Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A canal is constructed parallel to a river 460m away both fully penetrating an unconfined aquifer of clean sand and gravel as shown. The aquifer has a hydraulic conductivity of k=18.5m/day and is subjected to an average infiltration of 1.6m/yr. The water surface elevation in the canal is 8.5m and in the river it is 10m, if the mound between the canal and the river gets contaminated and the river is to remain free of contamination. a) Determine the daily discharge of gw into the canal and river per km of both (b) estimate travel times from the water divide to the canal and to the river (ne=0.35) (c) assuming that the contaminant travels mainly by advection, propose any operational changes to the given layout to prevent the river from being contaminated.
Measure the distance PA, PB, PC etc. from p to various point with chain or tape and plot them to scale along the co responding rays. Join the points a, b, c, etc. to give outline of survey.
Determine the number of man-hours required to form the structure using data from R. S. Means or other appropriate reference. What is the difference between labor cost and labor pro-ductivity?
The velocity along a pathline is given by V (m/s) = s^2 x t^(1/2) where s is in meters and t is in seconds. The radius of curvature is 0.5 m. Evaluate the acceleration along and normal to the path at s = 2m and t = 0.5 seconds.
Pore water pressure is to be observed during the construction of the embankment. Calculate the pore water pressure which must not be exceeded at any point in the clay layer 9 m below the surface of the embankment to ensure a shear strength of 100 ..
Determine the horizontal spacing of the vertical drains if the drains are installed in triangular grid to reach 90% of primary consolidation in 1.5 years after the commencement of fill placement.
Find the expanded depth of the bed after the backwash when initial depth of the bed is 3 ft using given conditions. μ = 0.01g/cm/sec, T = 25oC, ρs = 2.65, ρ=1, washrate = 1.5 cm/sec, ks2 = 196. (Assumed single size)
Assume that during the analyze stage an obvious solution is discovered. Should that solution be immediately implemented and the remaining steps of DMAIC abandoned?
A slurry containing 20 percent by weight of limestone (CaCO 3 ) is processes to separate pure dry limestone from water. If feed rate is 2000kg/h, how much CaCO 3 is produced per hour?
At the end of 15 years, the first motor will have a salvage value of $50 and the second motor will have a salvage value of $100. consider the MARR to be 8%. (note : 1HP=0.7457 kw). Determine which motor should be installed based on the PW criterio..
Develop a simple urban constructed wetland design.
A sewage treatment works (STW) with 4 single-stage trickling filters has become organically overloaded due to the discharge of a biodegradable industrial effluent to the STW. This is causing effluent to pond on the surface of the filters.
What is the concentration of tracer in the reactor 1 h after tracer addition is terminated? The reactor had an initial concentration of tracer of 1.0 mg/L when tracer addition commenced.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd