Operation of feedback control systems

Assignment Help Other Engineering
Reference no: EM131077693

ELEC321Control Systems

M1A1 Textbook Activity: Operation of Feedback Control Systems

Instructions

Save this document and place your answers into it so you can submit it to the appropriate homework drop box. Handwritten solutions should be scanned and saved as a BMP, GIF, or JPG image, or scanned and pasted into this document.

Questions

Solve the following problems:

1.  Sketch a block diagram of an air-conditioning system in a car where the driver sets the desired interior temperature on a dashboard panel. Identify the function of each element.

2. The student-teacher learning process is inherently a feedback process intended to reduce the system error to minimum. Construct a feedback model, similar to Figure 1.3 (Below) in the textbook, of the learning process and identify each block of the system.

Discussion Question:

• Using a specific control system as an example (position control, temperature control, pressure control, flow control, etc.), describe how you would apply the four design steps to meet the design criteria.
Background and topic information:

In this module, we use the example of a DC motor speed control system to introduce the concepts of a control system, control system design criteria, and the design steps.

A control system is made up of interconnected components forming a system configuration that provides a desired system output (response). There are two types of control systems: open-loop control and closed-loop control. An open-loop control system has the following block diagram:

Figure 1. Block diagram of an open-loop control system (Dorf & Bishop, 2011).

Notice that there is no feedback loop in the diagram, and as a result, the actual output cannot be compared to the desired output. On the other hand, a typical closed-loop control system has the following block diagram:

Figure 2. Block diagram of a closed-loop control system (Dorf & Bishop, 2011).

The major difference here is that the actual output is fed back and compared to the desired output, and any error can be dealt with by the controller. Let's consider our DC motor speed control example. The input is the desired speed and the output is the actual speed. The actuator is a power amplifier, the process is the DC motor, the sensor is a tachometer, and the controller consists of op-amps and RLC components.

Suppose the input voltage is 10 V, representing an output speed of 1000 rpm, and the sensor ratio is 0.01. If the actual output is 1000 rpm, the feedback voltage is 1000*0.01 = 10 V, and the error is 0, so no action is needed from the controller. If, for some reason (like a sudden load increase), the actual rpm drops to 900, and the feedback voltage is now 9 V, then the error signal will be 10 - 9 = 1 V and is sent to the controller. The controller will send a signal to the actuator to increase its output to the process (motor) so as to increase the speed. This example shows that closed-loop (feedback) control in general works better than open-loop control because automatic speed control is achieved.

There are a few general criteria to follow when designing a control system:

1. Stability (absolute and relative): The system must be stable with a certain stability margin. This will be discussed more in Modules 5 and 7.

2. Steady-state error: This is the difference between the desired output and actual output at steady state. This value should be as small as possible. This will be covered more in Modules 3 and 4.

3. Transient response: This includes rise time, maximum overshoot, peak time, and settling time. These parameters must meet the requirements. We will cover this more in Module 4.

4. Sensitivity to parameter changes and disturbances: These values should be as small as possible and must meet the requirements. This will be discussed further in Module 3.

There are a few steps to follow in the design process in order to meet these design criteria:
1. Choose the sensors and actuators. Note that these are system dependent. For example, you will need a transducer, instead of a tachometer, as a sensor for a temperature control system.
2. Develop the process, sensor, and actuator mathematical models. Note that this is not an easy task in general and may require people with different areas of expertise. For example, a mechanical engineer is needed to develop a flow control model, while an electrical engineer is needed to develop a DC motor speed control model. The models can be in the forms of differential equations or transfer functions. This is covered further in Chapter 2 of the textbook.
3. Based on the models from step 2, design the controller to meet the control criteria. The controller is the only component in the block diagram whose mathematical model can be changed (or designed) at will. Therefore, the design of the controller is critical in meeting the criteria. We'll see more on this in Chapter 10 of the textbook.
4. Evaluate the design analytically, by simulation, and by actual system tests. Since actual system tests can be costly, they should be the last step of the design process.

Reference no: EM131077693

Questions Cloud

What leadership style should bjorn use : Swedish Attorney, Bjorn Liar has been asked to lead a group that will decide which of his firm's associates will be offered partner status. He's been asked to be more expressive and to include everyone in the decision-making process. What leadersh..
What does research tell us about effectiveness of product : Find an example of how applied psychology has been used to develop or improve a product in the interest of human well-being. Describe the product and explain how it is used to promote well-being.
Probability that the wallet belonged to a male guest : What is the probability that the wallet belonged to a male guest between the ages of 35 and 44?
Which technique manipulates antecedent conditions : Ashton studied the effect of wearing single-strap and double-strap backpacks on shoulder muscle contraction. He tested the same subjects in both single-strap and double-strap conditions to control individual differences in trapezius muscle activit..
Operation of feedback control systems : Save this document and place your answers into it so you can submit it to the appropriate homework drop box. Handwritten solutions should be scanned and saved as a BMP, GIF, or JPG image, or scanned and pasted into this document.
What is the probability that he or she is a person : what is the probability that he or she is a person with a graduate degree?
What you learned help you in your career : Evaluate and summarize two articles and state what you learned. If you were discussing the article with a colleague, what three important points would you want to explain? How can knowledge of what you learned help you in your career?
Tutor and a random sample : She obtains a random sample of 34 students who do not plan to take a tutor and a random sample of 38 students who do plan to take a tutor and obtains the following results.
What would you have done differently in terms of scope : Now, it is time to reflect on what went well and what didn't go so well. Based on feedback throughout the course, what would you have done differently in terms of scope, resources, and / or schedule, and why?

Reviews

Write a Review

Other Engineering Questions & Answers

  Provide a functional geometric design layout plan

Discuss other considerations that affect the decision about the type of intersection control and the overall functional design of the intersection - Calculate the capacity and degree of saturation of the main movements at the existing unsignalised..

  Frequency and period used by the free-running timer

1.How many free-running timers do we have in the HCS12? 2.TCNT of the HCS12 is ____-bit.

  Formulate a minimum cost flow problem

Represent the above problem as a network optimization problem. Particularly, you will need to formulate a minimum cost flow problem. Draw the network by defining the nodes, node values, and what they represent; and, the arcs, arc costs, arc capaci..

  Arena modify the airline terminal problem by adding agent

modify the airline terminal problem by adding agent breaks. the 16 hours are divided into two 8-hour shifts. agent

  What does the transfer function become

The high-frequency response of a direct-coupled amplifier having a dc gain of -1000 V/V incorporates zeros at ∞and 104 rad/s (one at each frequency) and poles at 103 rad/s and 105 rad/s (one at each frequency). Write an expression for the amplifier..

  What system engineering means to you

What system engineering means to you? Mention two or three primary benefits that a project/program can derive from the implementation of a well-organised System engineering process, when developing a new product a new product or system.

  Discussion-the promises and perils of nuclear power

The term nuclear power refers to the production of electrical energy via controlled nuclear reactions. These reactions generate heat that, in turn, creates steam that runs the generators to produce electricity

  Implement the linear convolution

We want to implement the linear convolution of a 10,000-point sequence with an FIR impulse response that is 100 points long. The convolution is to be implemented by using DFT s and inverse DFT s of length 256.

  Life cycle of public health partnerships

Explain the life cycle of public health partnerships. Why are collaborative partnerships important? What reasons or issues lead to the termination of partnerships?

  Determine the transfer function of the system

Determine the transfer function of the system and determine and plot the amplitude response of the system - Sketch the poles and zeros of the transfer function in the complex plane. Is the system BIBO stable?

  Paper on ilab

The Policy Statement, Processes, and Procedures Guidelines. In this lab, you will explore, select, and justify the selection of a secure wireless network for that (iLab 2) SOHO environment. You shall actually identify the hardware and software nee..

  Determine the density of the block

A solid cubical block of side length 0.6 m is suspended from a spring balance. When the block is in water, the spring balance reads 80% of the reading when the block is in air. Determine the density of the block.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd