Water ways has two major public-park projects to provide with comprehensive irrigation in one of its service locations this month. Job J57 and Job K52 involve 15 acres of landscaped terrain which will require special-order sprinkler heads to meet the specifications of the project. Using a job cost system to produce these parts, the following events occurred during December 2012. Raw materials were requisitioned from the company’s inventory on December 2 for $5,061; on December 8 for $1,059; and on December 14 for $3,459. In each instance, two thirds (2/3) of these materials were for J57 and the rest for K52. Six time tickets were turned in for these two projects for a total amount of 18 hours of work. All the workers were paid $16.50 per hour. The time tickets were dated December 3, December 9, and December 15. On each of those days, 6 labor hours were spent on these jobs, two-thirds (2/3) for J57 and the rest for K52. The predetermined overhead rate is based on machine hours. The expected machine hour use for the year is 2,112 hours, and the anticipated overhead costs are $840,576 for the year. The machines were used by workers on projects K52 and J57 on December 3, 9, and 15. Six machine hours were used for project K52 (2 each day), and 8.5 machine hours were used for project J57 (2.5 the first day and 3 each of the other days). Both of these special orders were completed on December 15, producing 237 sprinkler heads for J57 and 142 sprinkler heads for K52. Additional job order activities during this period of time included: Dec. 1 Purchased raw materials from Durbin Supply Company on account for $53,200. Dec. 2 Issued $40,000 of direct materials from the company’s inventory to jobs other than K52 and J57 and $3,000 of indirect materials. Dec. 12 Paid Waterways factory salaries and wages in the amount of $65,000. Dec. 13 Paid the factory’s water bill of $9,000. Dec. 18 Transferred $50,000 of costs from other completed jobs to finished goods. Dec. 21 Paid the factory’s electric bill of $12,000 for Waterways factory. Dec. 31 Made adjusting entries for the factory that included accrued property taxes of $12,000, prepaid insurance of $8,800, and accumulated depreciation of $16,000. Instructions (a) Set up the job cost sheets for Job No. J57 and Job No. K52. Determine the total cost for each manufacturing special order for these jobs. (Round unit cost to nearest cent.) (b) Journalize the activities from these job cost sheets in the general journal. Also journalize the other costs that occurred during this period of time. (c) Assuming that Manufacturing Overhead has a debit balance of $3,600, determine whether overhead has been under/over applied and make the adjusting entry. (d) Why would Waterways choose machine hours as the cost driver for the overhead rather than direct labor cost? What would Waterways be likely to choose as the cost driver for the overhead for the job of installing the irrigation system and why?

Reference no: EM13777980

Questions Cloud

American dream of social mobility a myth : In your opinion, is the American dream of social mobility a myth? Why or why not? Defend your answer.
What safeguards support tools are embedded in patient care : What safeguards and decision-making support tools are embedded in patient care technologies and information systems that support safe practice at your facility?
Discuss expectations of changes in economic : Identify and discuss expectations of changes in economic, financial, and international conditions in the near future and identify the three most significant economic problems we currently confront. Also, identify the role monetary policy could play ..
Calculate the total family net worth : In 2000, in Country A, the average family net worth was $410,000, and there was about 6.1 x 10^7 families. Calculate the total family net worth Country A in 2000. Country A's total family net worth is what in dollars?
Overhead for the job of installing the irrigation system : Water ways has two major public-park projects to provide with comprehensive irrigation in one of its service locations this month. Job J57 and Job K52 involve 15 acres of landscaped terrain which will require special-order sprinkler heads to meet the..
Themartinweight loss clinic maintains two patient files : TheMartinWeight Loss Clinic maintains two patient files—one for male clients and one for female clients. Each record contains the name of a patient and current total weight loss in pounds. Each file is in descending weight loss order. Design the logi..
The amount that was invested in the mutual fund : An investor invested a total of $2,600 in two mutual funds. One fund earned a 7% profit while the other a 3% profit. If the investor's total profit was $138, how much was invested in each mutual fund? The amount that was invested in the mutual fund t..
Upstream and downstream sales : Pace Company owns 85% of the outstanding common stock of Sand Company and all the outstanding common stock of Star Company. Prepare in general journal form the work paper entries necessary to eliminate intercompany sales and intercompany profit in th..
The program write a program to analyze all integers : Part 1: The Program Write a program to analyze all integers contained in two text files. Both text data input files will contain an unknown number of integers (in the range 1 - 999), separated by whitespace. There may be duplicate integers in the fil..

Reviews

Write a Review

Financial Accounting Questions & Answers

  Calculate the predetermined overhead rate for 2012

Calculate the predetermined overhead rate for 2012, assuming Deglman Manufacturing estimates total manufacturing overhead costs of $980,000, direct labor costs of $700,000, and direct labor hours of 20,000 for the year.

  What is operating leverage

What is operating leverage and what is a cash budget, how is it calculated, and how might it be used when a firm is negotiating a loan from a bank?

  Recognizes revenue upon contract completion

A construction company entered into a fixed-price contract to build an office building for $18 million. Construction costs incurred during the first year were $6 million and estimated costs to complete at the end of the year were $9 million. The buil..

  Preparation of cash budget for a month

Preparation of cash budget for a month - Prepare a basic cash budget for the month of January

  Calculate and cost driver rates

Calculate and cost driver rates that are used for tracing appropriate amount of overheads to the said batch and ascertain the cost of batch of components using Activity Based Costing.

  What is unit product cost

What is total manufacturing cost assigned to Job 413 and what is unit product cost for Job 413?

  Prepare the journal entry to record the obligation cwml

Determine the cost CWML expects to incur in remediating the facility immediately after it closes inAugust 2032 and prepare the journal entry to record the obligation CWML faces as stipulated in the operatingpermit.

  1 the following are loziers 2010 and 2011 balance sheets

1. the following are loziers 2010 and 2011 balance sheets and income statements for the years ended december 31 2010

  Find the total cost of ending work in process inventory

Assume that the company uses the weighted-average method. - Find the total cost of ending work in process inventory and the total cost of units transferred to the next process in June.

  Prepare the third-quarter production budget for skis

Black diamond company produces snow skis. Each ski requires 2 pounds of of carbon fiber. the company’s management predicts that 5,000 skis, and 6,000 pounds of carbon fiber will be in inventory on june 30 of the current year and that 150,000 skis wil..

  Evaluate the amount of loss or activity x

What is Kelly's deductible theft loss in the existing year if the theft is not discovered, until January of the subsequent year?

  Preparing the bank reconciliation statement

Preparing the bank Reconciliation Statement and Prepare bank reconciliation as of 31 Oct from the following

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd