 1. time is important in roundabout production however not in direct production. is this statement true or false?
The demand function for newtons donuts has been estimated : the demand function for newtons donuts has been estimated as followsqx -14 - 54px 45py 0.62axwhere qx represents
1 a company is considering an expansion projectnbsp the : 1. a company is considering an expansion project.nbsp the companys cfo plans to calculate the projects npv by
1 describe how welfare creates work disincentives2 : 1. describe how welfare creates work disincentives.2. education is habitually used as an example of a positive

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the corresponding normal stress in the wire

An 18-m-long steel wire of 5-mm diameter is to be used in the manufacture of a pretested concrete beam.It is observed that the wire stretches 45 mm when a tensile force P is applied.

  Calculate the amount of water to be added per cubic meter

An undisturbed soil sample has a total unit weight of 19.4 kN/m3, a dry unit weight of 16.9 kN/m3, and a specific gravity of soil solids (Gs) of 2.69. If the sample could be saturated without changing its porosity, calculate the amount of water (i..

  Determine how many bits wide is the main memory data bus

A MIPS-based computer system with 2 GB of main memory that is built on a single circuit board. It is designed with a single control signal between the CPU chip and main memory, i.e. one bit of control that is set to one for Read operations

  Thermo-gravimetry of calcium oxalate1 evaluate the percent

thermo-gravimetry of calcium oxalate1. evaluate the percent mass loss for each of the three thermal events indicated

  What force-acting on the top edge to hold the gate shut

A 6ft wide, 10ft high vertical rectangular gate has its top edge 6ft below the water level. it is hinged along its lower edge. what force, acting on the top edge, is necessary to hold the gate shut

  Determine the annual precipitation in the basin

It is estimated that 60% of the annual precipitation in a basin with a drainage area of20,000 acres is evaporated. If the average annual river flow at the outlet (runoff) is 2.5 cfs, determine the annual precipitation in the basin.

  Determine the distributed loading that acts along the purlin

If the purlins are spaced 4 ft and the bents are spaced 25 ft apart, determine the distributed loading that acts along the purlin DF and the loadings that act on the bent at A,B,C,D, and E.

  How much will each leg shorten under the applied

given that E for the tube material is 70 GN/m2 and the stool legs are 75cm long, how much will each leg shorten under the applied compressive load (take g = 9.8m/s2)

  Draw the influence line for the shear in panel cd of girnder

Draw the influence line for the shear in panel CD of the girder. Determine the maximum negative live shear in panel CD due to a uniform live load of 500 lb/ft action on the top beams.

  What is the molar flow rate of the feed stream to the column

A mixture containing 45 wt% benzene and 55 wt% toluene is fed to a distillation column. An overhead stream of 95 wt% benzene is produced, and 8.0 % of the benzene fed to the column leaves in the bottom stream.

  Detyermine what is the percent voids in the total mix

An asphalt concrete mixture includes 94% aggregate by weight. The specific gravities of aggregate and asphalt are 2.65 and 1.0, respectively. If the bulk density of themix is 147 pcf, what is the percent voids in the total mix

  Compute the load shown on the hook load indicator

A rig accelerates a load of 200000 lbf from zero to 60 ft/min in 5 seconds. compute the load shown on the hook load indicator.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd